Council archive · source document
Superseded Tpc 1944 · 51987.2925.2
D.J. Tatton & Seldac Pty. Ltd. - Tpc 1944 ~ 16th September, 1987 - Page 2 5. Payment of any outstanding rates owing on the property. 6. This consent 6pproval does not imply Building Approval. Working drawings shall be submitted in compliance with the Building Act 1975 as amended and shall iy in accordance with the plans the subject this “co nt. (Substantial variations will require separate Coottteap nt 7. The approval herein is for Town Planning Consent only and does not imply that Council approval will be granted to an application under the Building Units ana Group Titles Act. 8. Permanent covered car Parking is to be provided on site for 26 vehicles together with space for 6 visitor vehicles. (uncovered). 9. All internal roadworks (including parking areas) and access from the existing frontage road to connect to the internal roadworks shall be provided with a sealed pavement, which shall be designed, drained, constructed and Maintained in accordance with the standards and requirements of the Shire Engineer. 10. The Developer shall bear the cost of alteration: of any public utility or facilities necessitated by the development of the land or associated development external to the site. If. Connection to Council's existing water supply reticulation at the Developer's expense to the standards and requirements of Council's Building Surveyor. 12. Connection to Council's existing sewerage reticulation system at the Developer's expense to the standards and requirements of Council's Building Surveyor. 13. .Filling levels and floor levels of all buildings, other structures and car park area levels shall be established to the requirements of the Shire Engineer. such levels shall be provided upon epplication to the Engineering Department. 14, Filling, other development works or the erection of any buildings or other structures shall be carried out So as not to cause any ponding of water on adjoining land or any blockage or interference with natural watercourse or in any other way unduly affect adjoining property. 15. No earthworks or filling shall be carried out on site until the issue 16. Stormwater, including that from the roofed and paved areas to be piped to Council's existing drainage system at the developer's expense to the standards and requirements of Council's Building Surveyor.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED TPC 1944.pdfRelated documentApplication case desk ↗
About this file
- File size
- 243 KB (small file)
- File type
No other editions are linked here.