Skip to the record
For the highest quality transcripts.

Original source · versioned page text

TIA - Application decision - s62A (PA) - Approval_1

Attached to the e-mail RAL22/0017 - SARA Referral agency response – with conditions..

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                          Attachment A

                             Decision Evidence and Findings



Findings on material questions of fact:

    The objective of the Transport Infrastructure Act 1994 (TIA) requires the establishment of
       a road regime that is safe and efficient.
    Section 62 of the TIA provides for the Chief Executive of the department of transport and
     main roads (the Department) to make decisions about permitted road access locations
     between particular land and state-controlled road.
    The development application (Council reference: RAL22/0017) seeks a Development
     Permit for Reconfiguring a Lot for 1 into 2 lots.
    The subject site has a frontage to Kin Kin Road, known locally as Hill Street, a
     state-controlled road under the jurisdiction of the department.
    There is currently an existing access between the site Lot 6RP35080 to Kin Kin Road,
     with no opportunity to gain access from a local road.
    Access to proposed lot 2 is proposed to Kin Kin Road.
    The posted speed limit is 60km/h near the site.
    The access proposed is conditioned to be of a suitable standard.
    The proposed development can be effectively implemented without significant impacts to
     the safety and efficiency of the state-controlled road network with the conditioned access
     requirements.

Evidence or other material on which findings were based:

Title of Evidence /    Prepared by                 Date           Reference no.   Version/Issue
Material
Transport              Queensland                  Reprint        -               -
Infrastructure Act     Government                  current
1994                                               from 21 July
                                                   2020
Planning Act 2016      Queensland                  Reprint        -               -
                       Government                  current
                                                   from 18 June
                                                   2021
Guide to Traffic       Department of               2018           -               -
Impact Assessment      Transport and Main
                       Roads
Vehicular access to    Department of               2019           -               -
state-controlled       Transport and Main
roads policy           Roads
Management of
access between
adjacent land and
state-controlled
roads
Road Planning and      Department of               August 2014    N/A             2nd Edition
Design Manual          Transport and Main




                                                                                        Page 4 of 11
Log in to download the original file

TIA - Application decision - s62A (PA) - Approval_1.pdf · 551 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.