                                                                                   Officer:            Patrick Murphy
                                                                                   Direct Telephone:   07 5329 6245
                                                                                   Our Reference:      MCU18/0102.03
                                                                                   Your Reference:     0806

                 23 February 2026


                 Bounce Hostel Noosa P/L TTE
                 C/- Pivotal Perspective Pty Ltd
                 3/93 Hilton Tce
                 TEWANTIN QLD 4565
                 [email protected]



                 Dear Sir/Madam,
                                          Decision Notice – Other Change
                                                       Planning Act 2016

                 I refer to your application and advise that on 19 February 2026, Council decided to approve
                 the application, subject to conditions.
                 Details of the decision are as follows:
                 1.      APPLICATION DETAILS

                     Application No:           MCU18/0102.03

                     Street address:           14-16 Mary St Noosaville Qld 4566

                     Real property description: Lot 4 RP 122928

                     Planning Scheme:          Noosa Plan 2020 (25 September 2020)

                 2.      DECISION DETAILS

                 The following type of approval was issued on 15 November 2018:
                 •      Development Permit for Material Change of Use of Premises (Visitor Accommodation
                        Type 4 Conventional)
                 In relation to the request to make an Other Change to the existing approval, Council on 19
                 February 2026, decided to approve the requested changes. The changes are detailed
                 below.
                 A.      Approve the Other Change to include the Food and Drink Outlet.
                 B.      Amend conditions 2, 4 and 65.
                 3.      CURRENCY PERIOD OF APPROVAL

                 The currency period for this development approval is 6 years starting the day that this
                 development approval takes effect.




                 ABN 97.969.214.121                                                              PO Box 141
                 noosa.qld.gov.au                                                         Tewantin QLD 4565
                 [email protected]                                                         07 5329 6500
                                                                                                             Page 1 of
                  15
Document Set ID: 24552191
Version: 4, Version Date: 23/02/2026
Full text of the other 14 pages

Page 2

                 4.     ASSESSMENT MANAGER CONDITIONS

                 PLANNING
                 When Conditions must be Complied With
                 1.     Unless otherwise stated, all conditions of this Decision Notice must be complied with
                        prior to the use commencing, and then compliance maintained at all times while the use
                        continues.
                 Approved Plans
                 2.     Development undertaken in accordance with this approval must generally comply with
                        the approved plans of development. The approved plans are listed in the following table
                        unless otherwise amended by these conditions.

                          Plan No.     Rev    Plan/Document Name                                     Date

                          A.001        15     Site Plan, prepared by Zest Design Noosa               11.02.2021

                          A.003        18     Basement Floor Plan, prepared by Zest Design 09.03.2021
                                              Noosa

                          A.004        18     Dimension Plan – Level 1, prepared by Zest Design 09.03.2021
                                              Noosa

                          A.005        17     Dimension Plan – Level 2, prepared by Zest Design 01.03.2021
                                              Noosa

                          A.006        15     Roof Layout Plan, prepared by Zest Design Noosa        11.02.2021

                          A.200        18     Elevations, prepared by Zest Design Noosa              09.03.2021

                          A.201        18     Elevations, prepared by Zest Design Noosa              09.03.2021

                          A.202        15     Interior Elevations, prepared by Zest Design Noosa     11.02.2021

                          A.300        15     Building Sections, prepared by Zest Design Noosa       11.02.2021

                 3      Development authorised by this approval must be undertaken generally in accordance
                        with the Approved Plans listed within this Decision Notice. The Approved Plans must
                        be amended to incorporate the amendments listed within this Decision Notice and
                        resubmitted to Council prior to the issue of any Development Permit for Operational
                        Works*
                        a.      A minimum 600mm eaves must be provided to the full extent of all buildings.
                        b.      The northern elevation must include variation of colours and materials to provided
                                increased articulation.
                        c.      The length of the 2.0 metre high acoustic fence on the western boundary must be
                                extended for the full length of the western boundary. A 2.0 metre high acoustic
                                fence must be installed for the full length of the northern boundary and the extent
                                of the eastern boundary adjacent to the residential property. All acoustic fencing
                                must be constructed to a minimum of 10kg/m2.




                                                                                                         Page 2 of 15
Document Set ID: 24552191
Version: 4, Version Date: 23/02/2026

Page 3

                        d.      Windows to guest rooms on the upper level of the western and northern elevations
                                must achieve minimum acoustic rating Rw 32 and the rooms must be provided
                                with air conditioning/mechanical ventilation to allow internal amenity to be
                                maintained whilst windows are closed to contain noise.
                        e.      All buildings must have a roof pitch of at least 5 degrees.
                        f.      No retaining walls or planter beds are to be constructed in the road reserve.
                        *(Refer to Advisory Note)
                        Nature and Extent of Approved Use
                 4.     122 beds are approved for the Visitor Accommodation Type 4 – Conventional (visitor
                        hostel). The approved Gross Floor Area is 1084m2. No pavilion may exceed 300m2 of
                        Gross Floor Area. The use area of the Food and Drink Outlet must not exceed 190m2.
                 5.     The approved accommodation units must be used for short term visitors only. The
                        approved units must not be occupied by persons for the purpose of permanent
                        accommodation.
                 6.     For the first 12 months of operation the café must not operate outside the hours of 7am
                        to 10pm. The approved hours will revert to 7am to 9pm at this time unless a written
                        request is received and approved by Council to alter the period of approval. In assessing
                        a request Council will have regard to any noise monitoring results, any complaints and
                        any other relevant matters. The results of the noise monitoring referred to in this Decision
                        Notice must be submitted as part of the written request.
                 7.     For the first 12 months of operation the use of the pool/sundeck area must not occur
                        outside of the hours of 7am to 10pm. The approved hours will revert to 7am to 9pm at
                        this time unless a written request is received and approved by Council to alter the period
                        of approval. In assessing a request Council will have regard to any noise monitoring
                        results, any complaints and any other relevant matters. The results of the noise
                        monitoring referred to in this Decision Notice must be submitted as part of the written
                        request.
                 8.     Deleted.
                 9.     Service vehicle movements on the premises (including loading and unloading) must not
                        occur outside the hours of 7am to 6pm Monday to Saturday and not at all on Sunday or
                        public holidays.
                 10.    Amplified music must not be audible at or beyond the boundaries of the site between
                        10pm and 7am.
                 11.    A receptionist/manager must be on-site at all times.
                        Building Height
                 12.    The maximum height of the southern pavilion must not exceed 9.50 metres above the
                        finished ground level and the natural ground level.
                 13.    Certification must be submitted to Council from a Licensed Surveyor which certifies that
                        the buildings do not exceed the maximum height requirement of this Decision Notice.




                                                                                                          Page 3 of 15
Document Set ID: 24552191
Version: 4, Version Date: 23/02/2026

Page 4

                 Landscaping
                 14.    The development site must be landscaped. The works must be undertaken in
                        accordance with an Operational Works approval, the Planning Scheme Policy 3
                        Landscaping Plants and Guidelines for that specific area and must include in particular:
                        a.      the works shown on the approved site plan.
                        b.      a minimum 2.0 metre wide landscaping strip along the Mary Street road frontage
                                of the subject site, exclusive of the access driveway, generally uncompromised by
                                infrastructure items.
                        c.      A minimum 1.5 metre wide landscaping strip along the full extent of the eastern
                                and western boundaries.
                        d.      a 3.0 metre wide vegetated screening of northern elevation of the northern pavilion
                                from the adjoining properties in Anne Street, designed such that vegetated
                                screening will be provided within 3 years of the plantings occurring.
                        e.      vegetated screening of the acoustic barrier adjacent to the western boundary in
                                accordance with the conditions of this Decision Notice
                        f.      vegetated screening of any electrical transformers, bin storage areas and the like
                                from the road frontage
                        g.      provision of 1 street tree within the road reserve for every 8 metres of road frontage
                 15.    All landscape works must be established and maintained in accordance with the
                        approved design for the life of the development, and in a manner that ensures healthy,
                        sustained and vigorous plant growth. All plant material must be allowed to grow to full
                        form and be refurbished when its life expectancy is reached.
                        Performance Bond
                 16.    Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
                        must be submitted to Council, to secure performance of all conditions of this approval,
                        prior to the issue of a Development Permit for Operational Works. The cash bond or
                        trading bank guarantee will be returned on performance of the conditions of approval
                        less any costs incurred by Council in respect of enforcing performance of this permit.
                        Council reserves the right to call upon the bond or guaranteed sum to effect compliance
                        with conditions.
                        Street Identification
                 17.    The street address of the development must be clearly visible and discernible from the
                        primary frontage of the site by the provision of a street number and, where appropriate,
                        the building name.
                 18.    The building entrance or reception area must be clearly visible and identifiable from the
                        street or otherwise provided with signage and lighting at strategic locations to direct
                        people to the building entrance.
                        Water & Sewer Connections
                 19.    An underground connection to reticulated water and sewerage must be provided to the
                        development site in accordance with the standards and requirements of Northern SEQ
                        Distributor–Retailer Authority (Unitywater).
                 20.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
                        (Unitywater) must be submitted to Council that certifies an underground connection to
                        reticulated water and sewerage has been provided to the development site.




                                                                                                            Page 4 of 15
Document Set ID: 24552191
Version: 4, Version Date: 23/02/2026

Page 5

                        Building Appearance
                 21.    All air conditioning units or other mechanical equipment must be located at ground level,
                        or otherwise fully enclosed or screened such that they are not visible from the street
                        frontages nor adjoining properties.
                 22.    All deck and balcony areas above ground floor must not be enclosed by permanent
                        fixtures such as shutters, louvres, glass panelling or the like, except where required to
                        satisfy any privacy condition of this Decision Notice.
                        Advertising Devices
                 23.    Advertising devices must comply with the requirements of the Advertising Devices Code.
                 24.    Construction signage, including that on hoardings, shade cloth and cranes but not
                        including statutory safety signage, shall not exceed a total of 4m2 to each of the site’s
                        street frontages.
                        Fencing and Walls
                 25.    Any street fencing must be setback an average of 1 metre from the front property
                        boundary. Any fencing on the front boundary must either:
                        a.      not exceed a maximum height of 1.2m
                        b.      be of open construction.
                 26.    The area of land between the fence and the front property boundary must be densely
                        landscaped to screen any fencing from the street.
                        Clothes Drying Areas
                 27.    Each rooming unit must be provided with access to an outdoor clothes line which is
                        screened from public view.
                        Protection of Privacy
                 28.    To ensure privacy is protected between adjoining properties, any window/s, deck or the
                        like that overlooks or has the potential to overlook the private open space or habitable
                        room windows of neighbouring properties must either:
                        a.      have a minimum window sill height or 1.5 metres above floor level
                        b.      be fitted with translucent glazing
                        c.      be fitted with a fixed external screen
                        Communal Recreation Areas
                 29.    Communal recreation area/s must be provided as shown on the approved plans.
                        Amalgamation of Lots
                 30.    Lots 3 and 4 on RP 122928 must be amalgamated prior to the commencement of use.
                 ENVIRONMENTAL HEALTH
                        Amenity
                 31.    The development must be undertaken and operated in a manner that causes no
                        detrimental effect upon the amenity of the neighbourhood by reason of the creation of
                        excessive noise, lighting, air-borne hazards, atmospheric pollutants (including dust or
                        odours) nuisance or any other emissions in accordance with the nuisance provisions of
                        the Environmental Protection Act 1994.




                                                                                                       Page 5 of 15
Document Set ID: 24552191
Version: 4, Version Date: 23/02/2026

Page 6

                 Noise Nuisance
                 32.    Noise emission from mechanical equipment shall comply with the following
                        requirements:
                        a.      Air-conditioning and Refrigeration
                                i.     7am to 10pm: Maximum background + 5dB(A)
                                ii.    10pm to 7am: Maximum background + 3dB(A)
                        b.      Pumps
                                i.     7am to 7pm: Maximum background + 5dB(A)
                                ii.    7pm to 10pm: Maximum background + 3dB(A)
                                iii.   10pm to 7am: No audible noise.
                 33.    Air conditioning units and swimming pool filtration plant shall be located within the
                        undercover carpark.
                 34.    Kitchen exhaust points for the development must be located and operated in accordance
                        with Australian Standard AS1668.2-2002 “The use of ventilation and air-conditioning in
                        buildings” (specifically Section 5.10 – Air Discharges).
                 35.    Submission of written certification from a suitably qualified person confirming that the
                        noise levels from all mechanical equipment comply when measured at either the
                        residential boundary or outside the most exposed part of an affected building, whichever
                        is the closest to the equipment.
                        The assessment and certification is required immediately after installation of the
                        equipment and prior to any occupation of the building, and in a format approved by
                        Council. All equipment should be operating at the same time to test the overall noise
                        level created.
                 36.    Speakers located in outdoor areas of the site must be selected to be low power, installed
                        as a distributed speaker system and controlled from a central volume control unit
                        accessible to staff only and fitted with an electronic noise limiter such that speakers do
                        not operate at noise levels which exceed 75 dB(C) at 3 metres from the source at any
                        time. Speakers must be located and oriented such that they are not be directed towards
                        off-site residential areas. There is to be no live entertainment on site.
                        Outdoor Lighting Devices
                 37.    Lighting associated with the use must be designed, sited, installed and tested to comply
                        with Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the obtrusive
                        effects of outdoor lighting” using a control level of 1.
                 38.    Certification must be submitted to Council from a qualified person which certifies that all
                        outdoor lighting devices comply with the requirements of this Decision Notice at the time
                        of commissioning.
                        For the purpose of certifying outdoor lighting devices for the development, a qualified
                        person is:
                        a.    Registered Professional Engineer of Queensland;
                        b.    an environmental or electrical design consultant with a minimum of 3 years current
                              experience in the field of outdoor lighting.




                                                                                                         Page 6 of 15
Document Set ID: 24552191
Version: 4, Version Date: 23/02/2026

Page 7

                        Building Demolition/Removal/Relocation
                 39.    Where the development involves the removal, relocation or demolition of a building, a
                        Waste Management Plan (construction and demolition) in accordance with Planning
                        Scheme Policy 11, Waste Management Plans must be submitted and approved by
                        Council’s Environmental Health Officer prior to issue of a development permit for
                        operational works for demolition, removal or relocation of any building other than a shed.
                        The purpose of the Waste Management Plan is to facilitate the segregation of waste for
                        the effective reuse and recycling of such materials. Segregated wastes attract
                        significantly reduced disposal fees at the landfill with some items free. Higher gate fees
                        are charged for mixed waste.
                        Waste storage areas must provide adequate separation of all reusable, recyclable and
                        waste materials. These must be located so that they are convenient and safe to use.
                        The Plan must contain the following information:
                        a.     The site area for the storage and separation of waste is to be shown on the plan
                               drawings accompanying the application.

                        b.     A waste management table as indicated below is to be completed showing how
                               waste material is to be segregated - recycled – reused or disposed.
                                      MATERIALS ON-SITE                             DESTINATION

                                                                       Re-use and Recycling                Disposal

                             Expected          Estimated          On-site           Off-site            *specify
                                  waste              volume(m³)         *specify           *specify           contractor
                                  materials                             proposed           contractor         and
                                                                        re-use or          and                landfill
                                                                        on-site            recycling          site     or
                                                                        recycling          outlet             other
                                                                        methods                               disposal
                                                                                                              site

                             Excavation
                                  material

                             Green waste

                             Bricks

                             Concrete

                             Timber-please
                                  specify

                             Plasterboard

                             Metals - please
                                   specify

                             Asbestos

                             Other - please
                                   specify
                        c.     Table – Waste Management Table




                                                                                                               Page 7 of 15
Document Set ID: 24552191
Version: 4, Version Date: 23/02/2026

Page 8

                        Note *If a demolition contractor is undertaking works, then the Waste Management table
                        is to be completed by the demolition contractor.
                 WASTE
                 40.    The developer must provide waste storage and disposal facilities in accordance with
                        Planning Scheme Policy No. 9 "Waste Management Multi-Dwellings and Commercial
                        and Industrial Premises". The facilities must include an external impervious area
                        correctly sized for all refuse and recycling containers and suitably screened from public
                        places and neighbouring properties. A bin wash area is required with a cold-water tap,
                        hose and drain outlet connected to sewer, via a bucket trap. The drain outlet must be
                        designed to prevent storm water entry to the sewerage system. This can be achieved
                        with a nib wall 50mm high and up to 700mm x 700mm wide (max 0.5m2) , or alternatively
                        the waste area can be roofed, or any other design approved by Council.
                 41.    Refuse containers must be provided in accordance with the requirements of the
                        Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
                        Regulation 2000, for the storage and collection of refuse.
                 42.    Bins must be provided throughout the site to reduce littering. All bins provided must be
                        for refuse and recycling and be decanted into the bulk bins by the site operators.
                 ENGINEERING
                 Site Specific Conditions
                 43.    The proposed flood barrier must be of a design that is activated by the rising flood levels
                        and the associated hydraulic differential to raise and lower the barrier. The barrier must
                        not require a power supply or human intervention. The barrier must be maintained by
                        the property owner in accordance with the manufacturer’s specifications. The works
                        must be undertaken in accordance with an Operational Works approval and must
                        include in particular:
                        a.      Certification from a Registered Professional Engineer of Queensland (RPEQ) that
                                states that the design of the barrier is suitable for its intended use.
                 44.    The development must include an internal stairwell connecting the basement level to the
                        upper floor. The stairwell must be located and constructed to provide an escape route
                        for people to evacuate the basement in the event the barrier and/or pump system fails.
                        Plans submitted as part of any subsequent operational works and building permit must
                        clearly indicate the stairwell.
                        External Works
                 45.    Mary Street must be upgraded for the length of its frontage to the subject site. The works
                        must be generally in accordance with drawing number 17699-SK100 Revision A
                        prepared by TOD Engineers and Project Managers dated 17 August 2018. The works
                        must be undertaken in accordance with an Operational Works approval and must
                        include in particular:
                        a.      construction of new kerb and channelling offset 7.5m (3.5m lane and 4m of cycle
                                lane/parallel parking) from the northern side of the existing landscaped median;
                        b.      suitable transitions from the new kerb line to join with the existing kerb at the
                                western and eastern end;
                        c.      landscaping of the verge area;
                        d.      construction of a pedestrian footpath in accordance with the conditions of this
                                Decision Notice;




                                                                                                         Page 8 of 15
Document Set ID: 24552191
Version: 4, Version Date: 23/02/2026

Page 9

                        e.      removal of the existing property accesses and reinstatement of the kerb, footpath
                                and verge area to match the balance of the site frontage, including the provision
                                of topsoil and turf where the existing verge is grassed.
                        Condition 45 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                        infrastructure.
                        Site Access and Driveways
                 46.    A sealed access driveway must be provided from Mary Street to all parking and
                        manoeuvring areas of the development. The works must be undertaken in accordance
                        with an Operational Works approval and must include in particular:
                        a.      driveway crossovers generally in accordance with Council’s Standard Drawing
                                Number RS-051 and any associated addendum.
                        b.      suitable safety measures, including warning signage, to improve driver awareness
                                of the flood barrier, service vehicles and pedestrians and to enhance driver and
                                pedestrian safety. Warning signage must be provided near the exit ramp from the
                                underground parking area and the guest/service area to warn motorists of
                                pedestrian movement along the frontage street.
                        Car Parking
                 47.    A minimum of 17 car parking spaces, inclusive of 1 courtesy bus space, must be
                        provided and marked on the site and made available and accessible at all times while
                        the use is open for business. The works must be undertaken in accordance with an
                        Operational Works approval and must include in particular:
                        a.      13 customer parking spaces (including 4 scooter spaces) within the total, which
                                are clearly marked for that purpose and accessible at all times for visitor use.
                        b.      3 staff parking spaces within the total, which are clearly marked for that purpose.
                        c.      1 courtesy bus space within the total.
                        d.      2 disabled parking space/s within the total.
                        e.      dimensions, crossfalls and gradients in accordance with Australian Standard
                                AS2890: Parking Facilities.
                        f.      Provision of 20 bicycle parking spaces.
                 48.    All car parking areas and access driveways must be maintained exclusively for vehicle
                        parking and manoeuvring and kept in a tidy and safe condition at all times.
                 49.    Directional signage must be provided to direct visitors and customers to the car parking
                        spaces provided on site.
                 Service Vehicles
                 50.    Service vehicle parking, manoeuvring and standing spaces must be provided on the site.
                        The works must be undertaken in accordance with an Operational Works approval.
                 Pedestrian and Bicycle Facilities
                 51.    Pedestrian and bicycle facilities must be provided for the development. The works must
                        be undertaken in accordance with an Operational Works approval and must include in
                        particular:
                        a.      a 2 metre wide footpath within the road verge for the entire length of the site’s
                                frontage to Mary Street.
                        Condition 51 is imposed pursuant to s128 of the Planning Act 2016 being necessary
                        trunk infrastructure identified by Council’s LGIP to service the development.




                                                                                                          Page 9 of 15
Document Set ID: 24552191
Version: 4, Version Date: 23/02/2026

Page 10

                 Stormwater Drainage
                 52.    The site must be provided with a stormwater drainage system connecting to a lawful
                        point f discharge. The works must be undertaken in accordance with an Operational
                        Works approval and must include in particular:
                        a.      the works shown on drawing number 17699-SK101 Revision A prepared by TOD
                                Engineers and Project Managers dated 17 August 2018, with the inclusion of the
                                following:
                                i.     The storage tank must have sufficient capacity to cater for the runoff from
                                       the driveway in a 5 minute 1%AEP rain event as a minimum.
                                ii.    The basement structures (walls, floors and surfacing) must be constructed
                                       of materials suitable for the potential inundation and all service connections
                                       must be located a minimum of 300mm above the potential inundation level.
                 Acid Sulfate Soils
                 53.    All works must be carried out in accordance with an Acid Sulfate Soil and Groundwater
                        Management Plan for the development prepared by a qualified person* and referenced
                        in a Development Permit for Operational Works. The Acid Sulfate Soil and Groundwater
                        Management Plan must specifically address how lowering of the groundwater level as a
                        result of the works will be avoided.
                        *(Refer to Advisory Note)
                 54.    All waters, including stormwater runoff, groundwater seepage and leachate from acid
                        sulfate soils must achieve the following quality prior to release from the site:
                        a.    a pH range of 6.5-8.5 pH units
                        b.    50mg/L maximum total suspended solids concentration
                        c.    0.3mg/L maximum total iron concentration
                        d.    0.2mg/L maximum total aluminium concentration
                        e.    no visible plume at either the point of release from the site or within a waterway
                 55.    The basement must be designed and constructed as a water excluding structure in
                        accordance with Australian Standard AS3735 "Concrete Structures for Retaining
                        Liquids" to ensure groundwater does not enter the basement after construction is
                        completed.
                 56.    All treated material must undergo verification testing at the rate of one sample per
                        250m3 throughout the duration of the excavation phase of the development. The
                        verification testing must be undertaken by a qualified person* using the SPOCAS or
                        Chromium Reducible Sulphur testing suite, and the results must be submitted to
                        Council for appraisal.
                 Electricity and Telecommunication Services
                 57.    Unless otherwise stipulated by telecommunications legislation at the time of
                        construction, the development must be provided with all necessary conduits, pits and
                        pipes to accommodate the future connection of optic fibre technology
                        telecommunications.
                 58.    Certification must be submitted to Council from all relevant service providers which
                        certifies that the development has met the requirements of this Decision Notice and all
                        applicable legislation at the time of construction.




                                                                                                          Page 10 of 15
Document Set ID: 24552191
Version: 4, Version Date: 23/02/2026

Page 11

                 Earthworks and Retaining Walls
                 59.    All earthworks must be undertaken in accordance with an Operational Works approval,
                        and contained entirely within the subject site unless written permission from the
                        respective landowner(s) is provided to Council.
                 60.    All retaining walls must be designed and constructed in accordance with the planning
                        scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
                        walls that are publicly accessible and exceed 1.0m in height must be fitted with a
                        commercial grade safety fence.
                 Preparation of a Preliminary Construction Management Plan
                 61.    A preliminary Construction Management Plan must be submitted with the Operational
                        Works application and must address the following:
                        a.    traffic management during all aspects of the construction phase including:
                                i.     a Traffic Management Control Plan in accordance with the Manual of
                                       Uniform Traffic Control Devices (MUTCD) detailing all temporary
                                       signage and traffic control measures prior to construction
                                ii.    maintenance of safe pedestrian access for the areas affected by the
                                       works during and after daily construction has ceased
                                iii.   proposed fencing to the site during the construction phase of the
                                       development
                                iv.    approval of the Traffic Management Control Plan by the Department
                                       of Transport and Main Roads (DTMR) for any works on State
                                       controlled roads
                                v.     provision for worker car parking
                        b.      maintenance and protection of water quality and existing drainage lines through
                                the construction site, through the implementation of appropriate erosion and
                                sediment control measures
                        c.      works programme identifying key components of the works and their respective
                                durations
                        d.      establishment of a communication protocol with the general public, adjoining
                                owners, emergency services and local businesses to advise of agreed
                                construction times, impacts on traffic, services and other relevant issues
                        e.      identification of complaint management procedures including:
                                i.     contact details for the on-site manager
                                ii.    dispute resolution procedures
                        f.      details on the location of external fill/dump sites, the haulage route, type of vehicle
                                to be utilised during filling operations and frequency of usage. NB any damage to
                                the existing road system as a result of haulage operations shall be fully repaired
                                at the applicant’s expense
                        g.      it is acknowledged that the preliminary Construction Management Plan will be a
                                draft document requiring finalisation upon appointment of the Principal Contractor
                                employed to construct the works and a final document will be required to be
                                submitted at the Pre-Start Meeting for the project.




                                                                                                            Page 11 of 15
Document Set ID: 24552191
Version: 4, Version Date: 23/02/2026

Page 12

                 Damage to Services and Assets
                 62.    Any damage caused to existing services and assets as a result of the development
                        works must be repaired at no cost to the asset owner at the following times:
                        a.     where the damage would cause a hazard to pedestrian or vehicle safety,
                               immediately; or
                        b.     where otherwise, upon completion of the works associated with the development.
                        Any repair work which proposes to alter the alignment or level of existing services and
                        assets must first be referred to the relevant service authority for approval.
                 Noise Monitoring
                 63.    Deleted.
                 64.    Noise levels from on-site activities, including guests must not exceed the following levels
                        at the nearest sensitive receptor:
                        i.      7am to 6pm = 46 dB(A) LAeq,adj,T;
                        ii.     6pm to 10pm = 40 dB(A) LAeq,adj,T;
                        iii.    10.00pm to 7.00am = 35 dB(A) LAeq,adj,T
                 65.    A Food and Drink Outlet is approved and must be operated within the area identified on
                        the approved plans.
                 5.     REFERRAL AGENCIES

                 Not applicable.
                 6.     ADVISORY NOTES

                 The following notes are included for guidance and information purposes only and do not form
                 part of the assessment manager conditions:
                 ADVISORY NOTES:
                        Building and Construction Industry (Portable Long Service Leave) Levy
                 1.     The QLeave levy must be paid prior to the issue of a development permit where it is
                        required. Council will not be able to issue a Decision Notice without receipt of details
                        that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212
                        6855.
                        Co-ordination of Operational Works Assessment
                 2.     Additional application fees apply to Operational Work applications where the different
                        aspects of the works are lodged separately. Significant savings in application fees will
                        result if all works are lodged in a single application.
                        Preparation of a Preliminary Construction Management Plan
                 3.     A preliminary Construction Management Plan must be submitted with the Operational
                        Works application and must address the following:
                        a.      traffic management during all aspects of the construction phase including:
                                i.     a Traffic Management Control Plan in accordance with the Manual of
                                       Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
                                       and traffic control measures prior to construction
                                ii.    maintenance of safe pedestrian access for the areas affected by the works
                                       during and after daily construction has ceased




                                                                                                        Page 12 of 15
Document Set ID: 24552191
Version: 4, Version Date: 23/02/2026

Page 13

                                iii.   proposed fencing to the site during the construction phase of the
                                       development
                                iv.    approval of the Traffic Management Control Plan by the Department of
                                       Transport and Main Roads (DTMR) for any works on State controlled roads
                                v.     provision for worker car parking
                        b.      maintenance and protection of water quality and existing drainage lines through
                                the construction site, through the implementation of appropriate erosion and
                                sediment control measures
                        c.      works programme identifying key components of the works and their respective
                                durations
                        d.      establishment of a communication protocol with the general public, adjoining
                                owners, emergency services and local businesses to advise of agreed
                                construction times, impacts on traffic, services and other relevant issues
                        e.      identification of complaint management procedures including:
                                vi.    contact details for the on-site manager
                                vii.   dispute resolution procedures
                        f.      details on the location of external fill/dump sites, the haulage route, type of vehicle
                                to be utilised during filling operations and frequency of usage. NB any damage to
                                the existing road system as a result of haulage operations shall be fully repaired
                                at the applicant’s expense
                        g.      it is acknowledged that the preliminary Construction Management Plan will be a
                                draft document requiring finalisation upon appointment of the Principal Contractor
                                employed to construct the works and a final document will be required to be
                                submitted at the Pre-Start Meeting for the project.
                        Private Infrastructure
                 4.     All private infrastructure for the development must be designed to meet the planning
                        scheme requirements unless otherwise agreed by the relevant authority
                        Infrastructure Charges
                 5.     All developments and/or changes to existing developments may require payment of
                        “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
                        Resolution” made pursuant to the planning legislation and regulations current at the time
                        of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-
                        development/development-tools-guidelines/infrastructure-charges
                 7.     PROPERTY NOTES

                 Not applicable.
                 8.     VARIATION APPROVAL DETAILS

                 Not applicable.
                 9.     FURTHER DEVELOPMENT PERMITS REQUIRED

                  Type of Development Permit Required               Subject of the required Development Permit

                  Development Permit for Operational                Access, Stormwater, Landscaping,
                  Works                                             Earthworks, Roadworks and Frontage Works

                  Development Permit for Building Works             Private Certification




                                                                                                            Page 13 of 15
Document Set ID: 24552191
Version: 4, Version Date: 23/02/2026

Page 14

                 10.        SUBMISSIONS

                 Application - MCU18/0102
                 There were 5 properly made submissions about the application.
                 Application – MCU18/0102.02
                 There were 0 properly made submissions about the application.
                 Application – MCU18/0102.03
                 There were 0 properly made submissions about the application.
                 11.        RIGHTS OF APPEAL

                 You are entitled to appeal against this decision. A copy of the relevant appeal provisions from
                 the Planning Act 2016 is attached.
                 During the appeal period, you as the applicant may suspend your appeal period and make
                 written representations to Council about the conditions contained within the development
                 approval. If Council agrees or agrees in part with the representations, a negotiated decision
                 notice will be issued. Only one negotiated decision notice may be given.
                 12.        OTHER DETAILS

                 If you wish to obtain more information about the decision, electronic copies are available on
                 line at www.noosa.qld.gov.au or at Council Offices.


                 Yours faithfully,
                 Patrick Murphy
                 Manager | Development Assessment
                 Development & Regulation


                 Enc:       Appeal Rights
                            Infrastructure Charge Notice
                            Approved Plans/Documents

                 DECISION NOTICE HISTORY
                 •     Original Decision Notice – 15 November 2018.
                 •     Negotiated Decision Notice – 21 March 2019, with an amendment to conditions 36 ,52 & 64 and delete conditions 63.
                 •     Decision Notice – Generally in Accordance – MCU18/0102.01 – 20 April 2021.

                 •     Decision Notice – Other Change – MCU18/0102.02 – 18 January 2024, add additional condition 65 and delete condition
                       8.
                 •     Decision Notice – Other Change – MCU18/0102.03, with an amendment to conditions 2, 4 & 65.




                                                                                                                                Page 14 of 15
Document Set ID: 24552191
Version: 4, Version Date: 23/02/2026

Page 15

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –                                              1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and                                                application; and
                   (b) The person-                                                                (e) each person who may elect to become a co-respondent for the
                                                                                                      appeal, other than an eligible submitter who is not a principal
                         (i)   who may appeal a matter (the appellant); and
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and                 (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and             (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the                 person who the registrar considers appropriate.
                              matter.                                                         (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.                     (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –                                                             Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the          (5) A notice of appeal given to a person who may elect to be a co-
                       agency; or                                                                 respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the         (6) A person elects to be a co-respondent by filing a notice of election,
                       deemed refusal happens; or                                                 in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter            appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of        231 Other appeals
                       premises – 20 business days after a notice us published under
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                       section 269(3)(a) or (4); or
                                                                                                  the Supreme Court decides a decision or other matter under this
                   (d) for an appeal against an infrastructure charges notice – 20                Act is affected by jurisdictional error, the decision or matter is non-
                       business days after the infrastructure charges notice is given             appealable.
                       to the person; or
                                                                                              (2) The Judicial Review Act 1991, part 5 applies to the decision or
                   (e) for an appeal about a deemed approval of a development                     matter to the extent it is affected by jurisdictional error.
                       application for which a decision notice has not been given –
                                                                                              (3) A person who, but for subsection (1) could have made an
                       30 business days after the applicant gives the deemed
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                       approval notice to the assessment manager; or
                                                                                                  decision or matter, may apply under part 4 of that Act for a
                   (f)   for any other appeal – 20 business days after a notice of the            statement of reasons in relation to the decision or matter.
                         decision for the matter, including an enforcement notice, is
                                                                                              (4) In this section –
                         given to the person.
                                                                                                  decision includes-
               Note –
                   See the P&E Court Act for the court’s power to extend the appeal               (a) conduct engaged in for the purpose of making a decision; and
                   period.                                                                        (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard                   (c) the making of a decision or failure to make a decision; and
                   in the appeal.
                                                                                                  (d) a purported decision; and
               (5) If an appeal is only about a referral agency’s response, the
                   assessment manager may apply to the tribunal or P&E Court to                   (e) a deemed refusal.
                   withdraw from the appeal.                                                      non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an                  matter-
                   infrastructure charges notice must not be about-                               (a) is final and conclusive; and
                   (a) the adopted charge itself; or                                              (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-                                      set aside or called into question in any other way under the
                                                                                                      Judicial Review Act 1991 or otherwise, whether by the
                         (i)   the establishment cost of trunk infrastructure identified in           Supreme Court, another court, a tribunal or another entity; and
                               a LGIP; or
                                                                                                  (c) is not subject to any declaratory, injunctive or other order of
                         (ii) the cost of infrastructure decided using the method                     the Supreme Court, another court, a tribunal or another entity
                              included in the local government’s charges resolution.                  on any ground.
               230 Notice of appeal                                                           232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the        (1) A person who is appealing to the P&E Court must comply with the
                   tribunal or P&E Court, a notice of appeal that-                                rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                                                                                              (2) However, the P&E Court may hear and decide an appeal even if
                   (b) succinctly states the grounds of the appeal.                               the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 15 of 15
Document Set ID: 24552191
Version: 4, Version Date: 23/02/2026

Used in these records

About this file

File size
195 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Other Change Decision Notice - Council Meeting Decision MCU18 0102.03 (As Published).pdf · 195 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.