Original source · versioned page text
Information response
Attached to the e-mail Information Request Response REC16/0014.
Our Ref: SC-5551 Your Ref: REC16/0014 18th October 2016 Noosa Council PO Box 141 Tewantin, QLD, 4565 (Attention: Glen Conforti) Dear Glen, RE: REC16/0014 – 28 Elkhorn Dr, Tewantin, RESPONSE TO INFORMATION REQUEST 3. Refer amended SWMP report, in particular: a. The parameters have been adopted from the MUSIC Modelling Guidelines and the Healthy Waterways MUSIC Version 5 recommended parameters for Bio- retention basin nodes, which are as follows: 400mg/kg TN Content 50mg/kg Orthophosphate Content 200mm/hr Saturated Hydraulic Conductivity (amended from 180mm/hr) The most recent Version 6 recommended parameters for Orthophosphate are even less conservative compared to the Version 5 parameters, see link: http://healthywaterways.org/initiatives/waterbydesign/stormwater; However, we have continued with the Version 5 parameters for consistency with the previously submitted SWMP; b. Refer amended SWMP report and above with the MUSIC detailed parameters used; c. Refer amended SWMP report; d. The SWMP is in compliance with the Noosa Plan Water Sensitive Design Code; e. Refer amended SWMP report; f. Refer amended SWMP report; 4. Refer concept bulk earthworks plan. The extent of FILL has been reduced to a small area in the north-west corner of the site. This is required to ensure the road grade has minimum fall out to Elkhorn Drive; a. Refer amended SWMP report; b. Refer amended SWMP report; c. Refer amended SWMP report. 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.