Referral Agency Response - Planning RAP21 0015 · RAP21/0015
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which are
already cleared
d. using low impact construction techniques around vegetation.
12. Screening vegetation must be planted along the eastern boundary for the length of the
dwelling’s encroachment within the minimum side boundary setback. The works must
be undertaken in accordance with Council’s Planning Scheme Policy PSP2 -
Landscaping. The planted vegetation must have a minimum pot size of 200mm and
consist of native, endemic species with a mature height of not less than 4m metres and
a maximum spacing of 1.5 metre centres.
Property Access and Driveways
13. The residential vehicle crossover/driveway must be constructed from the existing
formation in Persimmon Road to the proposed car parking. The works must be in
accordance with a Road Reserve Permit approval.
14. The vehicle crossover (the section of driveway inside the road reserve) must:
a. Be constructed of concrete or other suitable hardstand;
b. Be constructed generally in accordance with the approved plan 30365-DW dated
April 2021, prepared by SCG Consulting Engineers as annotated by Council; and
c. Be generally in accordance with Council’s standard drawings RS-049 and RS-050.
Stormwater Drainage
15. Stormwater runoff from the development must be disposed of without causing scour or
damage to the subject site or any adjoining property. Any stormwater discharged from
the site must be to a lawful point of discharge.
16. Certification by a Registered Professional Engineer of Queensland that states that the
stormwater system has been constructed in accordance with the conditions of this permit
must be submitted to Council prior to the commencement of the use.
Earthworks and Retaining Walls
17. All fill and associated batters/retaining structures, both above and below ground level,
must be contained entirely within the subject site unless written permission from the
respective landowner(s) is provided to Council.
18. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by a Registered Professional Engineer of Queensland
where exceeding 1.0m in height.
19. Earthworks required on site must be carried out in accordance with Council’s Planning
Scheme Policy PSP6 - Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or concentrate or direct overland flow on to an
adjoining property.
Damage to Services and Assets
20. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. Where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. Where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
Page 3 of 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Referral Agency Response - Planning RAP21 0015Related documentApplication case desk ↗
About this file
- File size
- 126 KB (small file)
- File type
No other editions are linked here.