1 FURTHER REPORT - MCU APPLICATION FOR INDUSTRIAL BUSINESSES, SERVICE
STATION & CONVENIENCE SHOP & FOOD OUTLET (TRADIES CAFE) AT 139
EUMUNDI NOOSA RD & 30 LIONEL DONOVAN DV, NOOSAVILLE - MCU14/0102 &
OPERATIONAL WORKS APPLICATION FOR SIGNAGE - OPW15/0051
Author Development Planner, Glen Conforti
Planning & Infrastructure Department
Index ECM / Application / MCU14/0102 & OPW15/0051
Attachments Nil.
RECOMMENDATION
That Council note the report by the Development Planner to the General Committee Meeting
dated 1 June 2015 and approve the application for a Material Change of Use (MCU14/0102) and
Operational Works (OPW15/0051) for Signage at 139 Eumundi Noosa Rd and 30 Lionel
Donovan Drive, Noosaville, subject to conditions and grounds for approval contained in the
Planning & Organisation Committee Agenda dated 26 May 2015 with amendments to the
Material Change of Use conditions 68, 84 and 91 to read as follows:
Operational
68. A Safety Management Plan must be developed and implemented for the operation and
maintenance of the UPSS that includes both tanks and piping. The plan must include
systems and procedures for preventing and monitoring for spills and leaks, and the
appropriate response plan to these events. The management system must incorporate the
following components:
a. objectives and targets to comply with all relevant legislation
b. hazard identification and risk assessment
c. details of the UPSS design and installation details (tank sizes, contents, location of all
relevant infrastructure)
d. list of industry standards complied with for the design, installation and operation of
the system
e. plans of the system and site
f. leak prevention measures
g. loss monitoring procedures
h. system maintenance procedures
i. emergency spillage response plan
j. loss investigation and notification procedures
k. record keeping
l. training requirements and records
m. information on ownership and occupation of both the site and the UPSS, including
specific contractual/franchise arrangements, defined responsibilities and relevant
contact details
Page 4 of 44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.