Council archive · source document
07/0965 - MCU - Detached House [As Published] · 132007.965
INTEGRATED PLANNING ACT 1997 ' Operational work that is tidal work or work in,coastal management district : For more information refer to Guide 18. For , more information about prescribed tidal work in local government tidal areas refer to Guide 24. Unless you answered "none of the above" to Q9, the application requires assessment by the * Environmentat Protection Agen: cy (EPA). if an agency other than EPA is the assessment manager for the application, EPA is a concurrence agency for the apptication in relation to this matter. Local government is the assessment Manager for all preserbed tidal work. ~ Operational work below “igh water mark For more information refer to Guide 18. For more information about prescribed tidal work in local government tidal areas refer to Guide 24, Unless you' answered ‘none of the above” to Q10, the application triggers referral to. Qld) as a Concurrence agency. Local government is the assessment manager for all prescribed tidal work, * | f Coastal management For mare information refer t Guide 18. Unless you answered “none of the above” to Q11, the application requires assessment by the Environmental Protection. Agency (EPA). if an agency other than EPA is the assessment | manager for the application, EPA is a concurrence agency for the application i in felation to this matter, . 10 Tidat work is defined in sch 10 of the IPA. 9. IDAS Assessment Checklist, Version 20, 2 April 2007 The application involves operational work that is: (tick the applicable box/es) (1 (i) tidal work'® as defined under the Coastal Protection and Management Act 1995 (the Coastal Act) that is not prescribed tidal work - complete Part M of Form 1, of O (ii) tidal work that is prescribed tidal work"' other than in a canal’? -complete Part P of Form 1; or (ii) cared out within a coastal management district under the Coastal Act and for - complete Part Mof Form 1 if any box/es (a) to () below are ticked, (1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie. other than those works in tidal water) where the development has been determined not to be assessable against the Water Act 2000 ; C1 (b) constructing a canal intended to be connected to tidal waters; [1 ©) constructing an artificial waterway; Ld) reclaiming land under tidal water; Le) disposing of dredge spoil or other solid waste material in tidal water; C1 (f) interfering with quarry material on State coastal land above high-water mark; (1g) draining or allowing drainage or flow of water or other matter across State coastal land above high-water mark; [1 (hb) removing or interfering with coastal dunes on land, other than State coastal land, that is in an erosion prone area and above high-water mark; (1 (i) constricting a bank or bund wall to establish a ponded pasture on land, other than State coastal land, above high-water mark; or f (iv) _none of the above. 10. The application involves operational work that is: ( tick the applicable box/es) (i) tidal work' as defined under the Coastal Protection and Management Act 1995 (the Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 4; or C1 (i) tidal work that is prescribed tidal work" - complete Part P of Form 1; of C1 (ii) carried out within a coastal management district's under the Coastal Act and for - (1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part M of Form 1; (1 () rectaiming land under tidal water - complete Part M of Form 1; or (1 (©) constructing a canal, if the canal is associated with reconfiguring a lot - complete Part M of Form 1; (iv) none of th the above, 11. The application involves: (tick the applicable box/es) (] (i) a material change of use assessable under a planning scheme involving operational work cartied out completely or partly in a coastal management district CO (ii) a material change of use assessable under a planning scheme involving building work, carried out completely or partly in a coastal management district that is ~ « the construction of a new premises with a GFA'® of at least 1000m2 « the enlargement of the GFA of existing premises by more than 1000m? Di iii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated completely or partly in a coastal management district [1 Qf) reconfiguring a lot'’ assessable under schedule 8 of the IPA and in connection with the construction of a canal — complete Part M of Form 1 fi (v) _none of the above _ 14 Prescribed tidal work Is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or party within a local government tidal area, 12 Canal means canal as defined under the Coastal Protection and Management Act 1995 13 Tidal work is defined in sch 10 of the IPA. 14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal araa. 15 Coastal management district is defined in sch 10 of the (PA and means a coastal management district under the Coastal Protection and Management Act 1996, other than an area declared as a coastal management distict under section 47(2) of that Act 16 GFA Is defined in sch 14 of the IPA to mean the gross floor area, For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed. 17 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificia! waterway, must be accompanied by the application for the operational works to construct the arlificial waterway. Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0965 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.