Information response

Attached to the e-mail Information Request Response REC16/0014.

of 5

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

4. Please provide a revised SWMP that does not include any significant changes to the landform and
    provides for a secondary flow path. The SWMP should address the following:
    (a) no adverse impacts on drainage conditions on other properties for all events up to and
    including 1% AEP
    (b) demonstrate the existing downstream stormwater system will not be impacted as a result of
    the development for all events up to and including 1% AEP
    (c) the design should be in accordance with QUDM and The Noosa Plan.

Response:
Refer Empire Engineering correspondence in Attachment 1 together with attached amended
Stormwater Management Plan

5. Please provide a stub road reserve to service the property to the west. Council would accept a ‘Y’
    shaped configuration incorporating the sealed stub road and a reinforced crossover as a
    temporary measure until such time as the neighbouring property is developed. The ‘Y’ should be in
    accordance with the relevant design standards.

Response:
The amended Proposal Plan provides for a stub road connection to service the property to the west. It
is noted that the applicant will continue to reside in the existing dwelling to be retained on site. The
original cul-de-sac proposal was a specific applicant intent to limit traffic movements through the site.
To compensate for the loss of the cul-de-sac, the proposal now includes a proposed traffic calming
device (central median). Further details of this can be addressed as part of detailed operational works
design.

6. Plans, including cross sections, are required to show:
    (a) the cut and fill proposed on the site including the amount of imported fill
    (b) the proposed finish levels for the proposed lots and new road and indication of the depth cut
    and fill
    (c) details of any earth retention methods, batters and/or retaining walls.

Response:
Refer attached preliminary Earthworks plan prepared by Empire Engineering.


The Information and Referral Stage of IDAS has now concluded and the application is now in the
Decision Stage.

Should you have any questions with respect to the above, please do not hesitate to contact me direct.

Yours faithfully
PROJECT URBAN




Scott Sobey
DIRECTOR
Email: [email protected]
Log in to download the original file

Information response.pdf · 418 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.