Council archive · source document
SUPERSEDED 2311-37569 SRA - Response with conditions · MCU23/0129
2311-37569 SRA Attachment 3—Reasons for referral agency response (Given under section 56(7) of the Planning Act 2016) The reasons for the SARA’s decision are: The proposed development is for operational work for prescribed tidal works to construct a jetty and landing at 27 Wyuna Drive, Noosaville, Lot 13 on N10576, formally described as Lot 88 on N2184. The jetty and landing is for private use and for one vessel with a maximum wet vessel beam of 2.8 metres. The proposed development involves operational work in a developed tidal waterway, and as such required assessment under the State Development Assessment Provisions (SDAP). SARA assessed the application against State code 7: Maritime safety, of the SDAP (v3.0) and found it complies, subject to conditions to ensure: o the development is carried out generally in accordance with the plans of development submitted with the application o that at all times, all lights on or above the development site do not interfere with safe navigation in surrounding waterways o the development does not encroach on the navigation corridor or high-risk maritime zone to ensure the safe passage of vessels o that debris from the development does not create a hazard to navigation o that there is no residual material that could create a hazard to navigation. SARA assessed the application against State code 8: Coastal development and tidal works, of the SDAP (v3.0) and found it complies, subject to conditions to ensure: o the development is carried out generally in accordance with the plan of development submitted with the application. o that at all times, the works, to which this approval relates are for private purpose only. o any operator and contractor involved in the works ensures impacts on coastal values (water quality) are avoided or minimised. o works only use materials which are free from contaminants as defined under section 11 of the Environmental Protection Act 1994. o damaged works as a result of erosion, flooding or storm tide inundation, the registered landowner(s) of the subject land shall be responsible for the removal of all debris at their own expense. Material used in the assessment of the application: the development application material and submitted plans Planning Act 2016 Planning Regulation 2017 the SDAP (version 3.0), as published by SARA the Development Assessment Rules SARA DA Mapping system section 58 of the Human Rights Act 2019 State Assessment and Referral Agency Page 6 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED 2311-37569 SRA - Response with conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 278 KB (small file)
- File type
No other editions are linked here.