Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2015-06-01 General Committee Agenda

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                       1 JUNE 2015


REPORTS DIRECT TO GENERAL COMMITTEE


1     FURTHER REPORT - MCU APPLICATION FOR INDUSTRIAL BUSINESSES, SERVICE
      STATION & CONVENIENCE SHOP & FOOD OUTLET (TRADIES CAFE) AT 139
      EUMUNDI NOOSA RD & 30 LIONEL DONOVAN DV, NOOSAVILLE - MCU14/0102 &
      OPERATIONAL WORKS APPLICATION FOR SIGNAGE - OPW15/0051
Author           Development Planner, Glen Conforti
                 Planning & Infrastructure Department

Index            ECM / Application / MCU14/0102 & OPW15/0051

Attachments      Nil.


RECOMMENDATION
That Council note the report by the Development Planner to the General Committee Meeting
dated 1 June 2015 and approve the application for a Material Change of Use (MCU14/0102) and
Operational Works (OPW15/0051) for Signage at 139 Eumundi Noosa Rd and 30 Lionel
Donovan Drive, Noosaville, subject to conditions and grounds for approval contained in the
Planning & Organisation Committee Agenda dated 26 May 2015 with amendments to the
Material Change of Use conditions 68, 84 and 91 to read as follows:
      Operational
68.   A Safety Management Plan must be developed and implemented for the operation and
      maintenance of the UPSS that includes both tanks and piping. The plan must include
      systems and procedures for preventing and monitoring for spills and leaks, and the
      appropriate response plan to these events. The management system must incorporate the
      following components:
      a.   objectives and targets to comply with all relevant legislation
      b.   hazard identification and risk assessment
      c.   details of the UPSS design and installation details (tank sizes, contents, location of all
           relevant infrastructure)
      d.   list of industry standards complied with for the design, installation and operation of
           the system
      e.   plans of the system and site
      f.   leak prevention measures
      g.   loss monitoring procedures
      h.   system maintenance procedures
      i.   emergency spillage response plan
      j.   loss investigation and notification procedures
      k.   record keeping
      l.   training requirements and records
      m.   information on ownership and occupation of both the site and the UPSS, including
           specific contractual/franchise arrangements, defined responsibilities and relevant
           contact details




                                                                                       Page 4 of 44
Log in to download the original file

2015-06-01 General Committee Agenda(PDF, 1MB).pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.