b. Powershare (Powervolt) By March 2026 (if ARENA Ewan Theme 3: Clean low
A concept being funded) emissions industries
developed for potential 3.1& 3.2
funding from the ARENA Did not go head.
Solar Scale Up Theme 7: Resilient &
Not Funded
Competition to bring the adaptive communities
cost of large scale solar to &
less than 30c/watt built environments
installed, with a potential 7.1 & 7.2
site in Noosa.
Collaborative and
connected business
Ecosystems are
created
Relevant and
impactful
support provided to
our businesses
4. Ensure battery a.Community Batteries: Noosa Comm Battery Anne & Colin & ZEN E Theme 2: Energy
initiatives i.Noosa Community installed by 30 Jun 2025. Working Group members efficiency and
are delivered within Battery renewable energy
agreed timeframes a. Assist with community By 30 May, 2024 Anne/Colin 1.2 & 1.3
Community Batteries consultation in park In progress but delayed
due to lengthy
negotiations with Energex Anne/Colin Theme 3: Clean low
emissions industries
b.Advocacy for 100 – 200 Ongoing advocacy to 3.1 & 3.2.
community batteries in Energy Qld. through LREZ
Noosa LGA consultation for more Theme 7: Resilient &
community adaptive communities
batteries/community energy & built environments
resources. Done & Ongoing 7.1 & 7.2
By 30 September, 2024 Infrastructure
Done accelerates