                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               FOLLOWING CONSTRUCTION AND PRIOR TO THE COMMENCEMENT OF THE USE
                      Supervision/Certification
               50.    Prior to commencement of use the following (prepared by respective qualified persons* and
                      certifying compliance with approvals) must be submitted to Council:
                      a.      Landscaping certification confirming all works have been constructed in accordance
                              with conditions of approval.
                      Certification
               51.    Upon completion of the work a certificate must be issued by an RPEQ certifying that the
                      works have been constructed in accordance with the Operational Works permit.
                      As Constructed Plans and ADAC XML Files (Council)
               52.    Prior to acceptance of civil works to become Council assets “On Maintenance”, satisfactory
                      “As-Constructed” records must be submitted to Council. The bundle of “As Constructed”
                      information shall include:
                       a) As-Constructed Engineering Drawings. Data is to be submitted in an electronic drawing
                          file format (.dwg), with all plans clearly endorsed “As-Constructed”, along with the
                          accompanying hardcopies (PDFs of the As-Constructed .dwg drawing files), and;
                       b) ADAC XML Digital File. ADAC File format (ADAC - Asset Design As Constructed)
                          prepared in accordance with industry standards and recorded in “MGA - UTM56 /
                          GDA94” projection.
                            Please Note: Further information and advice relating to the as-constructed
                            drawing presentation, as-constructed survey capture and associated guidelines
                            for preparation of a compliant ADAC XML digital file are available on the webpage
                            titled “As-Constructed Guidelines” and accessible at the Noosa Council Website:
                            Planning & Development / Development Tools & Guidelines / As-Constructed
                            Guidelines.
                       c) The “As-Constructed” drawings will require certification by a:
                              i.        Qualified experienced Civil Engineer (RPEQ) confirming design intent and
                                        conformance with applicable standards and specifications, along with the
                                        relevant descriptions of assets, services and structures and;
                              i.        Registered Cadastral Surveyor (Qld) in regard to the cadastral and locational
                                        information, levels and applicable survey datum.
                       d) The data must be in accordance with Council’s “Planning Scheme Policy 6 – Engineering
                          Design Standards”, and fully detail the levels for all engineering works including but not
                          limited to the drainage network and structures, finished ground and pavement surface
                          levels.
                      On Maintenance
               53.    All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
                      Council’s relevant Planning Scheme Policy prior to the commencement of the use. To
                      achieve ‘On Maintenance’, the supervising RPEQ must submit to Council:
                      a)      certification that all works have been undertaken and completed in accordance with the
                              requirements of this Permit.
                      b)      as Constructed details in accordance with Council’s Planning Scheme Policy.
                      c)      maintenance and operational manuals for all proprietary or site-specific devices

                                                                                                       Page 17 of 20

Document Set ID: 24188054
Version: 10, Version Date: 18/12/2025

Used in these records

About this file

File size
555 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Report (Representations made) MCU24 0153 (As Published).pdf · 555 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.