07/0965 - MCU - Detached House [As Published] · 132007.965
ow eo“ Page 1 of 1 Trish Sweeney oe . From: _ tan Mitchell ([email protected]] Sent: Friday, 1 June 2007 7:35 AM To: Trish Sweeney Ce: ‘John Braddock’ Subject: FW: Part N: Application for house at 51 Wavecrest Dr. Attention: Scienta Scienta, Thank you for your call to John Braddock to follow up on this. application. We understood out Building Certifier had this in hand but attached is the IDAS Form Part N completed to the best of my ability. Item 5 does not seem to apply or perhaps: this information resides with Council. Please contact me if you need further information regards IAN MITCHELL FRAIA ARCHITECT: MITCHELLDESIGN “T 07 3378 5185 F 07 3378 5181 M 0407 512 807 . e [email protected] * Disclaimer The contents of this electronic message and any attachments are intended only for the addressee and may contain privileged or confidential information. They may only be.used for the purposes for which they were supplied. If you are not the addressee, you are notified that any transmission, distribution, downloading, printing or photocopying of the contents of this message or attachments is strictly prohibited. The privilege of confidentiality attached to this message and attachments is not waived, lost or destroyed by reason of mistaken delivery to you. If you receive this message In error please notify the sender by return e-mail or telephone. Please consider the environment before you print this e-mail or any attachments. 4/06/2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 44 pages
Page 2
(INTEGRATED PLANNING ACT 1997 . Part N, Version 1.0, 4 October 2004
Form 1 Development Application
Contaminated land
Completion of all questions on Part N is mandatory for all applications involving assessment against the Environmental Protection Act 1994 when
development is proposed on contaminated or potentially contaminated land’
For further information refer to Guide 5 Contaminated land matters available free from www.ipa.ald: gov, au or-the Environmental Protection Agency S
(EPA's) information sheets available free from www.epa.ald.gov.au under Ecoaccess/ business and industry. Alternatively, contact the local government.
Nature of the application’ 1. This application is for: (Tick one (1) or both if applicable) & aye mp oe, 4
Roe eae et ad id oa rs «> Aspectofdevelopment » > * s-Typeofapprovalbeingsort ” |,
for advice regarding development that is ‘ : 7
exempt from this assessable development Dt Material change of use «~ [2] Preliminary approval... |X] Development permit:
trigger. we - — - =
: ' E] Reconfiguring alot “6 Preliminary approval J) Development permit
2. Does this application require assessment against a planning scheme?
NO (71 YES - compiete other relevant parts of the IDAS Application Form 1
The subject land 3.__ Has an Environmental Management Register (EMR) and/or Contaminated.Land Register (CLR)
+} ~” search been conducted for the land the subject of the application?
{K] NO (YES - attach resutts of the search and complete Q4
4. - All or part of the land the subject of the application is:
Oi). on the EMR or the CLR under the Environmental Protection Act 1994;
(1 (ii) used for, or if the land is vacant, ‘was last used for-
C1 (a) anotifiable activity ;
( (b) - an industrial activity and the proposed: use is for a child-care centre,
educational, recreational or residential purpose (including @ caretaker residence on
industrial land), ”
O (iii)_ in an area for which an area management advice has been given for natural
mineralisation or industrial activity.and the proposed use is for child care, educational,
"_fecreational or residential purpose (including @ caretaker residence on industrial tand);
too -&X] (iv) in an area for which an area management advice has been given for unexploded
/ / + ordnance. . we thes
Plans and documents. » ¢ = 5. . Confirm, by ticking the applicable box(es), that the following details are re provided in plans and
For further information about preparinga = written information supporting this application:
proposal report. teler to Guide 7 Preparing |: — “[) (i) ~ plang showing where any Notifiable Activity, Hazardous Contaminant, or potentially
contaminated activity / activities have occurred on site;
Ci (ii) _ ifthe application involves a material change of use from an industrial use to a more
sensitive use (eg. child care, educational, recreational or residential purposes), Supply a detailed
site history outlining previous potentially contaminated uses on the site
PLEASE NOTE .
PART N of Form 1 cannot be accepted by the assessment manger unless accompanied by PART A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager)
DATE RECEIVED
REFERENCE
NUMBER/S
Page 3
a NOOK e we Checklist - Applications Involving Land
& Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
4.4 Form4PartA —
ne
1.1.1 Ensure that the form is fully completed. Vv of x pirate
1.1.2 Inthe case of an MCU or Op Works below the high-water mark, owners consent is requis brad’ ve
‘ 1.1.2.1 If there are multiple owners, the consent of each owner is required. “Veate eu
1.1.2.2 if the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form1 Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.
1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed.
3 2 Se REFER : ye
“ Ensure ‘her items 4-23 hi -23 have been checked and/or completed with regard tc to referrals.
See ENVIRONMENTALLY RECEVANIZAC ES ga en ae
3.1. Ensure that Part G is completed if EPA referral is required.
ad
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
RC EQUESTHI OC HANGEFAPPROVAL : ear
4. { Ensure that items 1-28 have been checked and/or completed including information regarding ‘|
applicant details and owners consent.
ES Se Ae g Se SE
Ensure that at least 6 sets of the Plan of Development (5 for 1 Reconfiguration and Operational t ace nen
Works) accompanies the application. In addition ensure that each set is complete. t wn we
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is v Top plard
unbound. In fepory.
Ensure that at least 6 copies 5 of a any repori accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.
6.2 _ In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. .
a i Cee Se es ea
7.4 Ensure that the application fee, as determined from the Council’s adopted scale of fees,
accompanies the application or has been paid.
7.2. Ensure that the fee which has been paid is recorded on the application form.
Receiving Officer
Having completed this form and accepted the application, please deliver both to the following IDAS Application Receiving
trays:-
* Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.
* Ifthe application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section.
* Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.
« inall other circumstances — AOP1's desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEP! g:\ant\forms\application checklist.doc
Page 4
8
INTEGRATED PLANNING ACT 1997
Part A, Version 2.4, 29 May 2006
- The completion of all appficabfe questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if °
Tequired, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qld.gov.au.
_ Any Information requested | in the form may be — inan attachment to the application. For further information about completing the following details, refer to Guide 1,
Description of land * ae
Allland the subject of the application, mustbe .* 7"
identified. However, a description of the land isnot
frequired in relation to a mabite or temporary” | “+
Environmentally Relevant Activity {ERA). .
Advice for completing Q2-Q2 eppiiesif - | ™.
development is proposed within a water body or.
watécourse. ~
Advice for completing Q- Most land ¢ canbe. :
Identified by a lot on plan description. These details
can be ebtained from title documents or through the
‘Iocal government.
However, if the land on which the development i is
proposed does not have alot on plan description fie,
the development Is proposed in a water body or
‘ watercourse) provide ~-
() the fot on plan description for the *
adjoiningfadjacent land; of y= x
(ii) GPS coordinates where there is no .
adjoining/adjacerit land (eg. in Moreton Bay).
‘Advice for compteting Q7 - Q7 does ‘not apply if the
‘development is “nn a water body or watercourse. . .
@ fe 8-8 applies if = 5
development is uf a local goverment area. «
Noto: Aroas below high water mark are ‘fot within @
focal government's area unless provided for under the
_ Local Government Act 1993.
Advice for completin 19.9 = 09 applies it -
development is on strategic port land or a strategic
port land tidal area. For more detaits refer to Guide 11
3
Street address: fnctiding house numbér, street nanie, suburb/ocality namé & postcode) (if applicable) ~ . :
* of 51 WAVECREST DRIVE CASTAWAYS BEACH QLD 4567 ]
42,
Natne of water body or watercourse, within which the development is proposed: (applicable) —
-|° "| NOT APPLICABLE
3:> Loton plan description (eg. Lot 123 on RP 4567)! GPS coordinates: ’ . ;
* “| LOT 122 ON MCH 807481 ORIGINAL LOT 65 PARISH OF WEYBA
.” | COUNTY OF MARCH
4... ‘The above description is for: (tick epplicable box) .
Ba (iy the land on which’ the development is proposed; or
~ EA di- the land adjoining the water Body or watercourse, within which the development is
- -_ proposed; or. . - .
Ol (ii) the’ water body or watercourse. mT ne
~ Shop tenancy number: 6. “Storey Hevel: - . °7.° Total area of land: (im? or ha):
i bo |, > [eeasam
8. ‘Local government area in which the land i is situated: (eo. Esk Hervey Bay, Woocoo etc.) {if applicable)
“ [NOOSA i
Port authority for the strategic port land or strategic port land tidal area on which the
development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
[ NWA
Proposal details « ee eke t
if there is insufficient room available, detalls may ba
provided in an attachment to the application, _
10. ‘Existing use Of the land: (eg. vacant, single house, shop etc.)
[ SINGLE HOUSE I.
11. Proposed use of the tand: (eg. 6 unit apartment building, 30 fot residential subdivision, ERA for equacutture in
“ponds with a total area of 7 ha for which wastes are. released into waters etc).
oot * [SINGLE HOUSE |
Other applicable parts.of Forth 1 12. ‘Other parts of Form 1 completed as part of this application: (eg. Part D, Part'T; etc)
Part A must always be accompanied by other : | PART D :
completed parts of Form 1. For information about
when a part of Form 1 may apply refer to Guide 1, wot 2 : . . . :
Applicantdetaiis” = °°" 13, Applicant's name: ‘ 15. Contactperson: _ : .
Gearty identity who is making the application. The . :
penile: pe mre lrerare [ JOHN BRADDOCK Io
When signing and fodging this apolieation 14, Contactnumber:- . 16. Facsimile number/e-mail address:
inarmaton roid cones. Te ssccoent | 0418 738 823 | [ [email protected] |
Manager, any referral agency & the Chief Executive ‘ : .
(where applicable} wilt rely on this information when | 17. Postal address:
assessing and deciding the application.
ithe sbplicant 1s & eommaiy conti person | 22 BARTER AVE. HOLLAND PARK QLD 4121 | .
mustbe shown, 18, Signature: . 19._Date: .
LLOQ Cem) 3
VS
Page 5
INTEGRATED PLANNING ACT 1997
Land owner's consent {if applicable}
Section 3.2.1(3) of the IPA prescribes that an
application must contain, or be supported by, the
written consent of the land owner/s, if the application
involves: :
(i) amateriai change of use;
(ii) reconfiguration of alot, .
(il) work on land below high-water mark & not within a
canal as defined under the Coastal Protection and
Management Act 1995,0r
{iv} work on rail corridor land defined under the
Transport infrastructure Act 1994.
Section 3.8.1(2){2) of the IPA provides that
landowner's consent is pt equired fora monies or
temporary ERA.
For more information refer to Guide 1.
20. Land owner's consent to the making of this application:
Part A, Version 2.4, 29 May 2006
Name Signature Date
(i) JOHN BRADDOCK MAR 2007
re voceeceeeeteceeeseeseseecncecstenedeceee No NENG cece en reenern ed
ty St”t~<—s~S
wee
Tene
Resource entitlement (if applicable) .
_ Section 3.2, 45) of the (PA requires evidence. Of. +
“resource erititlemant be | given for applications that :
“involve a prescribed ‘State resource.”"” ~
» Section 3.2. A(v0yCaNCi i) of the IPA prescribes ‘that an
application cannot be taken to be properly made
+ without evidence of the resource entitiément.-
‘Advice for completing Q218 22" i ”
Refer to schedule 40 of tha tntograted F Planning
Regulation 1998 that prescribes the nature of evidence
required by the State in support of the lodging of this
development application :
completing 2
“DAW .of the ail
. 023":
a ) the chief executive of the department administering the resource is satisfied the: oy
. m1. Does thiis application involve a State Tesource prescribed under a regulation (other than invoving, .
- 3, qualty. material on State coastal land under the Coastal Protection and | Management Aa, 1 1995)?
“RENO gotog24"= . >
22. This application i is accompanied bye evidence: (lok applicable box)
ion of, or entitlement to, the. Tesource - atiach evidence and go to o2aiy)
: CU (ii) the chief executive of the department administering the resource is satisfied the a
development is consistent with an. allocation of, or entitlement to, the TASOUTCE ~ go .,
‘ development application may piecsed ‘inthe absence ola an alldcation of, or
, entitlement to, the resource ~ = go to Q23 °
Adu D | : is 23." " Evidence of the resouitoe ‘entitlement: :
2 The information in (v) is. mandatory evidence . :
requised under Q22 (i) or (il) above, = | + (i) Resource entitlement / authority details (vi) ofl stamp of the departnent .
“The official stamp of the Department of Natural ce _ administering the resource (if
Resources,’Mines and Water is mandatory whére the | "ey — —— — ad applicable) ww ~
application involves any water of riverine quarry ) Name of delegated officer ‘- Tasy ore ‘
_ Material under the Water Act 2000, | .
‘Seton 3.2.1(5A) ‘allows re to ‘at . - J .
the time the evidence may be used. (vi) must ” {ili) iti . : | £
cre at Peotlere sinetnied __ (iil), Position of — Officer. i ,
. vee she . vit. | 1 4
: “ (iv) , Signature of delegated officer. ... :
. ~(v) Date -- . :
: “+ “(vi) , Expiry date of evidence (ifapplicabiey . ae
: wees de Lo : Le ‘
"pasebsment triggers *- _ * 7° 124." Is'the IDAS Assessment Checklist completed and attached to this applcaton? Fe ys
This check oes at pe ithe sntatn ses pay YES: 7 , Ae NO - the assessment manager may, refuse to accept this application on the
must be completed forall other applications. fo ye la an on a . _ grounds that the application has not been properly made *
Plans / drawings /reports ~~ ~ 2. Plans/drawingsireports accompanying this application: *
‘An application should be sccompanied by details to *
support the proposal & enable the assessment .
manager, referral agencies ‘and-any person viewing”
the application during public scrutiny or public
* notification to understand the scope of the Proposal |
and any potential impact. :
REPORT 26041
Plan / Drawing / Report Number Title Date
2604 A 1.01 SITE PLAN SEP 06
2604 A 1.02 | SITE SECTIONS SEP 06
DA REPORT
PLEASE NOTE: The assessment manager may refuse to accept an application thal, at the time of ladgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.
OFFICE USE ONLY (applicable fo assessment manager's)
[reE@ S76. 00
RECEIVED ..
ys “DATE Ot
14-6:07
eee ce Wuerta Herne |
REFERENCE
NUMBERS
007/464 _|
To,
Date ofengagement / /
Accreditation Number,
__Name:,
Notification of Engagement of Private Certifier (Optional format)
Couneil. 1 have been engaged as the private certifier for the building work rete erred to In this application.
Signature:
YL
Page 6
24 May 07 10:41a John Braddock’ 61733926388 1 Facsimile PRIVATE & LUCMIN PTY LTD AGN 076 264 232 24/05/07 From : John Braddock To: Noosa Council Attention: Trish Sweeney Facsimile: (07) 54471062 Pages; this @ / _ SUBJECT ; Development Application _ Confirming that |, John Braddock, am the sole director / company secretary of Lucmin Pty.Ltd being the owner of the property at 51 Wavecrest Dr., Castaways - Beach. : ‘ ‘ oO . | am authorised to sign on behalf of Lucmin Pty Ltd. n Braddock @ Director 1 . PO Box 337 Holland Park QLD 4121 Ph: (07) 3394 3163. Fax: (07) 3394 3201 <[email protected]>
Page 7
INTEGRATED PLANNING ACT 1997
Material change of use
assessable against a local government’s planning scheme Ee
Part D, Version 2.0, 4 October 2004
ew
Exaile,
Completion ofal H applicable questions on n Pat Dis mandatory for al applications involving assessment ofa a
material change of use (MCU) assessable against a local governments planning scheme.
Nature of the application "
A development permit authorises
" development to occur, while a ‘preliminary *
" approval |s a step in the approval process .
. and does not authorise development to, occu
7 This Applicaton is for: {lick For both if eppcable)
The subject tand
For the deli nition’ ‘of ‘gross floor area” go
ee eae neice
= ee. re
“Details of the change to the use eof the lan
ant lend to industry (ive manufacturing) ete)
Associated lg works detalls (if
applicable) *
For the defi nition ‘of ‘site cover’, “gross ftoor | 9 Gross floor, are
e)
area’ and “storey” go to the planning sch
against which the application will be *
‘assessed, :
‘ 10, Nimber a onesie car ati spaces:
i 12 Nuriber of employees: o
3
[Wer Anbit ene LE ” " ‘
11. Number of storeys I maxirhum height above natural ground:
13. Hours and days the use wil operate War aaiton OZ
Associated operational works details 14. Details of associated operational works (e9. landscaping, cut and fil, drainage, road works etc.)
- (iF applicabl : orks @
(apni) (WOT APPL) CABLE |
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager}
Page 8
IDAS Assessment Checklist, Version 20, 2 April 2007
IDAS Assessment
Checklist
(Formerly the “Referrals Checklist”)
IMPORTANT NOTE FOR ALL APPLICANTS: .
1. This checklist was formerly referred to as the “Referrals Checklist". Some of the ‘Guldes’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.
2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.9. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.).
3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.
4, — Therefore, the completion of afl questions in section 1 of this checklist s mandatory for all applications {other than those requiring the completion of Parts A & B only).
5. tis the responsibility of the applicant to accurately complete this checklist.
6. Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.
7,
8.
Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the appiication.
The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to Identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will afso rely on this information when identifying If the
application tiggers referral coordination2.
9, — Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.ald.gov.au. Guide 25 explains the role of the 1DAS.
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www. ipa.atd.qov.au.
11, _Section ; 3 provides advice about the referrals that can be required for applications for building work assessable against the Building | Regulation 2006. _
NP CTATEAS RS LE TR OT BIE PET MEY OEE
"SECTION ue STATE ASSESSMENT, (completion mandatory)
3 The following s state assessment tiggers. apply to development ‘other than ter puliding wor work assessablo against the Building Regulation 2006. %
j Environmentally relevant activity 1. The application involves: (tick applicable box/es)
For more information refer to Guide 4. (1 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
Unless you answered "none of the above" to ai, has not been made - complete Part G of Form 1
the application requires assessment by he pe ~~. . . .
administering auth . O (ii) mobile or temporary ERA for which a code of environmental compliance has not been
Made - complete Part G of Form 1
(iii) none of the above
fan entity, other than the administering
authority, is the assessment manager for the
application, the administering authority is a
| concurrence agency for the appiication i in relation
tothis matter,
Note: An application involving ERA 19 and/or 20
will also require completion of Part Kz of Form 1
for approval where an allocation under the Water}
{ Act 2000 is required.
Continued overeat
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist {if applicable),
OFFICE USE ONLY (applicable to assessment manager)
' DATE RECEIVED * _ REFERENCE NUMBERS «
1 The assessment manager is sesponsible for assessing and deciding an IDAS application, The assessment manager for an application is prescribed in schedule 8A of the IPA.
2 For additional information refer to Guide 6 ‘Ooes my application trigger the referral coordination process?’
3 The ‘administering authority’ may be either the Environmentat Protection Agency, the relevant local government (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for a delegated ERA).
Page 1
Page 9
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
State-controlled road matters
For more information refer to Guide 3.
Unless you answered “none of the above" to 02,
; the application triggers referral to the Department
of Main Roads: (DMR) as a referral agency. -
In certain circumstances DMR will be an advice
agency, while in other circumstances DMR will
be a concurrence agency.
Schedule 2 of the iP Reaulation will assist you to
determine where DMR is an advice or
concurrence agency for the application.
Clearing vegetation :
For more information refer to Guide 12. .,
Unless you answered “none of the above" to Q3,
the application requires assessment by tha
Department of Nalural Resources and Water
RM
If an agency other than NRW is the assessment
manager for the application, NRW is a .
concurrence agency tor the application in relation
to this matter, pes
If you ticked Q3(i) or (ii), your application requires
referral to NRW for assessment regardless of *
whether vegetation clearing is proposed ‘or not.
I
The application involves: (tick appiicable box/es)
LD (i) development on land contiguous’ to a State controlled road and for -
) (@) material change of use assessable against the planning scheme;
C0 (0) reconfiguring a fot unless -
« the total number of lots is not increased; and
« the total number of lots abutting the State-controlled road is not increased;
C1 (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
associated with access to a State-controlled road; or
* for filling or excavation; or
+ involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
(ii) devo'sprrent on land not contiguous to a State-controlled road and -
. . .) material change of use -
4 « assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
(1 (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the !P regulation
and exceeding the thresholds set by that schedule;
(i (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
« assessable against the local govemment's planning scheme; and
¢ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
(ii) none of the above
The application involves: (tick applicable box/es)
C1 (i) material change of use -
{a} assessable against the planning scheme;
{b) ona lot containing -
* acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« if there is no property map of assessable vegetation for the lot - remnant vegetation;
{c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
reconfiguring a lot —
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
{b) where the size of the lot before the reconfiguration is 2 hectares or larger;
{c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
(1 (ii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 4
oh
Diii)
iv) none of the above.
Strategic port land .
For more information refer to Guide 14. -
If you ticked (i) - the relevant Port Authority is the
assessment manager for the application.
yr you ticked (i) Queensland Transport is a
concurrence agency for the application.
The application involves:
C1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part ! of Form 1
CO (i) a material change of use that is inconsistent with the land use plan approved under the
4 Land contiguous to a State-controfled road is defined in schedule 44 of the [P Regutation to mean land - if part of the land is within 100m of the State-convolted road; or that is part of a future State-
controlled road.
Page 2
Page 10
INTEGRATED PLANNING ACT 1997
Acid sulfate soils P18.
For more information refer to Guide 10.
Unless you answered “none of the above" to 95,
thé application requires assessment by
Oepartment of Natural Resources and Water
(NRW). . ux
It an agency other than NRW is the assessment
manager for the application, NRW is an advice *
agency for the application in relation to this
matter.
IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves development on land situated in an identifieds local government area
and where the surface of the land is: (tick applicable box)
— CI (i), below 20m AHD® and the development will involve the excavation of 1000m’ or more of
soil or sediment at or below 5m AHO, oF
CO (ii) at or below 5m AHD and the development will involve filling the site with 1000m? or more
of material
(iii} none of the above
Major hazard facilities or possible
major hazard facilities .
For more information refer to Guide 47.
{f you answered "YES" to Q6, the appl ication
mes assessment by the Department of
Emeraer ny Services (DES).
if an agency other than DES is the assessment
manager for the application; DES is a
concurrence agency for the app Ration in
elation to this matter,”
6. Does the application involve a material change of use for a major hazard facility or possible
major/nazard facility as defined under the Dangerous Goods Safety Management Act 2001?
Oo
(YES - complete Part £ of Form 1
a
¥
Water Act 2000 ’
For more information about items (a) - (f}, refer
to Guide 15, For more information about item .
(9), refer to Guide 14 Does ary application!”
involve assessment of a referable dam? . «.
Unless you answered “none of the above" to Q7,
the application requires assessment by the
Department of Natural Resources. “and Water 2
(NRW). .
Ifan agency other than NRW is the assessment
manager for the application, NRWis a
concurrence agency for the application in.
telation to this matter. -
tet we
Water related development under the | 7,
The application involves:
(1) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es}
(1 (@) ina watercourse, lake or spring, (eg. @ pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Kz, K3, Ka, Ks, or Ks of Form 1 whichever is applicable;
(1 (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
Ky of Form 1;
C1 (c) for a subartesian bore, in declared subartesian area’, or in a certain area
covered by a water resource plan, for use for purposes other than stock and/or
domestic use - complete Part K; of Form 1;
(1d) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part Ks of Form 1;
(1 e) for taking overland flow water in certain areas covered by a water resource plan
— complete Part Ks of Form 1;
(1 (f) for interfering with overland flow water in a drainage and embankment area -
complete Part Kiof Form 1
(1 @Q) for constructing a referable dam? or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; OF
{ii)_ none of the above.
aren nena — oe wy
watercourse = *
For more information refer to Guide 16. “
Iyou answered "YES" fo Q8, the application
fequires assessment by the Department of
Natural Resources. and Water (NRW).*
ifan agency othér than NRW is the assessment
manager for the application, NRWisa _
concurrence agency for the application | in,
felation to this’ matter, .
Note: Part G of Form 1 is required to be t
completed as the activity of removing guary
material from a watercourse is also an
Environmentally Relevant Activity (ERA).
Removal of quarry material froma | 8.
Does the application involve development for the removal of quarry material from a watercourse®
reqytting an allocation notice under the Wafer Act 2000?
NO
1 YES - complete Parts Kz and G of Form 1
5 The identified local government areas are: Aurukun, Bowen, Brishane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloota, Dounglas, Fitzray, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redtand, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
Australian Height Datum (AHO).
The declared ground water areas ara listed in Guide 1.
Referable dam is defined under the Water Act 2000.
Watercourse is defined in sch 10 of the IPA.
wenn
ment area,
Page 3
Page 11
INTEGRATED PLANNING ACT 1997 ' Operational work that is tidal work or work in,coastal management district : For more information refer to Guide 18. For , more information about prescribed tidal work in local government tidal areas refer to Guide 24. Unless you answered "none of the above" to Q9, the application requires assessment by the * Environmentat Protection Agen: cy (EPA). if an agency other than EPA is the assessment manager for the application, EPA is a concurrence agency for the apptication in relation to this matter. Local government is the assessment Manager for all preserbed tidal work. ~ Operational work below “igh water mark For more information refer to Guide 18. For more information about prescribed tidal work in local government tidal areas refer to Guide 24, Unless you' answered ‘none of the above” to Q10, the application triggers referral to. Qld) as a Concurrence agency. Local government is the assessment manager for all prescribed tidal work, * | f Coastal management For mare information refer t Guide 18. Unless you answered “none of the above” to Q11, the application requires assessment by the Environmental Protection. Agency (EPA). if an agency other than EPA is the assessment | manager for the application, EPA is a concurrence agency for the application i in felation to this matter, . 10 Tidat work is defined in sch 10 of the IPA. 9. IDAS Assessment Checklist, Version 20, 2 April 2007 The application involves operational work that is: (tick the applicable box/es) (1 (i) tidal work'® as defined under the Coastal Protection and Management Act 1995 (the Coastal Act) that is not prescribed tidal work - complete Part M of Form 1, of O (ii) tidal work that is prescribed tidal work"' other than in a canal’? -complete Part P of Form 1; or (ii) cared out within a coastal management district under the Coastal Act and for - complete Part Mof Form 1 if any box/es (a) to () below are ticked, (1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie. other than those works in tidal water) where the development has been determined not to be assessable against the Water Act 2000 ; C1 (b) constructing a canal intended to be connected to tidal waters; [1 ©) constructing an artificial waterway; Ld) reclaiming land under tidal water; Le) disposing of dredge spoil or other solid waste material in tidal water; C1 (f) interfering with quarry material on State coastal land above high-water mark; (1g) draining or allowing drainage or flow of water or other matter across State coastal land above high-water mark; [1 (hb) removing or interfering with coastal dunes on land, other than State coastal land, that is in an erosion prone area and above high-water mark; (1 (i) constricting a bank or bund wall to establish a ponded pasture on land, other than State coastal land, above high-water mark; or f (iv) _none of the above. 10. The application involves operational work that is: ( tick the applicable box/es) (i) tidal work' as defined under the Coastal Protection and Management Act 1995 (the Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 4; or C1 (i) tidal work that is prescribed tidal work" - complete Part P of Form 1; of C1 (ii) carried out within a coastal management district's under the Coastal Act and for - (1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part M of Form 1; (1 () rectaiming land under tidal water - complete Part M of Form 1; or (1 (©) constructing a canal, if the canal is associated with reconfiguring a lot - complete Part M of Form 1; (iv) none of th the above, 11. The application involves: (tick the applicable box/es) (] (i) a material change of use assessable under a planning scheme involving operational work cartied out completely or partly in a coastal management district CO (ii) a material change of use assessable under a planning scheme involving building work, carried out completely or partly in a coastal management district that is ~ « the construction of a new premises with a GFA'® of at least 1000m2 « the enlargement of the GFA of existing premises by more than 1000m? Di iii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated completely or partly in a coastal management district [1 Qf) reconfiguring a lot'’ assessable under schedule 8 of the IPA and in connection with the construction of a canal — complete Part M of Form 1 fi (v) _none of the above _ 14 Prescribed tidal work Is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or party within a local government tidal area, 12 Canal means canal as defined under the Coastal Protection and Management Act 1995 13 Tidal work is defined in sch 10 of the IPA. 14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal araa. 15 Coastal management district is defined in sch 10 of the (PA and means a coastal management district under the Coastal Protection and Management Act 1996, other than an area declared as a coastal management distict under section 47(2) of that Act 16 GFA Is defined in sch 14 of the IPA to mean the gross floor area, For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed. 17 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificia! waterway, must be accompanied by the application for the operational works to construct the arlificial waterway. Page 4
Page 12
INTEGRATED PLANNING ACT 1997 Development within the limits of a. :port . 8 j For more information refer to Guide 18. For information about prescribed tidal work refer to Guide 24, (fyou answered “YES” to 012, the application triggers referral to the Port Authority, Ths Port Authority is a concurrence agency if the developmentis-* ® within 200m of a shipping channel or an entry and exit shipping corridor for the port ¢ within 1000m of a swing basin, a commercial shipping wharf, a mooring, anchorage ors. pail grounds; * within 1000m of a planned port facility identified in a land use plan approved under the Transport infrastructure Act 1994, In all other situation the Port Authority is an advice agency. © : Marinas For more information refer to Guide 18, For . information about whether a marina is prescribed tidal work refer to Guide 24. The focal qn government is the assessment, manager for al prescribed tidal work, lf you answered "YES fo Q13, the application triggers. referral to Queensland Fire and Hess 8 Service as an advice agency. . Tidal works in strategic port land tidal areas ~ For more information refer to Guide 18, Unless you answered "NO" to 014, the relevant Port Authority is the assessment manager | for the application and the nts Agency (EPA) and Queensland Transport (QT) are concurrence agencies for the application. Heritage For further information refer to Gate 19 If you answered "YES" to Q15, the app! ation triggers referrat to the Queensland Heritage | Council as concurrence agency for the application. ft ws Unless you answered “none of the above” to Q15(b), the application involves referral to the Environmental Protection Agency as an advice agency for the aplication Declared catchment areas For mora information, including a list of the declared catchment areas within Queensland, refer to Guide 13. Untess you answered “none of the above” fo Q16, the application requires assessment by the iment of Natural Resources and Watt (NRW). * . If an agency other than NRW is the assessment 1 manager for the application, NRWis a concurrence agency for the application in T relation to this matter. (DAS Assessment Checklist, Version 20, 2 April 2007 12. Does the application involve development below high water mark*® and within the limits of a port undeyAfe Transport Infrastructure Act 1994? NO (1 YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed fidal work 13. Does the application involve operational work that is tidal work for a marina’? with more than 6 vessev berths? oO (YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work / f£ 14, Doapfhe application involve tidal works within a strategic port land tidal area2?? NO (71 YES - complete Part Mof Form 1 15. Doesfhe application involve development in a heritage registered place as defined under the Quy€nsland Heritage Act 1992? NO (7 YES - complete Part C of Form 1 15(b) The application involves: (tick applicable boxes) (4 (i) a material change of use assessable against the planning scheme and the lot shares a common boundary with a protected area or registered place under the Queensland Heritage Act 1992; reconfiguring a lot if the lot shares a common boundary with a protected area or registered place under the Queensland Heritage Act 1992; none of the above. 16. The application is in an aréa declared to be a catchment area under the Water Act 2000 and involves: (tick the applicable box/es) (CQ) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares; Oi (i) Aevelopment assessable against the planning scheme involving the establishment or expansion of a waste water disposal system, other than a disposal system for carrying out an environmentally relevant activity under the Environmental Protection Act 1994; iii) none of the above 18 High water mark is defined in the Coasta! Protection and Management Act 1995 and means the ordinary high water mark at spring tide. 19 Marina is defines in the Transport Operations (Maritime Pollution) Regulation 1995, 20 Strategic port land tidat areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land. Page 5
Page 13
INTEGRATED PLANNING ACT 1997
Contaminated land
Applications involving materiat change of use
and/ or reconfiguring a lot may Bagger this
referral,
For more information refer to Guide 5.
Unless you answered ‘none of ihe above” to
Q17, the application requires assessment by the
Environmental Protection Agency (EPA). If an
agency other than EPA is the assessment
manager for the application, EPA will be a
concurrence agency for the application in
felation to this matter.” .
Electricity infrastructure ~
For more information reter to schedule 2of the IP
Regulation, y
Unless you answered “none aie the above’ to
Q18, the application triggers referral to the
lency to which the easement is granted in
favour of as advice agency. ~~
: oe
Land designated for ommunity
infrastructure
Applications involving development on land
designated for community infrastructure may
trigger this referral,
For more information refer fb schedula 2ot the
{PReautalion =
Hyou answered "YES" to Q19, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development, for the designated purpose.
If an agency othér than the designator is the *
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter, #
#)
(DAS Assessment Checklist, Version 20, 2 April 2007
17. The application involves: (tick the applicable box/es)
(1 @ reconfiguring a fot for which all of part of the premises are -
: (a) premises mentioned in the iPA, schedule 8, part 1, table 2-
« item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exemption otherwise provided for by paragraph (e); or
+ item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
{b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
OO (i) a material change of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
f (iii) none of the above
18. The application involves: (tick the applicable box/es)
(i) reconfiguring a fot where any part of the lot is -
+ subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or
« situated within 100m of a substation site;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
operational work that is filing or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
« the work is located wholly or partly within 10m of a substation site;
f(v)_none of the above.
Diii)
Diii)
Ow
19. Does the application involve development assessable against the planning scheme and on tand
designated for community infrastructure?
{i} intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development -
(ay for the designated purpose; or
}) carried out by, or on behalf of, the designator.
0
YES
Page 6
Page 14
INTEGRATED PLANNING ACT 1997
SEQ Regional Plan
¢ For more information refer to schedule 2
IP Regulation. :
Refer to Chapter 2, part SA and schedule 10 of
the Integrated Planning Act 1997, and schedule
2 of the Regulatory Provisions for retevant
definitions. * .
Unless you answered “none of the above” to
Q20, the application requires assessment by the
Office of Urban Manage! ment (OUM).
of the
” “t
IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick appiicable boxes) -
C1 (i) amaterial change of use of premises -
(a) in a Major Development Area in the Urban Footprint for -
OO (i) anurban activity -
(1 inan area included in a structure plan where the IPA, section 3.1.6
applies;
(1 inanarea not included in a structure plan where -
« the IPA, section 3.1.6 applies fo the application for the material change
of use; or
« the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2; or
« impact assessment is required under the relevant planning scheme
LD) (i) intensive animal husbandry, or
CO (ii) residentiat development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
OO (i) anurban activity and not specified in section 2.4(2); or
1 (ii) residential development involving a ruraf residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
(d) in the Investigation Area for -
(1 @ anurban activity and not specified in section 2.10(2);
CO (ii) residential development involving a ruraf residential purpose and not
specified in section 2.12(2); or
OO ii) intensive animal husbandry
(ii) reconfiguring a lot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
| _ (iii) none of the above
O
Fisheries matters
For more information refer to schedule 2of the {P
Unless you answered "none of the above" to
Q21, the application requires assessment by the
Department of Primary industries and Fisheries
{DPI8F). ~ fy .
If an agency other than DPI&F is the assessment
manager for the application, OPI&F is a
concurrence agency fot the application in
relation to items (i) ~ (Iv) and an advice agency
in relation to item (v). .
+
21. The application involves: (tick the applicable box/es)
(CI ())_ an assessable material change of use for aquaculture - complete Part O; of Form 1;
Li (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Os of Form 1;
( (ji) assessable operational work completely or partly within a declared fish habitat area-
complete Part Oz of Form 1;
( (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
(1) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
(vi) none of the above.
Page?
Page 15
INTEGRATED PLANNING ACT 1997
; !ntegration of land use and public
transport .
For more information refer to Guide 23, schedule
8A of the PA, & schedule 2 of the IP Regulation,
Unless you answered ‘none of the above’, the
_ | apptication triggers raferrat to OT as a
concurrence agency.
22,
IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves: (tick the applicable box/es)—
LC (ia material change of use assessable against the planning scheme for a purpose
mentioried in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
LD (ii) reconfiguring a fot—
(J (a) on land that is completely or partly within a public transport corridor, and the
total number of lots increases;
(1(b) _ onland that is completely or partly within a future public transport corridor or
an airport's public safety area;
C1 (6) _ on lan that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
(1 (¢) fora residential purpose within the 25 ANEF contour for an airport;
(Ce) for a residential purpose resulting in 100 or more allotments.
C1 (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
Railway safety and efficiency
For more information refer to Guide 23, schedule
8A of the IPA & schedule 2 of the IP Requlation.
Unless you answered “none of the above’, the
apptication triggers referral to QT-as a
concurrence agency.» 1
Moonie to Brisbane pipeline’,
For mora inforration refer to schedute 2of the (P
Regutation. * .
Unless you answered “sone of the above’, the
application triggers referral to the holder of
pipeline Ecence No 1 issued under the Petroleum
Act 1923, currently Santos QNT Pty Ltd, for
advice.
23.
24.
above, on land that—
C1 (a) _ is completely or partly within a public transport corridor or a future public
transport corridor,
{J (b) will result in work that encroaches into an airport's operational airspace.
none of the above.
The application involves: (tick the applicable box/es})~ .
(C1 () a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.
D Gi) reconfiguring a fot—
L1@)__ onland that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
(1 (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater,
[1 (c) _ ontand that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
[1 @) __ onland that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
(1 (e) _ onland that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
CJ (f for a residential purpose resulting in 100 or more allotments.
CO (il) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m?, on land that—
C1 (a) _ is compietely or partly within rail corridor land or commercial corridor and, and
the work is not for rail transport infrastructure or other rail infrastructure;
(1 (b) _ is completely or partly within future railway land, or a railway tunnel easement;
Lic) abuts rail corridor !and, commercial corridor land or future railway land, and
, the work is within 25m of the railway boundary.
(iv) none of the above.
The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
C1 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.
LC (ii) reconfiguring a lot
LO (iiYoperational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
(iv) none of the above.
Page 8
Page 16
INTEGRATED PLANNING ACT 1997
Koala habitat area
For more information, refer to Guide 26 and
schedule 2 of the IP Requlation.
Unless you answered “none of the above’, the
application requires referral to the Environmental,
Protection Agency as a concurrence agency.
4
1s * i
IDAS Assessment Checklist, Version 20, 2 April 2007
25. The application involves: (tick the applicable box/es)—
LO (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in ~
(11 @) clearing of native vegetation over an area greater than 2500m?;
(1 (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m?;
(c) an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m2; ,
(d) extracting gravel, rock or sand from an area greater than 5000m?;
(e) excavating or filling an area greater than 5000m?;
(f) additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.
C1 (ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will
result in -
(1) anincreased number of lots;
[1 (b) clearing of native vegetation over an area greater than 2500m?,
(ii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m?,
C1 (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in -
(1 (a) clearing of native vegetation over an area greater than 2500m?;
(1 (b) extracting gravel, rock or sand from an area greater than 5000m?;
(1c) excavating or filling an area greater than 5000m2,
od none of the above.
O
O
O
O
Wild river area ae
For more information, refer to Guide 27.
Ifyou answered YES to Q26, you must also
complete section 2 of this checklist.’ This will
enable you to determine if your application can 4
proceed in a wild river area and which referral
agency will asséss your application against the
Wild Rivers Code, or if the proposed
development is “prohibited” in a wild river area.
Noto: Devefopment can be ‘prohibited’ in a wild
river area because the application cannot be
accepted by the assessment manager. ie
Preliminary Approval
Ifyou answered YES to Q27, the application
triggers referral to the Department of Local
Government, Planning, Sport and Recreation as
an advice agency.
26. Does the application involve development in a wild river area declared under the Wild Rivers Act
200,
NO
OL YeEs
27. Does jMe application involve a development for which preliminary approval is sought under
Segfon 3.1.6 of the Integrated Planning Act 1997?
NO
(0 Yes
Wetlands ,
t Boy
Domestic activity means the construction or use
of a single residence on a tot and any reasonably
associated building or structure. Examples of a
building or structure that could be reasonabl y
associated with a single residence include:
‘carataker’s rasidence, granny flat, building or
Structure used for a home business.
Note: Wetland is defined in the Integrated
Planning Regulation 1998.
Unless you answered “none of the above" to
028, the apptication involves referral to the
Environmental Protection Agency as an advice
j agency for the application.
28, The application involves: (tick the applicable boxes) -
C() ~— amaterial change of use, other than for a domestic activity, assessable against the
planning scheme that is in or within 100m of a wetland;
O (i) reconfiguring a lot -
In or within 100m of a wetland that will result in
[1 @) more than 10 lots being created; or
C1 (b) lots less than 5 hectares;
{iii) none of the above
Page 9
Page 17
INTEGRATED PLANNING ACT 199! Conservation Estate « Sal sh Urban purposes is defined in the Integrat it Planning Act 1997 as “purposes for which land is used in cities or towns, including residential, industrial, sporting, recreation and commercial , purposes, but not including environmental, conservation, rural, natural or wilderness area purposes’, ‘ ‘ : ‘ jh eed tg | Untess you answered "none of the above" to Q29, the application involves referral to the - Environmental Protection Agency as an advice agency for the application. « 0 co a : IDAS Assessment Checklist, Version 20, 2 April 2007 29. The application involves: (tick the applicable box/es)— C1 (i) a material change of use for urban purposes that is in or within 100m of any of the following - (1 (a) a protected area, forest reserve, critical habitat or area of major interest under the Nature Conservation Act 1992;; a State forest or timber reserve under the Forestry Act 1959; a marine park under the Marine Parks Act 2004; a recreation area under the Recreation Area Management Act 1988; a world heritage area listed under the World Heritage Convention; Brisbane forest park under the Brisbane Forest Park Act 1977. 0 (ii) reconfiguring a lot if - LJ (a) any part of the lot is situated in, or within 100m of, any of the following - (i) aprotected area, forest reserve, critical habitat or area of major interest under the Nature Conservation Act 1992; Cdl) a State forest or timber reserve under the Forestry Act 1959; OO (it) a marine park under the Marine Parks Act 2004; Ot O b poo05 TFeeocet iv) arecreation area under the Recreation Area Management Act 1988; (v) a world heritage area listed under the World Heritage Convention; Brisbane forest park under the Brisbane Forest Park Act 1977; and [1 (b) the reconfiguration involves more than 10 lots being created, or any lot resulting from the reconfiguring is less than Sha; (iii) none of the above. Page 10
Page 18
INTEGRATED PLANNING ACT 1997
i
3
i Wild River Area) oo of,
itthe responsibility of the appilcant to
determine If the cevetcemert ts proposed in
awild Aver ‘area
information ‘about ‘wild river areas including the
geographical location and position of | *
management areas in relation to properties, can
be accessed by contacting the Department of
Natura! Resources and Water (NRW), accessing
the department's website www.nnw.qid gov.au or
contacting the department by email on:
wild. [email protected],au
Note on Referrals
Referrals for development in a wild river area
(other than for agricuttural activities and animat
husbandry activities) are not changed from the
existing referral arrangements.
Notes on development assessable
against the Wild Rivers Code. - *
For information regarding development in a wild
river area, see the relevant wild river declaration
and Guide 27, The relevant wild river
declaration will provide information regarding
which types of development must be assessed
agains! the Wild Rivers Code, and in some *
cases which types of development are exempt
from wild river requirements. o
The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this _
May vary between wild river areas. The rele vant
declaration will provide the information applying
to each wild river area. 2 «
Applications for some new developments will not
| be accepted if the proposed development is in a
high preservation area (HPA }. Most applications
for development activities which may be made
Including those in a preservation area (PA), must
be assessed against and must comply with the ~
Wild Rivers Code where indicated i in a relevant
IDAS Assessment Ghecktist, Version 20,2 2 Apt 2007
SECTION 2 “ASSESSMENT, IN'A WILD RIVER AREA Ih
E (completion mandatory i ifthe propos development i is located in a wild’ priver. area) -
1.
sCTION 2 ASSESSMENTIIN A.
Which wild river area is the development proposed in?
The proposed development is to be located in: (tick the applicable box/es)
Ci) a high preservation area (HPA);
Lil) a preservation area (PA) ;
oO iii) a wild river floodplain management area (FMA);
(Ziv) a wild river nominated waterway;
(2 v) a designated urban area (DUA).
which an application may be made in a HPA’
IFYES and you ticked Q4 box i) the application’ '
may be mada and is assessable against the Wild
Rivers Code. tf YES and you ticked 04 box ii)
the application will not be accepted.
Note: lf clearing native vegetation is ina PA,
there ara no wild river requirements and
provided there are no other aspects of this
development where wild river requirements
apply, do not complete the remaining questions
fi in Section 2, .
wild river declaration. " a
Environmentally relevant activities |2. Does the proposed development only involve any of the following environmentally relevant
{ERAs) in a designated urban area activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?
{fyou answered YES, your application for. an tr 6
ERA is exempt from any wild river requirements i) An ERA 28 or ERA 14; or
and provided there are no other aspects of this ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59,
development that require assessment against
wild rivers, you do nol need to complete the Ono (J YES (ensure you have completed Part G of Form 1)
remaining questions in Section 2. .
Ifyou answered NO to Q2, please complete ine
remaining questions in Section 2. la
Clearing native vegetation — ‘ |3. Is the application operational work for clearing native vegetation in a HPA?
IFYES, there aro a limited number of purposes
far which en application to clr naive > “p oO NO (71 YES (ensure you have completed Part J of Form 1)
vegetation may be accepted ina HPA. See :
Gulde 27 for a list of relevant purposes for | 4. If YES, is the clearing?
(C1 }) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or
(2) ii) in a HPA outside a registered area of agriculture?
Page 14
Page 19
1 INTEGRATED PLANNING ACT 1997, areas If you answered YES to Q5, and i ticked any boxes in Q6), your application is required to be * assessed against and m t comply with the Wild Rivers Code.” \ ay if you answered YES to 05 ‘and licked bo box i in Q6, your application i is req ired to be teferred to the EPA, Note: tf specified works are ‘proposed i ina * cal government area, itis prescribed tidal work - the relevant focal goverment will be the « assessment manager with the EPA as a3, concurrence agency If you answered YES to Q5, and ticked box ii) or iii) in 06, your application requires referral to © DPIF, If you answered No to 05 ‘and ticked box “i in 06, the application, will not be accepted. IFyou answered NO to Q§, ticked box ii) in Q6 and. the development is necessary to Install authorised works or infrastructure where a development permit is not equired, or if a required permit is held, the application must be assessed against and must comply with the Wild Rivers Code. Applications for purposes other than specified works or as described above will not be accepted. you answered NO at Q5 and ticked box fi) in Q6, the application may be made if the works are ina PA. These applications must be assessed against and must comply with the Wild Rivers Code. The application will not be accepted if the development is proposed to be located in a HPA, Fér more information about specified works refer toGuide 27 “* IDAS Assessment Checklist, Version 20, 2 April 2007 Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27- Development in a wild river area) C]Nno LJ yes The application is for one or more of the following: CO] i) Operational works that is tidal works or works in a coastal management district (ensure you have completed Part M and/or Part P of Form 1); or oO ii) Operational works for the removal, destruction or damage of marine plants (ensure you have completed Part O2 of Form 1); OF O ii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1). Residential, commercial or industrial development od If you answered YES to Q7, your application is + not-subject to wild river requirements, Provided there are no other aspects of this development that require assessment against the relevant wild river declaration or Wild Rivers Code, you do not need to complete the remaining questions in Section 2. . IFyou answered NO to Q7 and ticked either box l) or il) in Q8, the assessing agency is the relevant local government, The application must be assessed against and must comply with the Wild Rivers Code. 2 4 Is the application for residential, commercial or industrial development in a designated urban area? CJ)No CI Yes If NO, does the application for residential, commercial or industrial development involve: O i) a material change of use made assessable in a local goverment planning scheme (ensure you have completed Part D of Form 1); or Ci operational works associated with reconfiguring a lot (ensure you have completed Part F of Form 1). Animal husbandry activities: | If you answered YES to Q9 your application requires assessment against and must comply with the Wild Rivers Code. The assessing agency is NRW. . Note: Applications for animal husbandry activities will not be accepted if proposed in a HPA, For more details and a definition of animal husbandry activities see the Wild Rivers Act 2005 and refer to Guide 27. Does the application involve a material change of use for animal husbandry activities (as defined under the Wild Rivers Act 2005) in a PA? [No LD YES (ensure you have completed Part R of Form 1) Agricultural activities you answered YES to Q10, your application requires assessment against and must comply with the Wild Rivers Code. Tha assessing agency is NRW. Note: Applications for agricultura! act ivities wil hot be accepted if proposed in a HPA. For more details and a definition of agricultural aclivitias see the Wild Rivers Act 2005 and refer to Guide. The production of fodder ina PA, and'pasture improvement using low impact soil disturbance techniques is not an-agricultural activity as defined under the Wild Rivers Act 2005. For more information see Guide 27. ‘J 10. 1. Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in aPA? Cno If YES is the application for: [2] i) a material change of use; or 1 ii) operational works. (71 YES (ensure you have completed Part Q of Form 1) Page 12
Page 20
INTEGRATED PLANNING ACT 1997
‘Works that take overland flow water
The relevant wld fiver declatation will state a
t works that take overland flow water are either
self assessable or assessable, or ‘are eeret
from wild river requirements. .
Ifyou ticked Q13 i your application ‘must te
assessed by NRW against the Wild Rivers Code
and must comply with the code. . a
Ifyou tioked Q13ii) an application i is not required
to be made however the works must comply with,
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become =<’
assessable development for which an application
is required and must be assessed by NRW .
against the relevant ‘part of the Witd Rivers, oda
and must ‘comply with the code, s
Ifyou ticked Q13 iit) your applicaticn | is not %
Subject to wild river requirements.” -
| Applications for development that is other than”
that stated to be assessable, self-assessable or”
exempt will not be accépted. |
13,
IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve works that take overland flow water in a HPA or an FMA?
LINno (DYES (ensure you have completed Part Ks of Form 1)
If YES, is the application for works stated in the relevant wild river declaration to be?
oO i) assessable works
[J] ii) self-assessable works
J iti) exempt works
Works. that interfere with overland ,
flow water 5. :
The relevant wild river declaration will state
works that interfere with overland.flow water that
are either self assessable, assessable or exempt
frém wild river requirements. - eo
If you. ticked Q15 i), your application must be ~
assessed by NRW against the Wid Rivérs Code’
and must comply with the code: ZR” . .
IF you ticked Q15 ii) an application i is not required
thé relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
if you ticked O16 ii) Your appation | is not
Subject fc to wild river requirements. « ”
Applications ‘for development that is other than
that stated to be assessable, self-assessable 0 or
exempt will not be accepted. wort
fo be made however the works must comply with |
14,
15.
Does the application involve works that interfere with overland flow water in a FMA?
Jno L] YES (ensure you have completed Part Kio of Form 1)
If YES, is the application for works stated in the relevant wild rivers declaration to be?
LJ i) assessable works
(ii) selt-assessable works
(J it) exempt works
Waterway barrier work . *
Applications for building or raising alenway 4
barrier works in a HPA will not be accepted.
Mt you answered YES to Q16, your application .
must ba assessed by DPIF against the Wiki «
Rivers Code and must comply with the code.
16.
Does the application involve building or raising waterway barrier works in a PA?
[no C] YES (ensure you have completed Part 03 of Form 1)
Aquaculture {non ERA)
Applications for aquaculture it in a HPA will not be
accepted, :
ity you answered YES to Q17, your application’
must be assessed by DPIF against the Wild &
Rivers Code and must comply with the codé.-”
17.
Does the application involve aquaculture in a PA?
(no J YES (ensure you have completed Part O; of Form 1)
Works that interfere with water i in ay,
watercourse het
Note!” ‘if the development is is proposed ry aHPA, ,
applications for all works that interfere’ with water
in a watercourse {including ‘dams or weirs, 3:
stream realignment or stream diversion) wil not
be aocépted. | an
InaPA, spplications for instream dams and :
weirs may be accepted in nominated waterways.
IRyou ticked box ii) in Q19, your Pppleaion will,
not be accepted. ee we *
Nota: Operational Works outside a 1 HPA or *
nominated waterway are not subect to wild ; i
iver. Fequirements. a
Moré information and locations of naminated
waterways is availablé by contact NRW, ”
accessing the department's website”
www. nrw.aid.gov.au or contacting the
department by email on; . *
wild. [email protected] dov.au. *
18.
Does the application involve operational works that interfere with water in a watercourse that is in
anominated waterway in a PA?
(No
If YES,
(11) The application is for an instream dam or weir; or
(] ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.
LC Yes (ensure you have completed the relevant Part K of Form 4)
Page 13
Page 21
INTEGRATED PLANNING ACT 1997
; Environmentally relevant activities
| Mast applications for an ERA in a HPA will not:
be accepted. Applications which may be made
4 require referral to the EPA. The assessment of
| some ERAs is assessed by NRW, others have
| been devolved to DPIF, NRW or delegated
local government (see EPA website for more
information on devolved ERAS) °
complete Qs 21-24,
If you answered YES to an and the
development is in a PA, your application must be
assessed by the administering authority?"
against the Wild Rivers Code and must comply
with the code, unless the proposal és for
development where an application will not be
accepted, or is exempt from wild river
requirements (see Q2). You will be able to
determine if an application will not be accepted
for the development by answering Q21 - Q24.
If you answered NO to Q21, you do not need to
complete Q22. If you answered YES to 021 you
are required to complete Q22.
tf you’ answered NO to 022, the application will”
‘not be accepted. if you answered YES to Q22,
the application must be assessed by NRW.
against the Wild Rivers Code and must comply
with the code.
ff you answered NO to Q23 and the develop ment!
is proposed in the HPA the apptication will not be
accepted, Ifyou answered YES to 023, the
application must be assessed by the EPA or .
NRW {as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code.
ff you answered YES to Q24 the application will
not be accepted,’ If you answered NO to Q24, ~
your application must be assessed by NRW
against the Wild Rivers Code and must comply ,
with the code.,
Exempt ERAs Ina designated urban~
area.
Kt the development i is proposed in a designated
urban area there may be no wild river
requirements. See Section 2.Q2.
Note: All applications that can be accepted must
be assessed against and must comply with the
Wild Rivers Code (other than exempt ERAs in a
designated urban area).
if you answered NO to Q20 you do not need to +
20.
21.
22.
23.
24.
IDAS Assessment Checklist, Version 20, 2 April 2007,
Does the application involve an ERA?
Ol NO [YES (ensure you have completed Part G of Formt)
Is the application for an ERA 20 instream?
(no CL yes
ls a quarry allocation notice held for the proposed ERA 20 instream?
mie Clyes
Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, (and is for specified works or a residential complex}
ii) an ERA 19 (dredging)
iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in *
the Wild Rivers Act 2005, and Environmental Protection Act 1994)
iv) an ERA 22 (out of stream)
Jno Clyes
Is the proposed development for ERA 20 (out of stream) and;
— inaFMA; and
— not low impact; and
— not for a residential complex in the area, or for specified works.
Ono LJyYes
Documentation
\f you answered NO to Q25, your appfication
may be subject to an information request and
processing of the application may be delayed.
25.
Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in the relevant part/s of the Wild Rivers Code?
CINo Clyes
1 The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW.
Page 14
Page 22
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007 PRR ESESCAT SECTION 3 BUILDING REFERRALS (completion not mandstory) lie Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checkiist is not required to be completed and lodged with an application for building work assessable against the Building Regulation 2006 only. Special fire services - ~ generally 1. For niora information goto schedule 2 table 1 and schedule 2A of the IP Requiation. Assessment Period 18 5 days. No reapanie is a. deemed refusal. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work requires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998 (IP Regulation) or includes an alternative solution assessed against the performance requirements of the Building Code of Australia. Fire safety for budget accommodation 2. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work For mora information go to schedule 2 ofthe |P the subject of the application requires the installation of a fire safety system for a budget accommodation Regulafon : : building. Spray painting = . 3. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency For more information go t schedule 2 of the IP if the application involves a workplace incorporating spray painting. Regulation . Retail meat premises . 4. An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a For more information go to schedule 2of the P tetail meat premises. Reguiation . Private health facilities 5. An application may trigger referral to the Department of Health as a concurrence agency if the application For more information go to schedule 2of the IP involves a private health facility. Requlation . Workplace area less than 2 3m? “16. — An application may trigger referral to the Department of industrial Relations (DIR) as an advice agency if the For more information go to Schedule 2of the iP- Regulation . application involves a work place area less that 2.3m2. Land contiguous toa State-controlled 7. road © For more information go to Schedule 2of ine e* Regulation An application may trigger referral to the Department of Main Roads as a concurrence agency or advice agency if the application involves land contiguous to a State-controlled road. Pastoral workers accommodation 8. For more information go to schedule 2 of the 1P An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency if the application involves pastoral workers accommodation. Child care centre ~ (9. For more information go to schedule 2 of the IP Regulation, ‘i An application may trigger referral to the Department of Communities as a concurrence agency if the application involves a childcare centre. Coastal development — ‘ 10. An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency For more information go to schedule 2 of the ip”. if the application involves land completely or partly seaward of a coastal building line2. Regulation a Heritage * * +.” “144. An application may trigger referral to the Heritage Council as a concurrence agency if the application For more inforation 90 to schedule 2 of the Pp involves a heritage registered place. Reaulation . - Fisheries matters % . 12. An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a es ren information go to schedule 2 of the IP concurrence agency if the application involves assessable building work in a declared fish habitat area; or equ ” af as an advice agency if the application involves assessable building work on land that adjoins a declared fish habitat area. . Integration of land use and Public 13. transport For mare information go to schedule 2 of the IP Begulaton An application may trigger referral to Queensland Transport as a concurrence agency if the application involves existing or future public transport corridors, or airport operational airspace”. Railway safety and efficiency For more information go b schedule 2 of the IP. Regulation 14. An application may trigger referral to Queensland Transport as a concurrence agency if the application involves future railway land. NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no response is taken to be a deemed approval. Amenity and aesthetic impact of.. . 15. An application will trigger'a referral to the local government if it is : particular building work for sing!e_ ° for asingle detached class 1 building or class 10 structure; and detached class 1 building or class 10° the local government has declared by resolution the following: building or structure * the appearance of the building or structure will have an extremely adverse impact on the amenity of For more information go to schedule 2 table 4 of the the locality; and PR a — the appearance of the building or structure would be in extreme conflict with the character of the Assessment period 15 days. No response is a locality. deemed approval. 7 ® Coastal building lines are prescribed under the Coastal Protection and Management Act 1995. 3 Operational airspace is as defined in State Planning Policy 4/02 "Development in the Vicinity of Certain Airports and Aviation Facilities". Page 15
Page 23
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
.| designated rainwater tank area ©
For more information go tp schedule 2 table 1 of the
IP Requlation and the QOC part 25. .
Assessment pesiod 15 days. Noresponseisa
deemed refusal.
x
Whether particular buildings may be’ | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
occupied for residential purposes referral to the local government as the concurrence agency.
For more information, g0 to schedule 2 table 4 of the
IP Requlation, oo
Assessment period 15 days. No response isa
deemed refusal. «
Design and siting 17, An application may trigger referral to the local government as the concurrence agency if the building work
For more Information go wgchecle 2 table 1of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
{P Regulation. * : 18. An application may trigger referral to the local government as the concurrence agency if the building work
Assessment period 5 days. No sponse is a does not comply with the qualitative statement for building clearance and site cover.
deemed refusal, "9 8k. 19. An application may trigger referral to the locat government as the concurrence agency if the building work
vee does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
L wl Development Code, part 11 or 12.
Fire safety in particular budget 20. An application may trigger referral fo the local government as the concurrence agency to determine the
accommodation bulldings building will comply with the fire safety standard under the Building Act 1975 when the building work has
For more information go to schedule 2 table 1 of the been completed.
{ n 90 to senec
Assessment period 15 days. No response isa
deemed refusal. . ,
Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the
services building work
For more information go to schedule 2 table 1 of the * — complies with the performance criteria of the Queensland Development code part 15; and
IP Requlation and the QDC part 15, © « the work does not comply with an acceptable solution stated in the part.
Assessment period 15 days, No response i a .
deemed refusall, ? ”
Building work for residential service | 22, An application for building work for premises in which residential care service under the Residential
For more information goto schedule 2 table 4 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
{P Requlation and the QC part 20. referral to the local government as the concurrence agency.
Assessment period 18 days, No response is a.
deemed refusal, * a
Building work for removal or 4 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
rebuilding : referral to the local government as the concurrence agency.
for more information go to schedule 2 tate i of the
! lation,
Assessment period § days. Noresponselia
deemed refusal. = * “ t .
Building work for rainwater tank in | 24. An application may trigger referral to the local government as the concurrence agency to determine if the
building work or structure complies with the relevant performance criteria if -
* Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and
« Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria.
Page 16
Page 24
' a Page 1 of 1 PSCEIVE lan Mitchell 15 MAY 2007 " =) From: lan Mitchell [[email protected]] Sent: Sunday, 13 May 2007 4:45 PM To: ‘Shane McGowan’ Ce: ‘John Braddock’ Subject: Braddock House Wavecrest Drive 1 Attachments: 070514Planning Report.pdf; Site _Colour copy, jpg; Elevations1_Colour copy. jpg; Elevations2_colour , copy jpg; First_Colour copy.jpg; Ground Colour copy.jpg Shane, [tis some time since we Corresponded on this and it was in my court to provide you with further information regarding the application. We have developed the design significantly in the interim Period and can now illustrate the in much more detail the relationship of the house to the site levels and to the height limit imposed by the Code. “ attached a revised Planning report and drawings. | have also post hard copies to you today. You have the forms signed by John Braddock already,, | think this should provide a very clear picture for assessment. Of particular note is the impact on the street, which is less than the existing house; the degree of setback to those areas of the elevations which exceed the limit, particularly on the south side and the footprint which is under the allowable site coverage by more than 25%. . Please contact me if you require further information or clarification, regards IAN MITCHELL FRAIA ARCHITECT MITCHELLDESIGN T 07 3378 5185 F 07 3378 5181 07 512 807 e’[email protected]. au Disclaimer Please consider the environment before you print this e-mail or any attachments. 13/05/2007
Page 25
IAN MITCHELL FRAIA P 141 CHAPEL HILL RD CHAPEL HILL Q 4069 T 07 3378 5185 F 07 3378 5181 M 0407 512 807, e [email protected] MITCHELLDESIGN ASSOCIATES PTY LIMITED ATF FOR THE MITCHELL FAMILY TRUST Development Application Report For Code Assessable House at 51 Wavecrest Drive, Castaways Beach; REPORT 2604.1 March 07 MITCHELLDESIGN 15 MAY 2007 t i 4
Page 26
MITCHELLDESIGN
INTRODUCTION
This report is provided in support of an application by John Braddock to remove/demolish an existing multi-level house on a site at 51 Wavecrest
Drive, Castaways Beach, described as Lot122 on MCH 807481Origina! Lot 65 Parish of Weyba, County of March and to construct a new two
storied house.
Context
The site in a suburban street of Noosa, is on a ridge with views to the south-east and to the west. It is in a street of established houses and abuts an
existing two storied house to the south and vacant land to the north. The east elevation is to the street while the west is to a reserve.
THE PROPOSAL
. The proposal is described by drawings and this report and is submitted with the required forms.
Zoning
Eastern Beaches South (Detached Housing Code applies)
Detached Housing Code
The Noosa Plan makes building works code assessable if the works encroach into required building setbacks or height as set out in Schedule 1.
The following table sets out the relationship of the proposed dwelling with the requirements of the Code
Requirement
6m clear of front boundary
1.5m (4.5m high) or 2m (7.5m high) to side and rear boundaries
600mm minimum overhang to entire perimeter of building
Response
Requirement met
Requirement exceeded
Generally as shown. Provided to all walls with
openings
2 storeys with undercroft areas enclosed to meet
bushfire requirements. These areas are proposed to
be used for rainwater storage tanks.
8m (2storeys) at any point above natural ground.
The proposed house exceeds the height limit on
some elevations as shown, as a result of topography
Roof Pitch
| Site Cover
5 degrees
40% for two storeys
5 degrees
36%.
Page 27
MITCHELLDESIGN
The major issue is the building height which, given the brief requirements and the nature of the terrain is more or less impossible to deal with.
The house is proposed as a retirement dwelling for a middle aged couple who as far as possible wish to provide for accessibility without the use of
stairs. Provision for a lift has been made in the design and at least one of the bathrooms and the Kitchen will be designed to be converted readily for
use by a wheelchair user.
The height indicated is compared with the interpretation of the original natural ground level as provided by Donald Coulston Surveyor although there
is little difference between the original and current levels. There is an existing house on the site which breaches the height limit at the front and also
at the rear. The proposed house has a similar situation.
The elevations of the proposed house have the following relationship to the 80000mm limit:
Elevation
Percentage of wall in
excess of 8000 mm limit
Less than 1%
That portion exceeding the limit is towards the rear and is a function of the
steep topography. It is set back 12 000mm from the street
This elevation is set back 12000mm from the street (see above) and therefore
does not interfere with the access to north-east aspect to the house on the
south side,
The house is angled to and stepped back from the boundary, and the nearest
point of the wall exceeds the minimum clearance required by the Code and the
setback exceeds the requirement by up to a metre.
‘It does not overlook the neighbouring house which is screened by large trees.
There is no interference with views.
Refer to the streetscape photographs.
This has no impact on neighbours.
The intrusion on the limit is at the rear and results from the topography. Most of
the elevation is set back more that a metre above the Code requirement.
East (Street)
| _
8%
West
Page 28
MITCHELLDESIGN Demolition of the Existing House The existing house is to be demolished. Its adaptation has been investigated but its layout, its condition and the general quality of its construction is neither suitable to clients’ needs nor readily or for that matter economically adaptable. The specific difficulties are the number of ievels and the planning of intemal spaces which do not allow the provision for adaptability possible. Removal is currently being investigated although preliminary advice indicates that this is difficult for the sorts of reasons which make it impossible to adapt. Advice obtained by the client indicates that a significant proportion of the material and fittings in the house is likely to be able to be recycled. Overlays The Noosa Plan identifies that the property does not trigger Biodiversity (environmental protection) or Natural Resources (coastal protection) Overlays. The Natural Hazard Overlay, however, determines that the property lies within a Medium Bushfire Hazard Area. The Building Code of Australia contains provisions applying to building in bushfire prone areas. Building certification will require that the building be constructed to reduce ember attack. To comply with AS3959-1999, the use of fire retardant building materials, door seals, ridge seals, sealed roof/wall junctions and screened window openings, vents and weepholes may need to be provided. : This will be addressed in the next stage of design Rainwater Tanks . Map 1 of Schedule 8 determines that the property is sited within a rainwater tank area (3000litres). User Guide 23 states that “if a property is tocated in a Bushfire Hazard Area a requirement to provide a rainwater tank (5000 litres) accessible for the purposes of fire fighting. (Note that a filled swimming pool does not satisfy this requirement). The tank must therefore be compatible with local fire service requirements’. The relationship of the proposed house to the topography will result in significant areas of undercroft which will provide accommodation for rainwater storage tanks. . : me
Page 29
MITCHELLDESIGN This will be provided for in the next stage of design DRAWINGS AND IMAGES Drawings and images follow which show the proposal and the site in its context. It is clear that the mass of the house on the street will be similar to the existing house. The design intent is to produce a house which is in keeping with the context, using appropriate materials and of a scale which relates to the surrounding dwellings
Page 30
MITCHELLDESIGN Views up the street View of site: Existing House
Page 31
}98)S 84] UMOp Smal, NOISSCTISHOLIN
Page 32
}9ayjs UMOp ay!Isoddo }@ayjs dn apis aysoddo NOISSCTISHOLIN
Page 33
}9au}S UMOP a}ISoddO NOISSCTISHOLIN
Page 34
Page 35
NV1d ALIS 20.998m 16565210" AUGAMENT WAVECREST DRIVE parworn 2781 WEL OT __ 40014 GNNOYS esnoy Buysixe 0} diysuonejes Bumoys NOILVA313 LSSULS /LSVa FOWRINS INUSKF ager
Page 36
= Ga — vosz $020 00K 2 = Ts 4yOoTd annous syo0davea a
Page 37
Page 38
z Q Ee s a = m | ie a Wi =
Page 39
HEIGHT LIMIT PROPOSED HOUSE
EXTG HOUSE SHADED
20 —~
a EXISTING SURFACE
200s INTERPRETATION
190 OF NATURAL GROUND LINE
e EAST/ STREET ELEVATION
Showing relationship to existing house
GROUND FLOOR
30.
INGNNOTIY .01,Z5PG91 WAS6'02
SITE PLAN
EE
29.114m 81446'50" AUGNMENT
ANBINNSTY ,O£PE9 “900'"Z
SAIC LSSYOSAVM
MITCHELL DESIGN
ARCHITECTURE 141 GHPEL HL RD
INTERIORS 07 SUM S188
URBAN DESIGN — gy g7 3378 5181
MASTER PLANNING [email protected]
PROJECT
HOUSE
WAVECREST DRIVE
CASTAWAYS BEACH
BRADDOCKS
mE
SITING
18 No
1:100 0705 2604
eae Oreo O96 No
IM $1
Page 40
NORTH ELEVATION WEST ELEVATION i il 15 MAY 2307 a Bees MITCHELL DESIGN MASTER PLANNING [email protected] FOUSE WAVECREAST DRIVE CAST ‘AWAYS BEACH BRADDOCKS ELEVATIONS OWE 1:100__0705 2604 am CEO ONG No IM $5
Page 41
GARAGE/WORKSHOP Water tanks under \ WAVECREST DRIVE peeing } 15 MAY 2297 BY fixnecnsanecenexes wee WAVECREST DRIVE _») CASTAWAYS BEACH | ao BRADDOCKS mE GROUND FLOOR ‘AE owe 2B he om Of OE Ne IM $2
Page 42
‘PROJECT HOUSE WAVECREAST DRIVE | BRADDOCKS ™E FIRST FLOOR SCE OWE 508 No 1:100___0705 2604 ORAN CECED OG No IM $3
Page 43
EXISTINGJGROUND NORTH ELEVATION & oe hee ata :\GHT LIMIT — ——= | 7 pala i | See EXISTING: GROUND : 4 WEST ELEVATION FOUSE WAVECREAST DRIVE : CASTAWAYS BEACH BRADDOCKS mE ELEVATIONS 1:100__0705 2604 om Cee OG He IM S4
Page 44
a6n oo. . LAND USE SECTION FEES
non NOOSA
. RECEIPT TYPE
SALE OF DOCUMENTS , .
Superseded Planning Scheme‘ Documentation . 520
Copy of Permit/Approval Letter : 110
. The Noosa Plan Documentation 111
¢ . -_
APPLICATION FEES
, Material Change.of Use -Cogellmpact /
Corfsistert S75. 00 . 527
Inconsistent 521
- Assessment under Superseded Planning Scheme . 521
Modification to a Development Permit - . 521
Extension of a Currency Period : §21
Operational Works - Landscaping . §21
e@ Bldg Work assessable against the Planning Scheme - §21
PRE LODGEMENT REVIEW
Haif'Hour §22
One Hour . 522
ADVERTISING
: Purchase Advertised Applications : 523
JETTIES © .
Jetty Application Fee 524
~ Jetty Bond 51
/ (Category 4)
BONDS
Performance Bond : . . |
(Category 9)
SIGNS , : : .
Registration Fee , : : a - 222
sei FEE /
Search of Land Use Section file 112
Liquor Licensing Request : 113 .
_ “TOTAL. $ S7f_0U
GM lertfratnen Wow 4 LFA coe
NAME: éf- Dohrn Braddock
ADDRESS: 77 alta Aven
Holland fark 4&0 #41.
FILENO: L007 { 6 6 DATE: 74 -£-07
RECEIPT NO: | 28944 14 Signature of TP Officer: / 4
AUTHORITY NO:
13/ 2007/ 966 /1
Page 45
CALCULATION OF FEES
APPLICATION
FEE
TOTAL
FEES
MCU - CODE ASSESSMENT
_{Details of Development
Consistent 1.0
Inconsistent 3.0
FEE CALCULATION
MCU - IMPACT ASSESSMENT
Details of Development
Consistent 1.0
‘IInconsistent 3.0
FEE CALCULATION
OPERATIONAL WORKS
Details of Development
FEE CALCULATION
TOTAL FEES
Used in these records
07/0965 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.