5.2.3.3 Mechanical Plant
Assessment of mechanical plant is pursuant to the noise requirements of EPP 2008 Background
Creep (steady-state).
As per Council’s information request, mechanical plant noise impacts associated with the IGA
loading area and the 7/11 fronting Noosa Drive were calculated to the proposed onsite residential
receiver 3.
Table 14 presents the predicted mechanical plant noise levels impacts associated with the IGA
and the 7/11. Predictions are based on actual noise measurements conducted by TTM.
Table 13: IGA and 7/11 Mechanical Plant Noise Predictions
Complies with EPP2008 Background Creep
Predicted Noise Day (7am – Evening (6pm – Night (10pm -
Receiver Noise Source
Level, L90 dB(A) 6pm) 10pm) 7am)
46 dB(A) L90 40 dB(A) L90 37 dB(A) L90
IGA rooftop
45* Yes No No
plant
3
7/11 rooftop
40* Yes Yes No
plant
*includes 5 dB(A) adjustment to account for tonal noise characteristics in accordance with AS1055.
Mechanical plant noise levels are predicted to be above the criteria during the evening and night
time periods at the proposed on-site receiver (Receiver 3). As the building is a part of the
proposed development, building treatments will be specified to ensure that internal noise levels
comply with the requirements.
www.ttmgroup.com.au
T: 07 5514 8000 F: 07 5514 8144 E: [email protected] Page 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.