Council archive · source document
09/1024 - MCU - Detached House [As Published] · 132009.1024
IDAS Assessment Checklist, Version 22
INTEGRATED PLANNING ACT 1997
S ECT 10 N 1 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.
HERIT.
‘AGE
1.1A |is
y part of the proposal intended to be carried out on a Queensland heritage place under the Queensland Heritage Act 1992?
No-Gotoai18 (J Yes
if yes, has an exemption certificate for the proposal'.! been issued under the Queensland Heritage Act 1992?
CL Yes (No
If no, is the proposed work liturgical development under Queensland Heritage Act 1992, section 78?
(1 Yes CiNo
If no, is the work being carried out by the State?
CJ Yes (I No - (Complete Form 1, Part C1) This application requires assessment by the Environmental Protection Agency (EPA),
Jf EPA is not the Assessment Manager for the application, the EPA has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 5, dem 2: IP Regulation, schedule 2, table 2, tem 18
1.1B
Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of the
Quegnsiand Heritage Act 1992, other than if place is on Cairns or Mackay airport land?
No. Goto 01.2 0 Yes
If yes, does the following apply?
(i) development for public housing, as defined by the Integrated Planning Act 1997 (IPA), chapter 5, [No (] Yes
part 6
(ii) development carried out by the state on land designated for community infrastructure under the (No (1 Yes
IPA, chapter 2, part 6
(iii) development that is exempt from assessment against a planning scheme under the IPA, schedule []No [] Yes
If no to all of (i) - (ii) above - (Complete Form 1, Part C2) This application requires assessment by the relevant focal government as Concurrence
Agency.
JPA, schedule 8, part 1, table 5, tem 2A, IP Reguiation, schedule 1, part 2. table 5, item 2; Ripon Asses (Resincuing and De posai) Act 2008. s 54.
REMOVING. QUARRY: MATERIAL; WILD RIVER AREA:
1.2
ni the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
No-Gotoa13 [1] Yes
If yes, is an allocation notice required under the Water Act 2000?
(J No (Yes
If yes, is any part of the removal of quarry material intended to be located in a declared wild river area under the Wild
Rivers Act 2005?
oO No — (Complete Form 1, Part K;) This application requires assessment by the Department of Natural Resources and Water (NRW). if NRWis not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
oO YES - Unless the application is consistent with any property development pian applying to the land, the Assessment Manager must refuse to receive it.
{Complete Form 1, Part K;). if NRWis not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
Subject to the declaration for the relevant wild river area, assessment is also required for the purposes of the Wild Rivers Act 2005.
IPA, schedule 8, part 1, table 5, tem 1; IP Reguiation, schedule 2, table 2, item 11; IP Regulation, schedule 1, table 5, item 2 (wild river area); Water Act 2000. section 966C; Wild Rivers Act
2005, section 434,
won
this IDAS Assessment Checklist, the term proposal refers to the proposed use, work or lot reconfiguration the subject of the application.
Page 2
u
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1024 - MCU - Detached House [As Published]Related documentApplication case desk ↗