25. As a general rule, a site is determined to have achieved effective short-term stabilisation if
at the time of the plan sealing inspection:
a. Methods of stabilisation are:
• appropriate for slopes and slope lengths; and
• are consistent with best practice environmental management practices such as in
the Manual for Erosion and Sediment Control or the IECA Manual; and
b. Stormwater runoff from the site is not currently, and is not likely to result in visible
evidence of sedimentation or erosion, or lead to water contamination.
Biosecurity Act 2014 – Fire Ant Control
26. Developers must remain vigilant for the presence of fire ants. Under the Biosecurity Act 2014,
individuals and businesses are responsible for ensuring that they follow the movement
controls for specific organic materials to help prevent the spread of fire ants within South
East Queensland’s fire ant biosecurity zones. Movement of a fire ant carrier from within a fire
ant biosecurity zone may need a biosecurity instrument permit. More information is available
on https://www.fireants.org.au/treat/business-andindustry/movement-controls.
G. Agree to amend Section 10 - Further Development Permits Required to read as follows;
Type of Development Permit required Subject of the required Development
Development Permit for Building Works All building work.
Page 20 of 20
Document Set ID: 24188054
Version: 10, Version Date: 18/12/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Report (Representations made) MCU24 0153 (As Published).pdfRelated documentApplication case desk ↗
Negotiated Report (Representations made) MCU24 0153 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 555 KB (small file)
- File type
No other editions are linked here.