MCU25/0118 - APPLICATION FOR MATERIAL CHANGE OF USE FOR MULITIPLE DWELLING - AFFORDABLE RENTAL PREMISES (25 x SMALL DWELLINGS) AT 64 LAKE MACDONALD DRIVE, COOROY · ATTACHMENT 2 - (MCU25 0118) - PLANNING OFFICERS REPORT

of 27

Page text shows just the words. Original shows the document exactly as it was published.

PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT                              10 FEBRUARY 2026


4.4. RELEVANT MATTERS
The application is impact assessable and, pursuant to section 45(5) of the Planning Act 2016, the
assessment manager may have regard to any other relevant matters in addition to the assessment
benchmarks of the planning scheme.
In this instance, the proposal delivers a substantial community benefit through the provision of
much needed social and affordable housing in a suitable location identified through Council’s
strategic planning framework and community consultation processes.
The proposed development does not result in unacceptable visual or amenity impacts.
On balance, the development achieves the intent of the Noosa Plan 2020 and warrants approval
notwithstanding minor variations to boundary setbacks, carparking provision and building height in
storeys for a small part of the development.
4.5. CONSULTATION
4.6. Referral Agencies
Not applicable
4.7. Internal Council Referrals
The application was forwarded to the following internal Council officers for review and/or comment:
•   Development Engineer, Development Assessment
    Waste
    An appropriate screened bulk bin storage is provided. The requirements attributed to a rear
    loading waste collection vehicle (WCV), as required by Council’s waste management team,
    have been accommodated in the design of the development. Swept path diagrams have been
    provided demonstrating that the WCV can enter the site in a reverse gear and exit the site in a
    forward gear, as agreed with Council’s waste management team. Sufficient space for a car to
    pass while the WCV is loading is provided.
    Parking and Access
    The engineering information supporting the application demonstrates that the car parks are
    functional. The swept paths provided demonstrate a HRV vehicle can access the site.
    Frontage Works
    External frontage works including footpaths and vehicle crossover have already been
    addressed as part of approved operational works associated with the reconfiguration
    (OPW25/0057).
    Earthworks
    A preliminary earthworks plan and sections have been provided. Retaining walls greater than
    1.5m are proposed, accordingly the requirement for an operational works application is to be
    conditioned.
    Stormwater
    A stormwater discharge connection and stormwater quality treatment has been accounted for
    as part of RAL25/0004 and subsequent OPW25/0057 approvals. Relevantly, a bioretention
    basin is adjacent to the development and accounts for the site’s catchment.
    An underground stormwater detention/retention tank has been proposed in the preliminary civil
    plans, and the details of the detention capacity and controls will be addressed in the
    subsequent detailed design of the stormwater operational works application.
•   Coordinator Engineering & Environment Assessment, Development Assessment
Log in to download the original file

ATTACHMENT 2 - (MCU25 0118) - PLANNING OFFICERS REPORT.pdf · 8.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.