3m
JOINS PLAN 1856-R39 14.
1m
3m
LOT 3 CH
RB
120
NEW FOOTPATH PRAM
70 8
RB
KE
0 4.004 Ha 2m
:4 2. .1
H20 TO IPWEAQ RS-090
<1 NS L5
C
KE
FH
B1
F
SM
SM
B1
4
4
LOT 4
CH
LOT 7
CH0
10
180 2183m²
0
CH 2.963 Ha
NEW FOOTPATH PRAM &
C
:4
ANGLED CROSSING TO
CH
AD
<1
CH
:4
IPWEAQ RS-090 & 094
RO
80
20
<1
m
12.2 2m
%
<1
160
CH
1:4
CH
B1
2m
60
B1
4
KE
83 0
SM
7. .0
KE
RB
S 8
CH40
%
N FL
LOT 5
RB
%
<1
LOT 8
:4
<1
0 CH
<1
H1
4 2307m² LOT 6 40
3257m²
C
75 9
4. . 7
2473m² NEW FOOTPATH PRAM &
S 4
N FL
ANGLED CROSSING TO
IPWEAQ RS-090 & 094
CH60
0
12
CH2
CH
2m
0
LOT 15
CH
24 LOT 9 SAW CUT EXISTING ROAD A PAVEMENT TO
2 .93
1:4
3274m²
4.6m
4221m² 5 PROVIDE CLEAN FACE FOR NEW ROAD PAVEMENT
100
CONNECTION. REMOVE EXISTING TO TIP
CH
NEW FOOTPATH PRAM
SM4
CH80 CH0 E
CH20
CH40
CH80
TO IPWEAQ RS-090 IV
027
SM4
DR
CH60
98.
CH Y
220
CH
HOFMANN DRIVE HA
80
ER
5m
CH
T
5.0
10m
AL
4
4.6m
SM
CH100 <1.5% CH
20
W
2m
8m
0
6
<1.5%
3.7
CH
B1
JOINS PLAN 1856-R37
CH200 RO KE
AD RB
A
40
NEW FOOTPATH PRAM B1
CH
TO IPWEAQ RS-090 KE
CH40 RB
CH120 LOT 16 SAW CUT & BREAK UP EXISTING TRAFFIC
NEW FOOTPATH PRAM
LOT 14 4430m² ISLAND AS REQUIRED TO CONSTRUCT
0
TO IPWEAQ RS-090
2
80 10m
5m
CH
CH1 NEW BIORETENTION BASIN. REFER TO
4005m²
5.0
STORMWATER DRAWINGS FOR DETAILS
BREAK UP EXISTING AC
CH SEAL, BARRIER KERB (B1
0
60
CH
140 TYPE) & FOOTPATH TO TIP
CH 0
16
CH
LOT 10
%
.5 4733m²
CH
<1
80
140
1 60 4 EXISTING PEDESTRIAN CROSSING
CH 1:
10m
5%
CH
. < TO BE REMOVED & PRAM RAMPS TO
CH10
<1 ROAD B 0.
CH120
B1
KER 7 5%
BE REMOVED AS THEY ARE TO
0
B CLOSE TO EXISTING ROUNDABOUT
0
.0
0 FOR NEW EARTHWORKS OVER
2m
4
18
FL
CH LOTS 10 TO 16 REFER TO
PLANS 1856-EW01 TO EW09
80 7
5. .1
S 6
N FL
LOT 13 1:
4
1.
1.5%
5%
6 4117m²
1.5%
5
3.
>
0
20
63
FL PROVIDE MULCH
>
CH
1.5%>
1.5%>
2.
>
TO 1:2 BATTER
S
LOT 11 SAW CUT EXISTING ROAD A PAVEMENT TO
N
PROVIDE CLEAN FACE FOR NEW ROAD PAVEMENT
4999m² CONNECTION. REMOVE EXISTING TO TIP
45
98 1
3. .4
4.
S 5
FL
N FL
CONNECT EXISTING FOOTPATH TO
0
22
LOT 12
CH
NEW FOOTPATH WITH DOWELL JOINT
7972m²
CH240
TO IPWEAQ RS-065
CH260
PROVIDE MULCH I VE
28
0 TO 1:2 BATTER DR
CH Y
HA
07 3
3. 0
S 4.
R
N FL
TE
AL
JOINS PLAN 1856-R35 W
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD DRAWN
I GDETAL
IS SCALE APPROVED PROPOSED SUBDIVISION 1856
A 19-02-20 FOR APPROVAL MM CL AT NOOSA CIVIC, WALTER HAY DRIVE
B 25-08-20 REVISED FOR APPROVAL - WALTER HAY DRIVE TURN AROUND MM CL DATUM AHD SHEET: 7 OF 42
0 10 20 30 40 50m
FOR STOCKWELL PTY LTD
C
D
21-09-20
15/10/20
REVISED FOR NOOSA COUNCIL DRAFT CONDITIONS
REVISED AS PER COUNCIL RFI [29/09/20]
MM
MM
CL
CL
DESIGN MM ................. DRAWING NUMBER REV
DRAWING TITLE:
E 23/11/20 REVISED AS PER COUNCIL RFI MEETING MM CL DRAWN MM Director: CAMERON LANDRETH
SCALE 1:1000 A3
DESIGN CHECK (RPEQ 19358) p 07 5443 8285 ROAD WORKS LAYOUT PLAN 2 OF 8 R36 E
CL
This drawing is not to be copied or amended without written permission from e [email protected] w www.barlowshelley.com.au
DATE 13-09-19 Barlow Shelley Consulting Engineers a PO Box 899, Maroochydore,4558 ABN 89 215 591 077
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.