Council archive · source document
Development Application - Part 1 of 2 - IDAS Application Forms 1 & 6, Assessment Checklist 1 & Body Corp Minutes · OPW11/0172
MEETING OF RESIDENTS SAILS ROYALE, 26 SUNSEEKER CLOSE NOOSA WATERS DATE: 12`h January, 2011 TIME: 5.30pm PRESENT: Don Kenway (U I) (Lorraine approx.6.30pm), Peter & Lyn Marshall (U2), Merv & Pain Tebbutt (U3), Paul Horton & Marion (U4)(present from 6.00pm), Peter & Colleen Considine (U5), APOLOGIES: Len & Geraldine Daddow (U6) CHAIRMAN: As the Chairman (G. Daddow) was absent the Sec/ Treas. (M. Tebbutt) chaired the meeting. BUSINESS 1. SANDBAGS It was agreed that whilst the weather is under the influence of the El Nina effect a regular review of the local conditions that is likely to affect our units should be carried out. Should it be required Merv would act to secure a truckload of sand, 100mtrs of plastic and sufficient heavy duty plastic bags to ensure all units had sufficient sandbags. (P. Marshall indicated he would try and secure his own bags) 2. JETTY It was agreed that modifications to the existing main jetty as discussed previously should be carried out. Colleen also requested that maintenance to existing timbers that were rotting should be carried out at the same time. It was agreed that we should make every effort to secure 6 boat berths for the complex. Paul is to discuss all the above with a friend who could carry out the work necessary. All of the above is of high priority. The matter of boat rostering was raised. This should be considered in conjunction with the above. 3.SWIMMING POOL Merv advised that due to the Queensland Flood situation there is no salt available anywhere on the East Coast of Australia for at least 2 months. All salt for pools is manufactured in Gladstone and the factory is flooded out. This means the pool reverts to a daily dose of chlorine which will increase its operating cost. As from 1st December 2010 all pools have to comply with new safety regulations. We have been listed since that date to have the inspector check our pool. Phil Montague is the Qld Govt. appointed inspector (formerly with the Noosa Council) surveyed our pool on 12/1/11. His report and quote for any works necessary will be available to the BCS within a few days. Development Counter 2 4 MAY 2011 ' T wantln ':11:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application - Part 1 of 2 - IDAS Application Forms 1 & 6, Assessment Checklist 1 & Body Corp MinutesRelated documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.