Council archive · source document
Development Application - Part 1 of 2 - IDAS Application Forms 1 & 6, Assessment Checklist 1 & Body Corp Minutes · OPW11/0172
Confirmation
Method of lodgement
of lodgement
Applications for operational works involving stormwater drainage
drawings showing:
• existing and proposed contours
• drainage locations, diameters and class of pipe, open drains and
easements
• manhole location, chainage and offset or co-ordinates and inlet and
O confirmed
outlet invert levels
• inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels
Applications for operational works involving water reticulation
drawings showing:
• kerb lines or edge of pavement where kerb is not constructed
• location and levels of other utility services where affected by water
reticulation works
• pipe diameter, type of pipe and pipe alignment
• water main alignments
O confirmed
• water supply pump station details (if applicable)
• minor reservoir details (if applicable)
• conduits
• location of valves and fire hydrants
• location of house connections (if applicable)
• location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation
drawings showing:
• location of all existing and proposed services
• location of all existing and proposed sewer fines and manhole locations
location of all house connection branches
• kerb lines or edge of pavement where kerb is not constructed
• chainages
Oconfirmed
• design sewer invert levels
• design top of manhole levels
• type of manhole and manhole cover
• pipe diameter, type of pipe and pipe alignment
• location of house connections (if applicable)
• sewer pump station details (if applicable)
Applications for operational works involving street lighting
drawings showing:
• location of all light poles and service conduits
• location of all other cross road conduits
• type of wattage and lighting
confirmed
• any traffic calming devices
• additional plans for roundabouts and major roads (if applicable)
• details of any variations to normal alignment
• details of lighting levels
a,% rrq schernt, - fD:4S form 6
/ersion 1.0 18 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application - Part 1 of 2 - IDAS Application Forms 1 & 6, Assessment Checklist 1 & Body Corp MinutesRelated documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.