Sealed Judgment (6 Arakoon) - 26.05.26
Nature and Extent of Approved Use
4. This approval is for a Dwelling house.
Building Height
5. The maximum height of the development must not exceed 8.0 metres above the natural and
finished ground level. Including where excavation is undertaken the exposed portion of the
external façade of the building.
6. Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which
certifies that the building does not exceed the maximum height requirement of this Decision
Notice.
External Colours & Finishes
7. All air conditioning units or other mechanical equipment must be fully enclosed or screened
such that they are not visible from the street frontages nor adjoining properties.
8. Waste storage areas, clothes drying areas and external storage areas must be screened
from view of the street.
Fencing and Walls
9. Any street fencing or structures must not exceed 2.0 metres in height above ground level.
ENGINEERING
Site Access and Driveways
10. A sealed access driveway must be provided from Arakoon Crescent to all parking and
manoeuvring areas of the development. The works must be generally in accordance with the
approved plans and undertaken in accordance with an Operational Works approval.
Stormwater Drainage
11. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property. The on-site disposal must be in
accordance with the recommendations of a site specific geotechnical report and endorsed
through a Building Permit.
Easements
12. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
13. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
14. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
15. All works must be carried out in accordance with a site specific Geotechnical Report prepared
by a qualified person* and endorsed through the building permit.
*(Refer to Advisory Note)
16. Certification must be submitted to Council from a qualified person* which certifies that the
development has been constructed in accordance with the recommendations contained in
the site specific Geotechnical Report and that the development has a minimum factor of
safety against landslip of 1.5 in the long term.
*(Refer to advisory Note)
Page 3 of 10
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Sealed Judgment (6 Arakoon) - 26.05.26.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.