Sealed Judgment (6 Arakoon) - 26.05.26
c. Replacement of all existing native trees and vegetation required to be removed to
accommodate driveway infrastructure and building works.
d. Landscape screening that softens the dwellings built form when viewed from Arakoon
Crescent.
e. The area between the dwelling and the eastern boundary being revegetated and
stabilised utilising a range of native coastal tree, shrub and groundcovers.
21. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
Retention of Existing Trees
22. Existing trees on the site and in the road reserve identified for retention must be retained in
accordance with an Arborist Report (or part thereof) prepared by a qualified person* and
endorsed through an Operational Works approval
*(Refer to Advisory Note)
DEMOLITION WORKS
23. Unless specifically conditioned otherwise, all works must comply with the relevant acceptable
solutions as contained in the Waste Management Code and Water Quality and Drainage
Code of the Noosa Plan 2020.
Works
24. Demolition must be undertaken in a manner that causes no detrimental effect upon the
amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions
in accordance with the nuisance provisions of the Environmental Protection Act 1994.
Waste Management
25. Adequate area must be provided on-site for the collection and separate storage of recyclable,
non-recyclable, vegetative and hazardous materials in their specific waste streams during
removal or demolition works.
26. All waste materials must be removed from the site to avoid causing unhealthy conditions,
with the site left clean, tidy and free from any debris.
27. Where a development permit has not been issued for the future use of the site, hard surfaced
areas including concrete slabs must be removed and disturbed areas must be revegetated
in accordance with PSP2 Landscaping of the Noosa Plan 2020. Alternatively, the site must
be turfed within 20 business days of completing the removal or demolition work. Health and
Safety
28. All building materials containing asbestos, including asbestos cement sheeting or roofing and
lagging, are removed from the building prior to demolition or relocation.
29. Removal of building materials containing asbestos must be undertaken by a licensed
asbestos removalist.
30. Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
requires a licensed asbestos removalist to give notice to Workplace Health and Safety
Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
commences. Notification must be made using Form 65: Notification of licensed asbestos
removal work, demolition work or emergency demolition.
Page 5 of 10
7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Sealed Judgment (6 Arakoon) - 26.05.26.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.