Attached to the e-mail Information Request Response REC16/0014.
4. Please provide a revised SWMP that does not include any significant changes to the landform and
provides for a secondary flow path. The SWMP should address the following:
(a) no adverse impacts on drainage conditions on other properties for all events up to and
including 1% AEP
(b) demonstrate the existing downstream stormwater system will not be impacted as a result of
the development for all events up to and including 1% AEP
(c) the design should be in accordance with QUDM and The Noosa Plan.
Response:
Refer Empire Engineering correspondence in Attachment 1 together with attached amended
Stormwater Management Plan
5. Please provide a stub road reserve to service the property to the west. Council would accept a ‘Y’
shaped configuration incorporating the sealed stub road and a reinforced crossover as a
temporary measure until such time as the neighbouring property is developed. The ‘Y’ should be in
accordance with the relevant design standards.
Response:
The amended Proposal Plan provides for a stub road connection to service the property to the west. It
is noted that the applicant will continue to reside in the existing dwelling to be retained on site. The
original cul-de-sac proposal was a specific applicant intent to limit traffic movements through the site.
To compensate for the loss of the cul-de-sac, the proposal now includes a proposed traffic calming
device (central median). Further details of this can be addressed as part of detailed operational works
design.
6. Plans, including cross sections, are required to show:
(a) the cut and fill proposed on the site including the amount of imported fill
(b) the proposed finish levels for the proposed lots and new road and indication of the depth cut
and fill
(c) details of any earth retention methods, batters and/or retaining walls.
Response:
Refer attached preliminary Earthworks plan prepared by Empire Engineering.
The Information and Referral Stage of IDAS has now concluded and the application is now in the
Decision Stage.
Should you have any questions with respect to the above, please do not hesitate to contact me direct.
Yours faithfully
PROJECT URBAN
Scott Sobey
DIRECTOR
Email: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.