HO ROAD B/HOFMAN DRIVE SETOUT TABLE (KERB 7)
FM
AN POINT No. EASTING NORTHING LEVEL DESCRIPTION
N 41 X=504924.967 Y=7077921.555 4.487 CH91.567 TP R15
42 X=504919.183 Y=7077923.496 4.519 CH97.108 1/4 RADIUS
D
RI
43 X=504913.105 Y=7077922.973 4.550 CH232.961 MID POINT
VE
1 40 44 X=504907.738 Y=7077920.072 4.581 CH226.974 1/4 RADIUS
CH 45 X=504903.970 Y=7077915.274 4.612 CH220.190 TP R15
KERB LIP AT PAVEMENT LEVEL
RADIUS = 15 (LIP) ARC LENGTH = 24.575m
R1
ROAD B/HOFMAN DRIVE SETOUT TABLE (KERB 8)
POINT No. EASTING NORTHING LEVEL DESCRIPTION
0%
5
46 X=504895.630 Y=7077920.927 4.540 CH221.421 TP R23
3.
<
47 X=504897.945 Y=7077927.701 4.595 CH227.689 1/4 RADIUS
48 X=504898.065 Y=7077934.860 4.651 CH233.054 MID POINT
0
50 12
CH
49 X=504895.978 Y=7077941.708 4.576 CH124.810 1/4 RADIUS
<4
50 X=504891.886 Y=7077947.583 4.399 CH131.611 TP R23
%
KERB LIP AT PAVEMENT LEVEL
R1
RADIUS = 23 (LIP) ARC LENGTH = 28.755m
49 CH
<1.2%
2 43
.24
9
KERB 8
48
6%
100
0.8%>
0.
<
47 CH
0.8%
>
.8%
46 0.5%> 0.5%
>
<3 <4
.0
% KERB 7
42 HO
43 FM
41 A NN
<2
%
DR
IVE
>
CH 44
5%
220
0.
3.
0%>
45
B D
ROA
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD DRAWN
I GDETAL
IS SCALE APPROVED PROPOSED SUBDIVISION 1856
A 13-09-19 FOR APPROVAL MM CL AT NOOSA CIVIC, WALTER HAY DRIVE
B 25-08-20 REVISED FOR APPROVAL - WALTER HAY DRIVE TURN AROUND MM CL DATUM AHD SHEET: 30 OF 42
0 2.5 5 7.5 10 12.5m
FOR STOCKWELL PTY LTD
C
D
21-09-20
15/10/20
REVISED FOR NOOSA COUNCIL DRAFT CONDITIONS
REVISED AS PER COUNCIL RFI [29/09/20]
MM
MM
CL
CL
DESIGN MM ................. DRAWING NUMBER REV
DRAWING TITLE:
E 23/11/20 REVISED AS PER COUNCIL RFI MEETING MM CL DRAWN MM Director: CAMERON LANDRETH
SCALE 1:250 A3
DESIGN CHECK (RPEQ 19358) p 07 5443 8285 ROAD B / HOFMANN DRIVE INTERSECTION R59 E
CL
e [email protected] w www.barlowshelley.com.au
DATE 13-09-19
This drawing is not to be copied or amended without written permission from
Barlow Shelley Consulting Engineers a PO Box 899, Maroochydore,4558 ABN 89 215 591 077 DETAIL PLAN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.