Council archive · source document
07/0965 - MCU - Detached House [As Published] · 132007.965
INTEGRATED PLANNING ACT 1997
; !ntegration of land use and public
transport .
For more information refer to Guide 23, schedule
8A of the PA, & schedule 2 of the IP Regulation,
Unless you answered ‘none of the above’, the
_ | apptication triggers raferrat to OT as a
concurrence agency.
22,
IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves: (tick the applicable box/es)—
LC (ia material change of use assessable against the planning scheme for a purpose
mentioried in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
LD (ii) reconfiguring a fot—
(J (a) on land that is completely or partly within a public transport corridor, and the
total number of lots increases;
(1(b) _ onland that is completely or partly within a future public transport corridor or
an airport's public safety area;
C1 (6) _ on lan that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
(1 (¢) fora residential purpose within the 25 ANEF contour for an airport;
(Ce) for a residential purpose resulting in 100 or more allotments.
C1 (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
Railway safety and efficiency
For more information refer to Guide 23, schedule
8A of the IPA & schedule 2 of the IP Requlation.
Unless you answered “none of the above’, the
apptication triggers referral to QT-as a
concurrence agency.» 1
Moonie to Brisbane pipeline’,
For mora inforration refer to schedute 2of the (P
Regutation. * .
Unless you answered “sone of the above’, the
application triggers referral to the holder of
pipeline Ecence No 1 issued under the Petroleum
Act 1923, currently Santos QNT Pty Ltd, for
advice.
23.
24.
above, on land that—
C1 (a) _ is completely or partly within a public transport corridor or a future public
transport corridor,
{J (b) will result in work that encroaches into an airport's operational airspace.
none of the above.
The application involves: (tick the applicable box/es})~ .
(C1 () a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.
D Gi) reconfiguring a fot—
L1@)__ onland that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
(1 (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater,
[1 (c) _ ontand that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
[1 @) __ onland that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
(1 (e) _ onland that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
CJ (f for a residential purpose resulting in 100 or more allotments.
CO (il) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m?, on land that—
C1 (a) _ is compietely or partly within rail corridor land or commercial corridor and, and
the work is not for rail transport infrastructure or other rail infrastructure;
(1 (b) _ is completely or partly within future railway land, or a railway tunnel easement;
Lic) abuts rail corridor !and, commercial corridor land or future railway land, and
, the work is within 25m of the railway boundary.
(iv) none of the above.
The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
C1 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.
LC (ii) reconfiguring a lot
LO (iiYoperational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
(iv) none of the above.
Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0965 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.