Original source · versioned page text
MCU15/0034 Representations to Decision Notice
Aurecon Australasia Pty Ltd T +61 7 3173 8000 ABN 54 005 139 873 F +61 7 3173 8001 32 Turbot Street E [email protected] (Locked Bag 331 Brisbane QLD W aurecongroup.com 4001) Brisbane Queensland 4000 Australia 21 August 2015 Chief Executive Officer Noosa Council PO Box 141 TEWANTIN, QLD, 4565 Dear Jack, Re: Request to Negotiate Decision Notice Council Reference: MCU15/0034 Development Application: MCU – ‘Service & Utility Type 3 Tower’ Location: 249 Schreibers Road, Cooran QLD 4569 (Lot 12 on RP883248) I refer to the Decision Notice regarding the abovementioned development application dated 31 July 2015 In accordance with Section 361 of the Sustainable Planning Act 2009, NBN Co wishes to make a representation regarding the following conditions: Building Height 5. Certification must be submitted to Council from a Licensed Surveyor which certifies that the monopole structure does not exceed the maximum height requirement of this Decision Notice. A Form 16 can be provided from the Civil ASP once the site has been built. The Form 16 gives certification from a registered engineer confirming that the site has been built as per the For Construction Proposal Plans, which will include the maximum overall height of the monopole. Therefore, a separate certification from a suitably qualified surveyor is not considered necessary. This has previously been accepted by Council for other NBN Sites in the Noosa Shire Council such as: • Doonan West (MCU13/0046) • Tinbeerwah West (MCU13/0049) • Pomona South (MCU13/0068) • Boreen Point (MCU13/0053) • Boreen Point North (MCU13/0052) • Kin Kin (MCU13/0062) Therefore, for the above reasons we respectively request Condition 5 is amended to read: 5. Certification must be submitted to Council with a Form 16 which certifies that the monopole structure does not exceed the maximum height required of this Decision Notice. Health and Safety 8. Warning information signs and security fencing must be provided on the site to prevent unauthorised entry. Fencing must be camouflaged through the use of colours, materials and screening vegetation to blend the fence into the visual landscape. Given the existing mature vegetation surrounding the site to the south and east, in conjunction with additional landscaping along the north western boundary of the compound and the setback from neighbouring homes and surrounding roads, considerable screening of the fencing will be provided. NBN Co does not consider further camouflage of the fencing of the compound through the use of colours and materials is required in this instance.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.