Council archive · source document
Development Application - Part 1 of 2 - IDAS Application Forms 1 & 6, Assessment Checklist 1 & Body Corp Minutes · OPW11/0172
Place barcode here 111111i 16411 61 1 1 1
S0045499
THIS IS THE NEXT PART OF A
MULTIPLE PART RECORD
Part ) Of -^)
Application number:
T V&ASABCS I AM`I NH)RMATION M.ANAGFME.. ('RECORDS MANAGFMF .T Ccrtrol ofRecords\FUR\IS'uMulti
[9cr..^O..S R:....1^^^..
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 18 pages
Page 2
Page 3
I- Integrated Development Assessment System form
Application Details - IDAS form 1
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete this form (Application details - IDAS form 1)
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)
Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.
Name/s (individual or company name in full)
i 5Zt'
X07.5-y 74£43S
1. What is the nature of development proposed? (tick all applicable boxes)
q material change of use of premises
building work
q operational work
Development Counter
q reconfiguring a lot
2 4 MAY 2011 ;.'
Tewan tin
H-•_ • 117 rm i Queensland
^,\ Government
Page 4
n
2. What type of approval is being sought?
development permit
q preliminary approval
q both - provide details below
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
No
q Yes - complete table A and then go to question 5
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premis es
Lot on plan
Street Address
description
Local government area
Unit Street Street name and official Post Plan type (e.g. Logan,Cairns)
Lot No.
No. No. suburb/locality name code and plan no.
JV -5 -6r, e- 1 li'T
1A u Sunshine coast regional
1 AAe i Olt
NtrJ...^sK C) 3ia r council
i{c' 438>
q Street address / lot on plan C /4^'e6
Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
Table - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channe I dredging in Moreton Bay)
Coordinates (note: place each set of
coordinates in a separate row) Zone Local government
Datum
reference area (If applicable)
Easting Northing Latitude Longitude
q GDA94
q WGS84
1
F] other
5. Total area of the premises on which the development is proposed (indicate hectares or m2)
608m2
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)
1 Units (6 /'t TOy^zt^
7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)
Timber jetty
aw,)t !l Details - IDAS form 1
ersion 1.0 18 December 2009
Page 5
8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)
q No
® Yes - complete either table D, table E or table F as applicable
Table D (note: do not complete this table if lodging the application on-line using Smart eDA)
Name of owner/s of the land
I/We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of owner/s of the Ian
Date
Table E
G T=> i (` c c%L
Name of owner/s of the land ^t E^ f4t„^: /I!t .154J)Dek. F5iP^=N'T f ^t4- &Joy
p .%l E ,J.4'-1 co,. 6 c IV, r
q The owner's written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land
By making this application, I, the applicant, declare that the owner has given written consent to the making of
q the application.
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)
® No q Yes - complete table G
10. Identify if any of the following apply to the premises (tick applicable box/es)
adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
on strategic port land under the Transport Infrastructure Act 1994 - complete table I
in a tidal water area - complete table J
Table Name of water body, watercourse or aquifer
1 Noosa Waters
11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)
No q Yes - ensure the type, location and dimension of each easement is included in the plans submitted
plication Details - IDAS form 1
Version 1.0 18 December 2009
Page 6
12. Does the proposal include new building work or operational work on the premises? (including any
services)
q No ® Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted
13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)
® No - Go to question 15 q Yes
15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009? J
No
q Yes - provide details below
16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)
Method of lodgement to
Description of attachment or title of attachment
assessment manager
form 6 over the counter
check list
17. Applicant's declaration
® By making this application, I declare that all information in this application is true and correct (note: it is
unlawful to provide false or misleading information).
Page 7
Notes for completing this form
Question 8:
• Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
• Owners consent is not required for a mobile and temporary ERA.
Question 9:
• Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.
Question 13:
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
long service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
• The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
• Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.qleave.qld.gov. au. For further information contact QLeave on 1800 803 481 or www.gleave gld.gov.au.
Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.
OFFICE USE ONLY
Date received Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
Council. I have been engaged as the private certifier for the
To:
building work referred to in this application.
Date of BSA Certification Building
Name
engagement license number classification/s
Page 8
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
QLeave Project Amount form sighted by Name of officer who
Description of the work Date paid
Number paid ($) assessment sighted the form
manager
1
The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.
Page 9
MEETING OF RESIDENTS SAILS ROYALE, 26 SUNSEEKER CLOSE
NOOSA WATERS
DATE: 12`h January, 2011
TIME: 5.30pm
PRESENT: Don Kenway (U I) (Lorraine approx.6.30pm), Peter & Lyn Marshall (U2),
Merv & Pain Tebbutt (U3), Paul Horton & Marion (U4)(present from 6.00pm), Peter &
Colleen Considine (U5),
APOLOGIES: Len & Geraldine Daddow (U6)
CHAIRMAN: As the Chairman (G. Daddow) was absent the Sec/ Treas. (M. Tebbutt)
chaired the meeting.
BUSINESS
1. SANDBAGS
It was agreed that whilst the weather is under the influence of the El Nina effect a regular
review of the local conditions that is likely to affect our units should be carried out.
Should it be required Merv would act to secure a truckload of sand, 100mtrs of plastic
and sufficient heavy duty plastic bags to ensure all units had sufficient sandbags.
(P. Marshall indicated he would try and secure his own bags)
2. JETTY
It was agreed that modifications to the existing main jetty as discussed previously should
be carried out.
Colleen also requested that maintenance to existing timbers that were rotting should be
carried out at the same time.
It was agreed that we should make every effort to secure 6 boat berths for the complex.
Paul is to discuss all the above with a friend who could carry out the work necessary.
All of the above is of high priority.
The matter of boat rostering was raised. This should be considered in conjunction with
the above.
3.SWIMMING POOL
Merv advised that due to the Queensland Flood situation there is no salt available
anywhere on the East Coast of Australia for at least 2 months. All salt for pools is
manufactured in Gladstone and the factory is flooded out. This means the pool reverts to
a daily dose of chlorine which will increase its operating cost.
As from 1st December 2010 all pools have to comply with new safety regulations. We
have been listed since that date to have the inspector check our pool.
Phil Montague is the Qld Govt. appointed inspector (formerly with the Noosa Council)
surveyed our pool on 12/1/11. His report and quote for any works necessary will be
available to the BCS within a few days.
Development Counter
2 4 MAY 2011
'
T wantln ':11:
Page 10
Page 11
Verbally he indicated 3 areas that needed Perspex attached to the fence to prevent
children climbing the fence and also, the front fence along the driveway did not comply
with the new regulations and would need strengthening.
4.WATER TANK
It was agreed that whilst the current water situation exists the need for a water tank
installation is of low priority.
It was also agreed that the existing quote that was received by Peter Marshall (but now
time expired) should be resurrected when the time is appropriate to enable the complex
to meet its legal requirements.
5. EXISTING PLASTIC BLIND REPLACEMENT OPTIONS
It was agreed that the existing blind setup had passed its usefulness and something had
to be done.(This is a restatement of our attitude from the last 2 AGM's)
It was agreed that the squaring off of the roof as per previous quotes should be pursued
and if possible without vertical poles as support.(ie cantilever) Unit holders did not
want their view of the canal interrupted. We all agreed that the end result should be
uniform in its outlook.
It was also agreed that we wanted to maximize the deck space as best possible.
Merv is to contact Jim Shingles from Coastal Patios (one of the original quotes) to see
if this is possible and get an estimate of cost.
If the above proceeds then each individual unit can decide what is the best option for
them. (ie 13i folds, Stacker doors, Plastic Blinds etc).
The option still remains that if a unit holder does not wish to do anything they don't
have to.
6. BOAT LIFTING DEVICES
Peter Marshall raised the matter of installation of boat lifting devices. The feeling was
mixed so it was decided that the BCS issue a flyer to all units for a vote on the matter.
Should this issue be successful such devices would be at individual unit holder cost.
Mervyn R. Tebbutt
Secretary/ Treasurer
Acting Qhairman
Z/
Page 12
Page 13
Development assessment checklist - IDAS
checklist 1
lstarnable Planning Act 2009, version 10 18 December 2009)
This checklist applies to the carrying out of development generally.
You are not required to complete this checklist as part of your development application, however you may submit the
checklist with your application if you wish. The purpose of the checklist is to assist you in identifying:
• whether you need to make a development application for the proposed development
• if a development application is required, the relevant IDAS forms you need to complete as part of your application
• whether you need to give a copy of your application to any referral agencies.
If your development involves a material change of use, reconfiguring a lot or operational works, it is recommended
that you complete Material change of use - /DRS checklist 2. Reconfiguring a lot - IDAS checklist 3 or Operational
works - IDAS checklist 4. as applicable.
If you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
Department of Infrastructure and Planning's website at www.dip.gld. v.au.
All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Part I - General questions
1.1 Have you received a referral agency response in relation to this proposed development prior to making
an application?
®No
• To assist you in preparing your application, completing Referral agency responses - IDAS checklist
q Yes
6 is recommended
1.2 Do you wish the proposed development to be assessed against a superseded planning scheme?
No
You must complete Request to apply a superseded planning scheme - Sustainable Planning Act
q Yes form 2 and give this notice to the relevant local government. If the local government agrees to
your request, details must be provided in Application details - IDAS form I
1.3 Does the proposal involve removing quarry material from a watercourse or lake for which an allocation
notice is required under the Water Act 2000?
ZNo
Yes It is recommended that you complete part 2 of this checklist
1.4 Is any part of the proposed development intended to be carried out on a Queensland heritage place under
the Queensland Heritage Act 1992?
No
Yes I. It is recommended that you complete part 3 of this checklist
Page 14
1.5 Does the proposal involve development on a local heritage place?
No
Yes It is recommended that you complete part 4 of this checklist
1.6 Does the proposal involve an environmentally relevant activity, other than an agricultural ERA, a mining
activity or a chapter 5A activity?
No
q Yes It is recommended that you complete part 5 of this checklist
1.7 Is any part of the development on strategic port land or airport land (other than development for a
material change of use that is inconsistent with the land use plan for the strategic port land or airport land)
No
q Yes It is recommended that you complete part 6 of this checklist
1.8 Is any part of the development on land below a high water mark within the limits of a port under the
Transport Infrastructure Act 1994?
No
q Yes It is recommended that you complete part 7 of this checklist
1.9 Is any part of the premises designated for community infrastructure?
ZNo
q Yes It is recommended that you complete part 8 of this checklist
1.10 Does the proposal involve the establishment or expansion of a waste water disposal system?
®No
q Yes It is recommended that you complete part 9 of this checklist
1.11 Is the development on land that adjoins a declared fish habitat area under the Fisheries Act 1994?
No
q Yes It is recommended that you complete part 10 of this checklist
Privacy - please refer to your assessment manager for further details on the use of information recorded in
this checklist.
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this
checklist and provided as part of this process will be of assistance to you, it is provided on the basis that you will
not rely on the information without first making your own enquiries regarding the interpretation and application of
the applicable legislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
other consequence which may arise from your reliance on this process and the information contained on this
checklist.
ent application assessmt-: IDAS checklist 1
Version 1.0 18 December 2`009
Page 15
OFFICE USE ONLY
Date received Reference numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.
?nt checklist - IDAS checklist t
Version 1.0 18 December 2009
Page 16
Building or operational work assessable
against a planning scheme - IDAS form 6
i `_<crs'.au^abfe Planning Ac: 3;09 version 10 effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against
a planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete Applicant details - IDAS form 1
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.
1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)
® building work - complete table A [ operational work - complete table B
Table A
Nhat is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering.
inderpinning, moving or demolishing a building)?
jetty
What type of approval is being sought? (if you have indicated multiple works in the above question, please generate
another Table A to detail each approval request)
® development permit 0 preliminary approval
Are there any current approvals associated with this application? (e.g. material change of use)
Z No []Yes - provide details below
2. What is the dollar value of the proposed building work? (inc GST, materials and labour)I $ 18,500
Page 17
3. Confirm the following mandatory supporting information accompanies this application
Confirmation
Method of lodgement
of lodgement
All applications for operational works
site plans drawn to scale which show the following:
• the location and site area of the land to which the application relates
(relevant land)
• the north point
• the boundaries of the relevant land
• the allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves. q confirmed over the counter
building envelopes and existing or proposed open space (note:
numbering is required for all lots)
• any existing or proposed easements on the relevant land and their
function
• any access limitation strips
• all existing and proposed roads and access points on the relevant land
a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents q confirmed over the counter
relevant to the application
Applications for operational works involving earthworks (filling and excavating)
drawings showing:
• existing and proposed contours
• areas to be cut and filled
• the location and level of any permanent survey marks or reference
stations used as datum for the works q confirmed electronic
• the location of any proposed retaining walls on the relevant land and
their height
• the defined flood level (if applicable)
• the defined fill level (if applicable)
Applications for operational works involving roadworks
drawings showing:
• existing and proposed contours
• the centreline or construction line showing chainages, bearings, offsets
if the construction line is not the centreline of the road and all
intersection points
• information for each curve including tangent point chainages and
offsets, curve radii, arc length, tangent length, superelevation (if
applicable) and curve widening (if applicable)
• kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
• edge of pavement where kerb is not constructed q confirmed
• position and extent of channelisation
• location and details of all traffic signs, guideposts, guardrail and other
street furniture
• pavement markings including details on raised pavement markers
• catchpit, manhole and pipeline locations
• drainage details (if applicable)
• cross road drainage culverts (if applicable)
• concrete footpaths and cycle paths
• location and details for access points, ramps and invert crossings
• changes in surfacing material
ational work assessable against a p!a rrtn scheme - IDAS form 6
Version 1.0 18 December 2009
Page 18
Confirmation
Method of lodgement
of lodgement
Applications for operational works involving stormwater drainage
drawings showing:
• existing and proposed contours
• drainage locations, diameters and class of pipe, open drains and
easements
• manhole location, chainage and offset or co-ordinates and inlet and
O confirmed
outlet invert levels
• inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels
Applications for operational works involving water reticulation
drawings showing:
• kerb lines or edge of pavement where kerb is not constructed
• location and levels of other utility services where affected by water
reticulation works
• pipe diameter, type of pipe and pipe alignment
• water main alignments
O confirmed
• water supply pump station details (if applicable)
• minor reservoir details (if applicable)
• conduits
• location of valves and fire hydrants
• location of house connections (if applicable)
• location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation
drawings showing:
• location of all existing and proposed services
• location of all existing and proposed sewer fines and manhole locations
location of all house connection branches
• kerb lines or edge of pavement where kerb is not constructed
• chainages
Oconfirmed
• design sewer invert levels
• design top of manhole levels
• type of manhole and manhole cover
• pipe diameter, type of pipe and pipe alignment
• location of house connections (if applicable)
• sewer pump station details (if applicable)
Applications for operational works involving street lighting
drawings showing:
• location of all light poles and service conduits
• location of all other cross road conduits
• type of wattage and lighting
confirmed
• any traffic calming devices
• additional plans for roundabouts and major roads (if applicable)
• details of any variations to normal alignment
• details of lighting levels
a,% rrq schernt, - fD:4S form 6
/ersion 1.0 18 December 2009
Page 19
Confirmation
Method of lodgement
of lodgement I
Applications for operational works involving public utility services
drawings showing:
• any existing light poles and power poles
• any existing underground services q confirmed
• details of proposed services
• alternation to existing services
Applications for operational works involving landscaping works
drawings showing:
• the location of proposed plant species
• a plant schedule indicating common and botanical names, pot sizes
and numbers of plants
• planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and r-1coni rmed
garden edge
• the location and type of any existing trees to be retained
• construction details of planter boxes, retaining walls and fences
• the proposed maintenance period
• irrigation system details
Notes for completing this form:
• This form can also be used for development applications for building works or operational works assessable
against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
mentioned, take it to mean the land use plan for the airport Ian d.
Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.
OFFICE USE ONLY
Date Received Reference Numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.
olann; << 7 r. - IDAS form 6
Version 1.0 18 December2009
Used in these records
Development Application - Part 1 of 2 - IDAS Application Forms 1 & 6, Assessment Checklist 1 & Body Corp MinutesRelated documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.