Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Vehicle_Crossover_FACT_SHEET_PACK_REVISED

From the archive 202300 documents.zip, inside Non-Standard Crossover application - 498 Cooroy Mountain Road Cooroy Mountain. File date in the archive: 2023-02-21 11:43.

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                               FACT SHEET
                                                         General information on construction and maintenance of a
                                                          compliant Vehicle Crossover on Council Controlled Land



General Information on the Construction and Maintenance of
Vehicle Crossovers on Council Controlled Land
If you are considering construction of a                    Will Council construct my crossover?
vehicle crossover in the road reserve you
may be required to apply to council for                     No. Council does not construct crossovers in
approval.                                                   our road reserve but we do ensure there is an
                                                            opportunity for each property owner to have at
Construction includes any new crossover or                  least one crossover approved by Council.
modification or alterations to your existing
crossover where you are changing the profile,               Can I construct my own crossover?
surface, dimension or materials. Basic
maintenance or upkeep such as repairing                     Yes, you can construct your own crossover to
cracks or mowing the crossover area does not                council’s engineering standards. Alternatively,
require council approval.                                   you can engage the services of a licensed
                                                            contractor to do the work for you.
The following information may assist you in
understanding council’s position regarding                  What does standard mean?
vehicle crossovers on land we control.
                                                            Standard means your crossover is self
What is a vehicle crossover?                                assessable against Council requirements. The
                                                            self assessment process is designed to ensure
A vehicle crossover is the portion of your                  crossover construction will not have a negative
driveway from your property boundary to the                 impact on the environment, Council’s
end of the road or kerb and channel (i.e. on                infrastructure or the community.
council controlled land). The crossover
includes all pipes, kerbing and any other works             How do I know if my crossover plans
undertaken as part of the construction.                     are standard?
Do I require approval to construct a                        Refer to the Vehicle Crossover Checklist. If you
crossover?                                                  answer ‘no’ to any of the questions your
                                                            crossover is nonstandard and therefore not self-
There are two possible options for construction             assessable. In this instance you must apply for a
of your driveway which can be determined in                 Non Standard Crossover / Operational Works
the self-assessment information attached to                 approval through Council’s Planning Department.
this Fact Sheet:

Standard crossover – No permit required

Non-standard crossover – Council approval
required

What if my crossover is from a State
Controlled road?
If access to your property is from a Queensland
Government controlled road, you will require
approval from the Department of Transport and
Main Roads to complete your crossover
construction. Council cannot approve your
construction. Visit www.transport.qld.gov.au for
more information.


      T (07) 5329 6500 | F (07) 5329 6501 | ABN: 97 969 214 121 | www.noosa.qld.gov.au | [email protected]
          Postal address: PO Box 141 Tewantin QLD 4565 | Tewantin office: 9 Pelican Street Tewantin QLD 4565
Log in to download the original file

Vehicle_Crossover_FACT_SHEET_PACK_REVISED.pdf · 910 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 11 pages

Page 2

What are my responsibilities?                               What if I can’t comply with the
                                                            standard requirements?
The property owner/s is wholly responsible for
(including costs of):                                       Crossovers that cannot be constructed in
                                                            accordance with council’s standard conditions
    1. the construction of the crossover; and               will need to have an Operational Works
                                                            approval.
    2. the maintenance of the crossover.
                                                            Operational Works approvals may be subject to
Any modification to the kerb and channel is                 obtaining approvals under the planning
considered to be part of the construction of the            scheme.
crossover and therefore is the responsibility of
the property owner/s.                                       How do I apply for an Operational
Council takes no responsibility for any public              Works approval?
liability injury or property damage caused by
                                                            Complete DA Form 1 – Development
you carrying out work in the road reserve
                                                            Application Details and forward to Council.
(footpath).

What are the acceptable standards                           What if there is a tree, infrastructure
for a crossover?                                            or utility service in the way?
                                                            If there are vegetation, infrastructure or utility
To be classed as a standard crossover it must be
                                                            services in the proposed crossover area, you
constructed in accordance with the appropriate
                                                            will be required to obtain an Operational Works
standard drawing – RS-049 and RS-050
                                                            approval. You should plan the location of your
(residential) and RS-056 (rural) and/or Addendum
                                                            crossover according to the required setbacks
RS-056.1 for a rural driveway concrete surface
                                                            and clear of any utility service where possible.
alternative.
                                                            Significant trees, traffic islands and storm water
In accordance with the standard drawings, your              pits cannot normally be moved to suit
crossover should be finished with a non-slip                crossovers. If approval is granted, the cost of
surface and be able to withstand loading from               any remedial works will be at the property
intended vehicles.                                          owners’ expense. Council may grant permission
                                                            for the removal of some street trees upon
How do I determine whether my                               assessment to construct an approved
property is located in a rural or urban                     crossover.
area?                                                       Who will maintain my crossover?
If you are unsure about which standard                      Maintenance of a crossover is the sole
drawings apply to you, please refer to the                  responsibility of the property owner. The
planning scheme to determine whether your                   maintenance requirements are a standard
property is located in a rural or urban area.               condition of any crossover approval. Council
                                                            will not maintain crossovers and may require
                                                            that a property owner undertake works to
                                                            improve their crossover/asset or risk having it
                                                            removed. This position is consistent with other
                                                            councils and the State Government.




      T (07) 5329 6500 | F (07) 5329 6501 | ABN: 97 969 214 121 | www.noosa.qld.gov.au | [email protected]
          Postal address: PO Box 141 Tewantin QLD 4565 | Tewantin office: 9 Pelican Street Tewantin QLD 4565

Page 3

What if council or a public utility
company damage or remove my
crossover?
If council or a public utility company damage or
remove any part of your crossover, there is no
expectation or requirement that they reinstate
the crossover as constructed. Where the
crossover construction is to a higher standard
or non-standard, council or the public utility will
look to reinstate the crossover to a design
compliant with the standard drawings.

What forms do I use?
Complete the Vehicle Crossover Checklist to
determine if your vehicle crossover is:

1.   Standard (read the Standard Vehicle
     Crossover Fact Sheet to determine if your
     proposed crossover is considered standard
     and no approval permit is required), or

2.   Non Standard (seek an Operational
     Works approval by completing DA Form
     1 – Development Application Details).

Further information
For further information regarding standard and
non-standard crossovers, please contact
Councils Customer Service on 07 5329 6500.




      T (07) 5329 6500 | F (07) 5329 6501 | ABN: 97 969 214 121 | www.noosa.qld.gov.au | [email protected]
          Postal address: PO Box 141 Tewantin QLD 4565 | Tewantin office: 9 Pelican Street Tewantin QLD 4565

Page 4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Seas ra
@ 40 | N¥id EE rr]
SONIMVEC GYVONVLS otra | 91790 1a
6vO-Sd SAWMAARG “WHNGOISSS VISVIVLLSNY ONISIENIONS SYYOM OMENd 40 AUNLUSNI
SAVMAAING
“youreg ayoudosddo ay; Aq paydopo useq soy Buymoup 94; yoy} w4UCD [JOYS 49En oYy2 “3SN FYOIIE
siouneg Sulpdiowipd ay; ueemyeq Uokbi|nsuoD ul pedojassp ueeq aby sbulwbup asey]
SNOLWOOT GALISIHOYd AVMSAING SINAWFINOTY LNOLS
"950-S¥ UO Ez ayou sayas
yyed ayauouos aunyng/ Sul,
Saaaany TAT aaa ‘uol4y9N44Sua3 Guyssou3 04 sod
SSIOO¥ OLOITIOD eee eee oe causes swuuey pu amy so pea yo
\ DOs JPAOWSJ UEA}I MO}]E OY yNIKES
wo’ uo'9 /
1 yybua,_ uontsups
TT a V/ [- [paaA xD QOg
IN IN
a
pbol ulpw 40 duljanueg UbIPaN oso-syuaquousumeyp = | LN = tts
w9'3 wa'9 wor x can Uo gry SUOLIAS Jayay 2
HH HH He —H-- g \ E
“OSO-SY YY Yol}oUN!UOD = = i = Is <
a ad MN a ul popes aq op Suimoup siyp °Z ia 3 | ~ = - v
de P a n of dl s dl ‘shDMAALIP JO, paAxow aq yOu 3 i Ss
3 5. 5 Im ouMyWINy pod w® SoolMas “1 & i
zt | |e 2 SIN | pe Ts
ti = lS
@ le als
0uDIDa|9 Wg" | . 5/2 [ he
seomep - Taepunog Aqradoig } |
oe coo = juawuSye a5ese6 3jSus sot}
0 . 3 G90-SH 9} Jeyau yPuueYy pue quay
38 Abafp WO"| a julof Uolsuedx> payjanog. aay

 

Avg yandina joaidéy

 

YUL qiay 4azDMUEYS,

wyed soe Banyng/Suyysiea

|e DoOY 1eveUeH

 

 

 

 

 

 

 

 

 

wo'0zZ uUbY; Jayoelb
‘sbulssola Usemyaq wig’y Ulu wos Wo'r ulg’s z @bpyuody yylm xajdng 9 2
$89] 10 W'OZ c
“pod paplalpun UD UO aul] wo'9 wo'p wos L abpyuowy ym xajdng S as
IN poo apis ayy yo uonobuojoid
i i is son) wal
UIDW a4} 40 UORISUezUI a4} 3D JO Ipaouddp e6papb/yodins 0} Yoalqns wo'9 wo'y wos Il oe fs 5 '
‘pbod paplAlp P UO ubIpau ayy ID Jo obpIpH aiqnog 2
Joye GD x, pax spuiod ayy x “sbulsso1o OM) U@@MYoq UIQ'Z| UI “Z 3
0682 S¥ vO pasoq ‘ouy ArDoy tobpyuoy WOO UW “| wos wore wor z asoul 40 a6piv6 ajqnog | ¢ in
D Ul UMOYS SUOIZD90] Pazqiyosd ulg’s woe ulo'+ L ajow Jo ebpup6 ajqnog Zz 3
DAN Yo yulod juoGuDL oe ai woe woe wor L abpun6 ajiug L m
(q424 40 3903)
ea ey ppararoy TN (rprouddo ssvenrog i SONISSOXO
[ounos yupaajes 0, yoe!gns sXpmeauip jy) aM " NOILdI4OSAG ddAL
AINAdOud L¥ aya Ly JO ON
(SNOWWOO7 GALIBIHONd A¥MaALNG) FIG¥INdd¥ SNOLIGNOD TWIddeS HIGIN xDuL lai xbw | slayMoTI¥

 

 

 

 

 

 

 

ON39F1

 

SAWMAAING TWILNSGISSY 4O HLGIM ONY SASWAN FISYMOTIV

 

 

 

 

Page 5

 

Z 40 Z NVId
SAVNGANNG “WILNAGISay
SAVMAAG

0SO-SY

eee)

 

 

 

SONIMVE CYVONVLS
VISVTVUISNY ONIMZANIONA SHYOM ONENd 40 AINLUSNI

 

 

 

 

 

 

 

 

“aSIMJSY}O UMOYS SS3|UN SajSUUIIIW Ul BJD SUOISUBWUIP [ly “9Z
“sajolyar 40) aaubsDalo
mm |IouNo) yUDAGIaI ‘x%E

 

Asoy0jsiyos aunsua 0} paubisep—ai 3q 0} specu ADmeaup

 

apioap

 

 

Spaaoxe ||P} SSO19 4) “*payx2a49 oq 0) AdmarLIP ay} 0} YUooD[pD UaWaADd Bulysixa yo JDJ sso1gQ “/Z
“BhO-SY YUM uoNoUN{uoD UI poss aq oO} Bulmoig “gz
‘youmo Ayadold ayy Jo Ayliqisuodses ayy oud sbulsso1d oy) yo aounuauIDy “GZ
“a3219U02 40 juauseon|d 0; soud jounoo
qupaajad ayy Aq parouddp pup paysadsul pup aonjd ul aq jjpys JuaWediojulal pub YIOMUMIO4 “bz
“$90-SY 4ajeu “uonDayIoeds
SIBINJODINUDW BY) 0} yUDJpas Hulud yas shjnpows Mo] D YY paldas eq oy a4D syulo! JoNUOg “EZ

 

 

 

 

“OGZ o1qG0} doj ‘4aAco abpa pun doz QS ‘pO] S¥ 0} OUD} yuewarEjUIay ZZ
‘POI 9Y819U09 ‘ODE Sy JO SwwaulouInbas ay YrIM AIduoD 0} UOKINASUOD a¥a!2U09 “|Z
“OO9E S¥ PUD GAEL S¥ YW soUDpI0I90 UL ZEN aposH wnuUU aq 0} ayIDU09 “OZ
"SUOIIAS BBW ¢ FEAL, ‘aq 02 BoUDJA/O} e2DjNS 99/909 “~G|
‘jupjpas oupyounfjod ajqouns © YyyM yuIof Jo e20yINS JD9S “sUORIMAYSU) S¥oANJODJNUDWI OY
UO!bI}DySU! ‘paboqyJoo paybjnub4h passedwos peybubssdw} uowNyq yoy, Wug'g Jo ‘(wW/by Os|
— 6g) Wo; ouaAietjod pox) ssos9 a2 pasoj2 yydep jiny yoIYyL WA! aq 0} spuIof uoJsuDdxZ “gy
*SUOSDAJ |DJUBWUOIAUS 0} Np joAoIddd |!9UNCD yuDAaJa 0} yoa/gns Ysiuy eyobeubbo pasodxy
“seoppns unuysapad 40 aounjsisad dis |"|99¢ SZN/S¥ 40 Syuaweunbas ayy yum Ajduos
0} 8/0 SkoMaAUp jo seoDJNs paysiuy |fy “e|youd sooyns paysiuly ay2 UI UORDUDA yydap xoW!
WWg Db aAby op ‘paroiddd aloym “|paoiddd jlounod jubsajed 0} yoalqns alb saIDyNs aAyblovag “f)
“paysiuly woolg Anbay 3q 0} SeoDpNs 3}8/9U09 UID|g “gf
40 epdl6 winuiixpu) pb yD ADMAAUP Mau ©} pauolysuDs, AljbuIpnybuo] eq oy ybd Buysixz “Gy
suonoedsur jounoo 0} soud payin} Ajny pud gy ul | yO apou5 wnuixow
@q 0} S2DpNS |DINYDU oO} Yybd Jo ADMAAIP Jo aGpa Wo SI9YD [IL pub yNO SAAOMYYDJ “pL
“payoodwioos jjam aq ysnw azes9u09 Guluiolpp syiomyyDa yw
“saijoid ab4en pup sApmyybd ayesouoo Buysixs yoypul oy Aupa ADU YApIM au0zZ YW “CL
6¥0-SU
Suympup 4994
@ NOWLO3S

SSIOOW AYMAN TWdOYd WAL

(pasinbau 41)
julof joxuog

  

         

 

 

qojs yodiog
/obping

 

Jepun [joy ra

  

qujof jouuog

jouneg syoudouddo ay} Aq paydopo ussq soy SuMbup ey) yoy UUyUOD YS 48M By, BSN FOIE
“sj!ounog Guypdiouapd sy, uaemyaq uonbynsio> ul pedojarap used eAdy sSuMbip a6ayL

“haps upuysaped

pub eSpulbsp @adj Jo, mold ysnul Aippunog Ayedoid buojp sappsh jpulpnyibue7 ulul gz: 40
apos5 Buyyjoy Jo xow g:| yo apos6 Burs 0 arouddo Anwi jlounog saoupjswinai9 joI9ads Japun
9UNOD yUDAIJe a4} JO |DAoIddD ayy UodN paubA aq ADU yulRSUOD sIyJ “{|pNUDW
abpuipsg ubquA puDjsuseND) “W'G'N'D 40 yUaUledNbad Jod sb aAsasas pbos oy} UlyylM poulpyyod
JaYDMUIOYS adNSUD 0} qa JO PAU! aAogd WUWQGZ Jo yUlod YBIY p aAaYyDD ySNU SADMOALA gs
proud pup ubisep

bulssou9 upjnaiyer ayy ‘sefuer ubisap upqin aAlisuas JayDM Joy
“883990

ApM@ALIP MOYO 0} SPUD|S! DyJP1) Ul sxPeiq aplaosd 40 spuDjs! Syjb4y eYDIoJa4 You jm |louNog
“sbulssos9 sDMIIYEA jo 4D3]9 pe}D20) aq 0} abpuIDUP Ja2DMJoOs payDIOOSso puD syoydopD quey
*sjano|

paysiuy Aomeaup parouddo yo}ow 0} s2pyins yd ‘AomaAUp mau JO DID ay} UIYLIM pauIDUOD
aq 0} alo sud soles Gunsixa ‘paasiyoo aq youund siyy aiaym ‘|oroiddo |Iounog yuDAalas

0} yalgns ‘syd pup sajoyuow ‘sbumy sAUoYyyND e2y~Yas {JD 4O 4DE{9 pazDs0) oq 0} Bulssouy
|lounoo ubasjad

ayy yo jproiddo 02 yoalgns ‘asuadxa ssaumo Apadosd ay} yO payoojas aq AoW yJomadid puo
Id AjnB 943 ‘paraiyao aq youuns siyz asaym “szid Aynb Bunsixa yo sp9j9 paywso] aq o} Bulssosg
‘uolyb90] Gulssos9 b Buloajas ueym spaod Gunpind sApedoid buuunogybieu

pub sJojisia 0} uanlb eq 0} SI UolbJapisuos ‘Bulybd yee.ys a|qbybaD Uo yopdul! eonpal of
jQUNOd jubAs|al Aq paroiddd osimJayjo ssajuM jUauljo|[p Jod payonsysuod eq 0} sse99p ougQ
“Asppunog Aqadoud 03 jauuDyd jo yeaul wos abnjuoy

IM paulDUOD Ajjoym “yUaUJUBI|D yoodys oy} 0} alpnbs payoruysuoo oq 0} Gulssosy
*jorouddo 40g

UNOD YUDAI|Al 0} 49491 ‘aya4IUOD paddOjUlad UDYZ JayJO ‘UOKONAYsUOD Jo, s|DUaybUI aADUIOYY
‘uoiornoxa Aup 0} Joud ‘suolsuaWIp PUD SaYysiuly aoDyINs ‘s[aAa] ‘UOIDI0] ‘s]Da}DW UOILINIzsUOD
‘adf Buissoso Burkyloads ‘Jlounos jupara|ad Wo. peulpyqo eq jsnul syuued aypudouddp jy

 

 

DUNOD YUDAd|ed 0} yoalqns st

 

 

 

 

Ys ay

 

 

 

 

 

S
v
¢

 

 

6p0-SY
6ulmpip 42384
¥ NOLLOAS
AdAL LNONWAYE
sauquso OS ® O1Y

Huo] OOF Slomop Joos
‘Ss3|ulDys /pasiuDAjD9

puog

jeuupyo

pup quay 40 490q
40 |pnowa1 upajd Moy
0} SqJ8y [JO 3nd MDS

  

xDW Qg 4aAD) Burpy

 

  

   

    

 

 

        

 

 

 

 

 

 

 

 

 

 

 

 

00st “yu
uw} ov UL I
9u0Z UIDd uowyisupy, ke
y Zi ayou saya = OOS | ¢| apou Jayas 00S1 iS SoDyNS pooy
qos wodiop | Apa Apu adojs, ulwiggs L
/abping |__ 1840 [oy | | lz
t t t
SB Oost SES ao > 3] (#) TaNWWHO 40
< ao bw © | LwaANI_WO¥d JONWISIC quiof jouyuoy
g & 8 = © | (ww) TaNNWHO 40
5 °
a oe e AMGANL 3AOS¥ LHOISH
< =

 

Yoaul qiay

 

 

 

Page 6

 

EEECERE

9S0-SY

 

 

AWMAAING “Wand
SAVMGAING

SONAVEG GYVONVLS
WISVIVELSNY ONRGSINION SNYOM OMGNd JO JINLLLSNI

 

 

 

 

 

 

 

 

 

 

 

eefoob]

 

Sq aT : 5

 

  

‘THT NT GvOS = NOWIIS AWMGAST “WOIdAL
quasuyUDqUIa BuojD suns 4a}Dm 40
S3SIX@ UIDIP 3[qb2 a1aym paAiND “prone

  

jypunog ayoudoaddo a4) Aq paydopo uaeq soy Guimoup 24; yoy, UUYUOD {JOYS 4esn 24} "3SN BOGE
“siouneg Suypdistund ay) usemyeq Uoybynsuos ul padojasap useq arby sbulmbip asey]

‘aSIMJayJO UMOYS SSa|UN SeouIl|[lul UI a1D SUOISUaUIIP [ly *Z
“UIDIG—A JO yUBWYD}DI Ja}DMUUOYS wDansdn ou SI ayaY} Uaym
JO quawasbds abbUIDIP JO BSINOCD Ja}DM [DUMYDU D oO} PayaIp aq [Das

youd JayOMUUOYs eusym Ayadoud yelgns ayy 0} |jDL

uawinyig 109 Z
Japjnoys pajoas jo abpz

 

 

yu; sa6saA pdos UO paljoysul 3q 0} 2oU asd SbulssouD adi
‘burssou9 adid p 40) uoRoayddo uodn uno90 0}
(aagoquasaudas younog pb Ag) yuawissassD ays ¥ °|

————— SHON

 

 

 

 

 

 

 

 

'~—sannn tw ost" 008

IND WN OVOS — NOLIIS AYMAN “WOT

40009 “ul QOS

 

 

wres ue | poy | oF “yonyno
Fo > 40 jaRNO wos Mo}y
wu wee g a pub jeu! oyu! appub oy
: UIDIP 3g} 40 yWaAU] v
wi9'’S

sy901 OOZe ul

poos uinw ayy Buryoay0 ‘yaqui/yajyno yould auoig

ynoym sseo2p doyeno oy
squana W03s Jebyp] Moyo

     

 

 

 

  

 

wicg"| 246194
4p yo doy

       

 

“UMOYS SP UORDUNOL PDOs ayy Ul
sujpwas duy yyBis ayy eveym ydaoxe
00E 40 souDDa}2 YoUaq/UORDyabaA
ul D aADY |DYs yYBIS Jo aur]

wiy| 2gb!eq
ake suaAug

81D} GSS 0} 4ajo4

 

BoUnysIP WYyBIS 9405

Wd

pboy [puny 5

 

 

 

 

 

 

 

 

 

 

 

 

 

24 yulod mo} 2p919 "aoiapo saauibua Bunjnsuoa yes (Z)
en “awayas BuluuDjg sjunog 30 suoisiaqud
ee ay} JapuN JO johuDW abouIDIg UDG
= pupjsusang) ay} ye suoisiaowd ayy YM
is @OUDPJOIID Ul SUORD|NI}D9 yyM payoddns

8 31 parcuddo aq Anu saapouseyy (|)
ag gz OL IM¥ ‘0002 < 2yjb4) App abpsaap 404
O'S Z ly ‘000Z => 2yyb2 Allpp abbsoap Joj
“2 9IqD) 4
= Yb ubg spoon ue pee (2) 009/Z PHO'G>
We DOI 009/z | szs/z DHO'Y>
blz 06 s7s/Z osr/Z OHO'E>
1@1 08 osr/Z oog DHS'Z>
ISI OL 009 GZS DHS" >
cz 09 Szs OSb DHO"L>
16 0s OSr gue DHS'0>
el Or Ob lv Z IMW | Dady jUaWYyd}09
(uw) aounysig} — (y/u) AZIS 3dld
qBIS 240s | ww paads aE
sounysiq 3YO1S 40S TRO ONIONT 54201

 

 

 

“pauinbas aoupuajuipWw 4Djnbes
qybley ul xpu gog » Ajuo sspub
aq ysnwWi Daud sIy} ul uOoRDIaba/,

2

 

uoRDUJO} ;oUOU
r— 9} 4ayybq 3N9

a2u39_Pooy

 

 

 

ICE \y

aun] jo

   

 

ADMBAU
%
290} GSS 0} seyer

2190} GSS 0} saya1

        

@.43U99

  

3y8is $0 2u] 4

3yBIs yo ]
uw gos: 4

ie

       

 

 
   

    

aybis yo at Fp unbes
:) aoupysip youeq
i youaq op 6
quauyuDquie “b'a }y6is ayonbapp 3954j0 [D1e\Dy 40 HH
uononysgo jo a6p3| 40, sayDq * ¥98]j0 |D19\D7

eounysip yybls eypnbapp

 
 

ano payinbay

 

SOUDYSIP JYBIS ajDS r @SUD}SIP

VUBIS 8]DS ' JO} 42}}0q 3nd pauinbay

ysod aping |

Gige UI
Atbpanoq Ayledolg T T

40} gor i'sort ‘por! s6mq PIS UNL O% Ja¥0y
“Bu0Z Y/WYOD| Joy abpe poos wooly W5>
“auoz Y/wyg@ 40) abpa pod wos wlg>
“euoz y/wyo9 40) e6pe poos Woy Wg">

0} Spue ‘DUIZD}UID POYDW D YIM SpOOI UD

    

  

apis yoba

 

           

r

paunbe. sypmppay aya12u0o

ON sada yybua] adig

 

ee

“LZ adAL uaweapd punoqun p
‘asog jaansb payondwiog ¢z| YA

 

          

s4904 QOZe “UU
BRNO / IM] Yowd auErs
‘s|bmpu2 aspnbs /Surdojs

 

oy! Burdojs oq

“waws2 Ym paynoud
00% UIWs Jo ayas2U02 aq oO} s[J>mpug

 

yybley ul xpW gor of

7% Ajuo ssou6 aq ysnw

peu sly) ul UoRDyebay,
paunbay youaq

jo yyS10H}

 

 

 

 

 

 

 

 

ppoiJo spy

dl

Auppi
wo9+'d'L 40 apa poor
WOl} WG, Jo Jaybalb ayL

 

dl

 

 

 

 

Page 7

2aUP4S AD LORE ORE AYO SMO WNEOURDEY 950+ OBA NERD:D DU AUPLIARURLUOD ¥ORBIOE-LLONS HOM W Lic HMO OMIHCAN TS

 

 

  

 

 

 

 

 

 

 

 

 

aa NAAIMG We E bosg 6zes(z0)*e} —_gas9 6zeS (z0)'ud Pecetv | oe SNOSVSY Eira

Year: a (SALLVNUALTY AUSONO) AVMARG TUN HONNOO a a SoSp GIO. NILNWM@L ‘UQUEMa) LpL xog Og un] ne ‘euziraaanssi v Ty
1990-Su 980-54 OSS OVEN OL WNCNSOCY SNINVEC CYONVLS SOON mA mM SNOLLVOLLSSANI GNY NOISSG Lassv iV IW

TSS, SONISSOUD STIDIHSA SYNLONYLSVYINI ONINNVTd 3

 

 

 

 

 

 

 

 

 

 

 

STIVLAd JONVLSIG LHOIS GNV
LY3ATNI “ONIHONAS ‘SNOLLOAS TWOIdAL © HOS
950-SY ONIMVYC GYVGNVLS OVAMdl 43458

(-unw) yong WWOF “FL 90 - OF SLYIN WIM aoUuepl0j2e

ur yeudsy Jo jeas UaWNpG yOD Z B aq 0} s9BpNs Buea
“yuowaned (|Z adA) aseq jones6 poyoedwoo yong WWwSZ| JO
wnwlumw e aq 40 juawaned peo Buysixe yo}eW 0} a5pa pea
Sugsixe oyu Bunynqe yuswened Aemaaup jo wos") WNWWIUIYy

apis yooe

~ 180d aping
“

Joos uawnyig 3009 7

~Bm

9S0-SY OL WNGNACGGV IONNOD AYIHS VSOON

          

NII WO0"L
"sag wos"t

Japinoys pajoes jo a6p3

 

‘Aung Aneay ‘sSurssolD apiye/ LSO-SY WaMdl Jed se (xew) Jae Bulpuyq
pues wigs e aaey pue paced Ajpeyjuso yuawaqojuIes Z/7S YM yoIy)
WUWS/ | ‘ZEN @Peus syes9UOd LUNUUIUIWW e ye aq sn }! ‘AUepUNOg Ayedoud
0 dn Aemaaup jo Japurewad 34) 405 USOYD SI JUaWAaAed B}a19U09 B 4}

 

  

pauinbes s\jompoey
9y99N09 sayin ybuat adig

 

 

 

 

Aippunog Ayecorg | T

+—ara53—
VA]

"1% adX, ‘Quawanod punoqun
‘asoq jerosb payoodwog cz,

 

 

Page 8

                                                                          SELF ASSESSMENT CHECKLIST
                                         Vehicle Crossover Checklist – Standard or Non-standard?

Driveway Crossover Checklist – Standard or Non-standard?
Complete the following checklist to determine if your proposed crossover is standard or
non-standard and then complete and submit the relevant form to council for approval.
Refer to the Institute of Public Works Standard Drawings (RS-049, RS-050 and RS-056, RS-056.1) to
assist you in answering the questions. Refer to the Planning Scheme to determine if your property is
urban / rural. Note: If access to your property is from a Queensland Government controlled road, you will
require approval from the Department of Transport and Main Roads to complete your crossover construction.

Answer Yes or No

If in an urban area, is the crossover to be constructed from concrete (includes, coloured and  Yes  No
exposed aggregate concrete, asphalt or bitumen; must be compliant with Aust. Standards for
slip resistance) No raised edges i.e. stamped concrete raised pattern or painted/ sealed/                N/A
polished surfaces.
If in a rural area, is the crossover to be constructed to council’s rural standard drawing RS-056  Yes  No
       l?
Is this going to be the only crossover for this property?                                          Yes  No

Is the crossover access located so as to provide a clear view of passing pedestrians and           Yes  No
vehicles? (Refer to Standard Drawings RS-049, RS-050 or RS-056)

Is the crossover in a location where there are no painted or concrete traffic islands on the       Yes  No
road in front of the crossover?

Is the crossover at least 1.0 metre clear of the nearest storm water pit or power pole?            Yes  No

Is the crossover in a location where there are no road signs or trees in the way?                  Yes  No

Is the crossover in a location where its construction will not disturb a survey mark?              Yes  No

Is the crossover in a location where there are no water meters, fire hydrants or valves in the     Yes  No
path of the crossover?

Is the crossover in a location where it will not cover the water supply pipe between the main      Yes  No
and the meter?

Is the crossover in a location where there are no sewerage or storm water manholes in the          Yes  No
path of the crossover?

Will the crossover levels match the existing concrete footpaths (if present)?                      Yes  No N/A

Is the crossover outside of a prohibited location as shown in Standard Drawings number             Yes  No
RS-049 and RS-050 or for rural driveways Standard Drawing number RS-056?

Is the crossover in a location where it will not be within 10 metres of the approach side of a     Yes  No
bus stop?

Is the crossover in a location where it will not be built over a recognised easement?              Yes  No

For an urban residential crossover is it less than 25 metres in length within the road reserve?    Yes  No N/A

For a rural crossover is it less than 45 metres in length within the road reserve?                 Yes  No
If you are on a corner, will the crossover be constructed in the road described as your street
                                                                                                   Yes  No   N/A
address?
If you have answered ‘No’ to any questions you need to apply for a Non Standard - Operational Works
approval, using DA Form 1 – Development Application Details.
If you have answered ‘Yes’ to all questions in the above checklist, your driveway crossover is
considered standard and no additional council approval is required. (Please note the Standard
Driveway crossover terms and conditions and safety requirements included in this document)

Page 9

                                                                                                       FACT SHEET
                                         Non Standard Vehicle Crossover application process


Vehicle Crossovers on Council Controlled Land
Non Standard Crossover Application Process
                                                             It should be noted that pavers, tiles, loose
Where you intend to construct a
                                                             stones, slippery polished or painted/ sealed
nonstandard vehicle crossover which you
                                                             and gravel in urban areas are not appropriate
believe to be outside of council’s self-
                                                             construction materials. These materials do not
assessable guidelines, you can apply the
                                                             appropriately withstand constant vehicle use
following process.
                                                             often causing pedestrian slip and trip hazards
Construction includes any new crossover or                   and environmental issues.
modification or alterations to your existing                 This may also apply to a rural crossover; the
crossover where you are changing the profile,                material used must be sufficiently compacted
surface, dimension or materials. Basic                       so that it does not wash onto the roadway or
maintenance or upkeep such as repairing                      storm water system and create additional
cracks or mowing the crossover area does not                 environmental issues.
require council approval.
                                                             You may at this point decide to hire a licensed
Step 1 – Plan the location                                   contractor to construct your crossover. A
                                                             licensed contractor should be appropriately
Consideration needs to be taken when planning                insured and has the expertise to interpret
the location of your crossover. Ideally your                 standard drawings and provide specialist
crossover should be planned prior to the                     information.
construction of your house to prevent further
expense in moving obstacles. You need to                     Step 3 – Submit your Non Standard
ensure there are no obstructions such as public              (Operational Works) Crossover
utility services, street trees, water meters, traffic
                                                             Application
signs, infrastructure or traffic islands impeding
access. Also consider the kerb space between                 Complete and submit DA Form 1 – Development
your proposed crossover and your neighbors as                Application Details .
your crossover will affect the number of parking
spaces available near your property.                         Your application will be assessed and either
                                                             declined or appropriately conditioned.
Crossovers cannot be constructed in the
locations specified in the relevant standard                 Construction, modification or alteration of
drawings – indicated as crossover prohibited                 the crossover must not commence until
locations.                                                   you have received formal written approval
                                                             from council and satisfied all necessary
Step 2 – Design your crossover                               conditions.
Standard drawings are available to assist you                Step 4 – Begin construction
or your hired contractor with the construction of            The construction of a crossover may start as
your crossover. Select the appropriate standard              soon as council has provided written approval
drawing RS-049 and RS-050 or RS-056, RS-                     and satisfied all necessary conditions.
056.1 for the crossover type and the kerb and                Construction of the crossover must be
channel type. The standard drawings can be                   completed within 24 months of receiving the
downloaded from council’s website.                           council approval.
                                                             Important: - Before any excavation takes place
                                                             call Dial Before You Dig on 1100 to locate any
                                                             underground pipes and cables.
      T (07) 5329 6500 | F (07) 5329 6501 | ABN: 97 969 214 121 | www.noosa.qld.gov.au | [email protected]
           Postal address: PO Box 141 Tewantin QLD 4565 | Tewantin office: 9 Pelican Street Tewantin QLD 4565

Page 10

Crossover construction requirements:                        •    If excavation will occur as part of the
                                                                 crossover construction, you must phone
Your crossover must be constructed in                            Dial before You Dig on 1100 to locate
accordance with the following requirements:                      underground pipe and cable networks such
•   The crossover must not obstruct access or                    as gas, communications, water and
    cause damage to public utilities such as bus                 electricity. Any damage to infrastructure will
    stops, bikeways, parking bays, taxi ranks,                   be repaired at the property owners’
    storm water drains, water meters, fire                       expense.
    hydrants, utility service pits, street trees and
    power or light poles.
                                                            Crossover guidelines:
•   Phone, electrical and Water Meter pits and              Council recommends you consider the following
    maintenance manholes can be                             additional steps when constructing a crossover:
    incorporated into the crossover with the                •    Check the condition of all existing kerb,
    relevant service provider’s permission. The                  channel, footpath and road surfaces. Take
    service cover is to be adjusted to the level                 a photograph or provide a written statement
    of the crossover at the owners’ expense                      of all damage and submit it with your
    and with the appropriate utility companies                   application prior to carrying out any work.
    consent.                                                     Any damage caused by the crossover
•   A standard vehicle (i.e. sedan/wagon) must                   construction will be repaired at the property
    be able to negotiate the gradient without                    owners’ expense.
    difficulty or harm to vehicle, pedestrians or           •    Do not disturb survey marks during
    property.                                                    crossover construction. They may be
•   The crossover drainage must be                               required for future property boundary
    appropriate to ensure your property and                      identification.
    neighboring properties are protected from
    storm water overflow in a concentrated                  Please note – Council, in managing the integrity
    form from the road and other properties.                of the standard crossover approval process, may
                                                            review your construction to ensure you have
•   The crossover cross fall must not                       complied with council’s standards and terms of
    direct storm water runoff onto                          your approval.
    neighboring properties.
•   Vehicle tracks and other non-constructed                Ongoing Obligations:
    crossovers are not permitted on the road
    reserve (footpath). A full slab crossover               As emphasised throughout all of this
    must be constructed between the kerb and                documentation, the property owner is
    the property boundary.                                  responsible for the construction AND
                                                            maintenance of a crossover. The crossover is
•   Adequate signage, barrier protection and                deemed to include any pipe and kerb
    redirection measures must be in place if                infrastructure which was constructed or altered
    construction of the crossover obstructs                 as part of the crossover construction.
    pedestrians or traffic. For standards and
    procedures refer to the Manual of Uniform               Non-compliance penalties:
    Traffic Control Devices at
    www.mainroads.qld.gov.au.                               Failure to comply with the approval conditions
                                                            voids the approval thereby making the works
                                                            unauthorised and subject to penalties under
                                                            section 75 of the Local Government Act (2009).




      T (07) 5329 6500 | F (07) 5329 6501 | ABN: 97 969 214 121 | www.noosa.qld.gov.au | [email protected]
          Postal address: PO Box 141 Tewantin QLD 4565 | Tewantin office: 9 Pelican Street Tewantin QLD 4565

Page 11

                                                          Standard Driveway Crossover
                                                          construction terms and conditions
                                                          and safety requirements con

Standard Driveway crossover construction terms and conditions

For the purpose of constructing a crossover that is classed as self-assessable development,
Noosa Shire Council grants permission to carry out work on a Road Reserve or on Council
Owned Land, subject to the following terms and conditions:
(a)    Adequate warning of the presence of works on a Road Reserve or Council Owned
       Land shall be given in accordance with the Manual of Uniform Traffic Control Devices
       (MUTCD) *.
       (1)    Between sunset and sunrise such warning shall at least consist of a barrier with
              warning lights and a reflectorised warning sign on each side of the works.
       (2)    Between sunrise and sunset, such warning shall at least consist of a barrier with
              warning flags or a warning sign on each side of the works.
(b)    Any steps necessary for the protection of the public shall be taken by the applicant at
       the applicants’ expense.
(c)    Work shall proceed without any interruption to traffic. If a traffic lane closure is required,
       the person carrying out the works shall have the relevant road and footpath closure
       permit form approved prior to any road closure occurring. Works shall be carried out in
       accordance with the MUTCD *.
(d)    The works shall be backfilled, consolidated and the surface reinstated immediately
       after the works are completed, or before this permission expires, whichever is the
       sooner.
(e)    Any subsidence or other damage which occurs and is attributable to the work done
       under the application shall be repaired by the applicant or the applicants’ agent within
       forty eight (48) hours of receiving notice to do so by the Authorised Officer.
(f)    The applicant shall be required to ensure that they/ their contractor has an appropriate
       Public Liability Insurance Policy of not less than $20 million covering any risk arising
       from the proposed work outside of property boundary.
(g)    A minimum 1.5 metre pedestrian throughway shall be maintained at all times. This
       pedestrian throughway shall be of equivalent standard to existing or to the satisfaction
       of the MUTCD and Council.
(h)    If relocating an existing crossover, the old crossover must be removed and the kerb
       and channel reinstated to the existing kerb profile and satisfaction of Council.
(i)    If the applicant constructs a non-conforming crossover and fails to get the appropriate
       approvals the crossover may be considered non-compliant, unapproved and require
       appropriate remediation to comply with Council’s approved standards or be removed
       by council at the owner’s expense.


       * The MUTCD is available free from the Main Roads website.

 Privacy
 Council will use any personal information provided for the intended purpose only and for remaining
 in contact with you. Council is authorised to collect this information in accordance with the Local
 Government Act 2009 and other Local Government Acts. Your personal information is only accessed
 by persons authorised to do so. Your personal information is dealt with in accordance with council’s
 privacy policy.

                                                                                     MS DRAFT Revised Dec 202

Page 12

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.