Council archive · source document
Negotiated Report (Representations made) MCU24 0153 (As Published) · MCU24/0153
Existing Condition 1 of the Preliminary Approval for Operational Works (OPW 24/0202) PRELIMINARY APPROVAL FOR OPERATIONAL WORKS (OPW24/0202) 1. Amended plans and associated reports must be submitted to Council prior to any further development applications being made and must include the following to the reasonable satisfaction of the Manager, Development Assessment: 1.1. Provide updated stormwater and engineering drawings including: a. Additional detail demonstrating that the post-development peak flow rate discharging to structure “7/1” does not exceed the pre-development peak flow rate. The detail must clearly demonstrate that the development and calculations incorporate appropriate climate change allowances in accordance with AO2.4 of the Water Quality and Drainage Code. Additional detail confirming an appropriate climate change allowance has been applied to the sizing of all detention tanks. A stormwater design calculation table. Details of detention outlet orifices / controls. Engineering documentation showing the materials, stair treatment and handrails along the pedestrian pathway adjacent to the southern frontage; Prepared by a suitably qualified person (RPEQ) 1.2. Provide updated access drawings/documents including: a. Appropriate manoeuvring areas for access to the car stackers in accordance with AS2890.1:2004 and the manufacturers specifications. b. Linemarkings for the car stackers. c. Prepared by a suitably qualified person (RPEQ). Applicant’s Request The applicant submits; ‘In accordance with Condition 1 of the Preliminary Approval for Operational Works, the Engineering and Landscape Plans have been revised to reflect the Architectural Plans. In addition to this, the Engineering and Landscape Plans have been amended to include the following: ● Updated stormwater and engineering drawings including: a. Additional detail demonstrating that the post-development peak flow rate discharging to structure “7/1” does not exceed the pre-development peak flow rate. The detail must clearly demonstrate that the development and calculations incorporate appropriate climate change allowances in accordance with AO2.4 of the Water Quality and Drainage Code. b. Additional detail confirming an appropriate climate change allowance has been applied to the sizing of all detention tanks. c. A stormwater design calculation table. d. Details of detention outlet orifices / controls. e. Engineering documentation showing the materials, stair treatment and handrails along the pedestrian pathway adjacent to the southern frontage; f. Prepared by a suitably qualified person (RPEQ) ● Updated access drawings/documents including: Page 6 of 20 Document Set ID: 24188054 Version: 10, Version Date: 18/12/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Report (Representations made) MCU24 0153 (As Published).pdfRelated documentApplication case desk ↗
Negotiated Report (Representations made) MCU24 0153 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 555 KB (small file)
- File type
No other editions are linked here.