Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Revised DA Form 1 (received 15.8.2024) - 3 Werin Street Tewantin

of 12

Page text shows just the words. Original shows the document exactly as it was published.

  10) Subdivision
  10.1) For this development, how many lots are being created and what is the intended use of those lots:
  Intended use of lots created               Residential              Commercial              Industrial              Other, please specify:


  Number of lots created                     2

  10.2) Will the subdivision be staged?
     Yes – provide additional details below
  x No
  How many stages will the works include?
  What stage(s) will this development application
  apply to?

  11) Dividing land into parts by agreement – how many parts are being created and what is the intended use of the
      parts?
  Intended use of parts created              Residential              Commercial              Industrial              Other, please specify:


  Number of parts created

  12) Boundary realignment
  12.1) What are the current and proposed areas for each lot comprising the premises?
                                Current lot                                                                Proposed lot
  Lot on plan description               Area (m2)                             Lot on plan description              Area (m2)



  12.2) What is the reason for the boundary realignment?



  13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
  (attach schedule if there are more than two easements)
  Existing or                Width (m)        Length (m)       Purpose of the easement? (e.g.                     Identify the land/lot(s)
  proposed?                                                    pedestrian access)                                 benefitted by the easement




Division 3 – Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
  14.1) What is the nature of the operational work?
     Road work                                             x Stormwater                               Water infrastructure
  x Drainage work                                          x Earthworks                               Sewage infrastructure
  x Landscaping                                               Signage                                 Clearing vegetation
      Other – please specify:
  14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
  x Yes – specify number of new lots:                      CTS 3 lots
      No
Log in to download the original file

Revised DA Form 1 (received 15.8.2024) - 3 Werin Street Tewantin.pdf · 293 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.