Skip to the record
Beware of cheap imitations.

Council archive · source document

Development Application - Part 1 of 2 - IDAS Application Forms 1 & 6, Assessment Checklist 1 & Body Corp Minutes · OPW11/0172

of 19

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

     Verbally he indicated 3 areas that needed Perspex attached to the fence to prevent
     children climbing the fence and also, the front fence along the driveway did not comply
     with the new regulations and would need strengthening.




      4.WATER TANK

      It was agreed that whilst the current water situation exists the need for a water tank
      installation is of low priority.
      It was also agreed that the existing quote that was received by Peter Marshall (but now
      time expired) should be resurrected when the time is appropriate to enable the complex
      to meet its legal requirements.

      5. EXISTING PLASTIC BLIND REPLACEMENT OPTIONS

      It was agreed that the existing blind setup had passed its usefulness and something had
      to be done.(This is a restatement of our attitude from the last 2 AGM's)
      It was agreed that the squaring off of the roof as per previous quotes should be pursued
      and if possible without vertical poles as support.(ie cantilever) Unit holders did not
      want their view of the canal interrupted. We all agreed that the end result should be
      uniform in its outlook.
      It was also agreed that we wanted to maximize the deck space as best possible.
      Merv is to contact Jim Shingles from Coastal Patios (one of the original quotes) to see
      if this is possible and get an estimate of cost.
      If the above proceeds then each individual unit can decide what is the best option for
      them. (ie 13i folds, Stacker doors, Plastic Blinds etc).
      The option still remains that if a unit holder does not wish to do anything they don't
      have to.

      6. BOAT LIFTING DEVICES

      Peter Marshall raised the matter of installation of boat lifting devices. The feeling was
      mixed so it was decided that the BCS issue a flyer to all units for a vote on the matter.
      Should this issue be successful such devices would be at individual unit holder cost.

      Mervyn R. Tebbutt
      Secretary/ Treasurer
      Acting Qhairman



Z/

Used in these records

About this file

File size
2.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 1 of 2 - IDAS Application Forms 1 & 6, Assessment Checklist 1 & Body Corp Minutes.pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.