Skip to the record
For the highest quality transcripts.

Council archive · source document

old approval · 131999.982857.1

of 12

Text shows just the words. Original shows the document exactly as it was published.

                                                                                                3

          Town Planning

3         Development undertaken in accordance with this approval must generally comply with
          the approved plans of development. The approved plans are numbered 9970-1 to 8
          prepared by Greg Gibbs Architects and dated June 1999 and as may be amended by
          these conditions.

4         Existing trees on the site and within road reserves are to be retained, except where
          required to be removed due to building operations or the conduct of the approved use.

5         The developer must submit security in the form of a cash bond or trading bank
          guarantee to the sum of $1000 to secure performance of all conditions of this approval,
          prior to the issue of a Development Permit for building works. The cash bond or
          trading bank guarantee will be returned on performance of the conditions of approval
          less any costs incurred by Council in respect of enforcing performance of this permit.

6         The requirements of this development approval are to be effected, prior to the use of
          the premises. Council reserves the right to call upon the bond or guaranteed sum
          referred to in this approval to effect compliance with conditions.

7         This Development Permit for a material change of use of premises lapses if:-

          7.1       the use or erection of a building or other structure associated with the use, has
                    not been commenced within four (4) years of the date of issue of the
                    Development Permit, unless application is made and approved by Council for
                    an extension; or

          7.2       the use of any premises pursuant to the Development Permit ceases.

8         Prior to the commencement of development, the developer must obtain a Development
          Permit for building works.
Departments Consulted :

□    Administration
                            □       Finance
                                                 □   Engineering
                                                                     □      Town Planning



□    Building
                            □       Health
                                                 □   Legal
                                                                     □      Environment




AOP-3 c:\prod\word\doc\reports\l 7603da-rs.doc                         19/08/99

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

old approval.pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.