Skip to the record
Every meeting, every word.

Original source · versioned page text

8. Volume 5 - Stormwater Management Plan

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Traffic Impact Assessment & Stormwater Management Plan (email 3 of 3).

of 83

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                  LAMBERT & REHBEIN
                                                    ENGINEERS • MANAGERS • SCIENTISTS


4.0     STORMWATER QUALITY

4.1     STORMWATER QUALITY OBJECTIVES
In accordance with the SEQ Regional Plan Implementation Guideline No.7 for Water Sensitive
Urban Design the required operational phase Water Quality Objectives (WQOs) are provided in
Table 9 below.
                       Table 9 Operational Phase Water Quality Objectives:
                                      Pollutant                      Pollutant Load
                                                                      Reductions
                        Total Suspended Solids (TSS)                     80%
                           Total Phosphorous (TP)                        60%
                              Total Nitrogen (TN)                        45%
                             Gross Pollutants (GP)                       90%



4.2     POTENTIAL WATER QUALITY IMPACTS
4.2.1   CONSTRUCTION PHASE

Potential exists during the construction phase of development for sediment (from exposed soil
areas and stockpiles) to become mobilised by stormwater. This results in suspended solids
entering waterways. Table 10 below details the typical stormwater pollutants which may be
generated during the construction phase of a development.
                          Table 10 Typical Construction Phase Pollutants

                      Pollutant                                            Sources
                                                        Paper, construction packaging, food packaging,
                         Litter
                                                                  cement bags and off-cuts.
                                                       Unprotected exposed soils and stockpiles during
                      Sediment
                                                                  earthworks and building.
                                                        Fuel and oil spills and leaks from construction
                    Hydrocarbons
                                                                           equipment.
                                                       Cement slurry, asphalt prime, solvents, cleaning
                    Toxic Materials
                                                                 agents and wash waters.
              pH altering substances                           Cement slurry and wash waters.



 Ref: B16239CR002                                           - 10 -                         Stormwater Management Plan
                                                                                        Noosa Energy Centre - Noosaville
Log in to download the original file

8. Volume 5 - Stormwater Management Plan.pdf · 8.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.