Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Council Meeting MCU22-0201

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

PROPOSED SITE LAYOUT PLAN

 

SCALE 1: 100

‘Additional On-Site Retention’Detention Tank added 20-12-2023
Tool tines
Footpath] 10-05-2023
t0be 20M MIN widein Opal + Elm Steet

Tesved For Nooea Council Pre-Lodgament Nesting 2

Tssued For SARA Pre-Loagerent Meating
Tssued For Noosa Counel

REVISIONS

pens St opaanst
Existing Bus Stop

Store Room

Disabled
WC

"TMC Building Design Group 2023

Ve

T
|
|
|
|
|
|

|
|
|
|

|
|
Das}ed ines dete exert

ot moor typical.

 

Design Copyright
drawings may not be copied in whole
in part without the written consent of TMC
Design Group. Any changes

 

ISSUED FOR PLANNING APPROVAL

NOT TO BE USED FOR CONSTRUCTION PURPOSES

 

 

by the Client, Council or the
Planning Approval Authority shall
reported to TMC Building Design Group

authorisation prior to said changes being

‘TC 20 Dec 2023 10:35 PM - T.\TMC\\2020120-032 Chris King- Cooroy, QLD\20-032 DA Rev F.DWG

 

 

"Auto Bay 2

=Tr=
FFLbo9.95

Store Room

Wash Bay 1

Co

Wash Bay 2

HH

Super Bay 1

in

Super Bay 2

Co

PROPOSED CAR WASH +
TAKE AWAY FOOD & DRINK
OUTLET

Vac Bay 1

Vac Island

Vac Bay ,/
fe

/

Vac

‘Staff
LS Car Park
Ve 2.6m x 5.4m

>
a
9./
\ Car Park
1

26m x 5.4m

AT: 34 (LOT 4, 5 & 6) ELM STREET,

COOROY, QLD, 4563

FOR: CHRIS KING & JOANNE HILL

Drawn:

 

Designed:
T. MICHAELS

T. MICHAELS

SERVICES LEGEND

mesees—ees— Existing Sewer Pipe
Existing Stormwater Drainage
Existing Overhead Power Lines
Existing Water Mains Pipe

Existing Telecom Cables

 

WARNING:

The existing services shown on this plan have been
derived either from field survey or plotted from
records of the relevant authorities and no guarantee
is given as to their accuracy. Itis the responsibilty of
the contractor to verify on site the location of all
services prior to the commencement of works.

 

 

 

Existing
Single Storey
Building

DIAL BEFORE

YOU DIG

www.1100.com.au
4 —)
ae TMC [Building Design G
Design uilding Design Group

P.O. Box 3494, Mornington, VIC, 3931. Phone No. 0416 114 573
Matters emai
National

Scale:1:100(A1) _[Date: DEC 2023 Issue:

we: 20-032 DA] F

Sheet No: 2 of 9.

 

 

 

 
Log in to download the original file

Council Meeting MCU22-0201.pdf · 19.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.