Skip to the record
The gold standard in government transparency.

Original source · versioned page text

21-0288-FS001-V2_GlenridgeDr_FS-reduced

of 70

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (42.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 63, section 1. The text section number identifies this passage in the reader.

                                                                     DFE or DSTE based on:-
                                                                     (i)   current climate conditions; and
                                                                     (ii) incorporating an allowance for the
                                                                           predicted impacts of climate change at the
                                                                           year 2100;
                                                                     (iii) catchment conditions relevant at the time
                                                                           of upstream or downstream development;
                                                               (c) no earthworks (including filling of land or
                                                                     reduction of flood storage capacity) occurs,
                                                                     unless:-
                                                                     (i)   such earthworks result in the rehabilitation
                                                                           and repair of the hydrological network and
                                                                           riparian ecology of a waterway; and
                                                                     (ii) an assessment undertaken by a
                                                                           competent person demonstrates that
                                                                           reforming of the land does not negatively
                                                                           impact on the overall hydrology, hydraulics
                                                                           and flood capacity of the waterway and
                                                                           does not, in any way, result in the reduction
                                                                           of flood storage capacity on the site; or
                                                                     (iii) such earthworks relate to improving
                                                                           drainage in a drainage deficient area, as
                                                                           identified on Figure 8.2.7 (Drainage
                                                                           deficient areas), and are undertaken in
                                                                           accordance with a current drainage
                                                                           deficient area flood
                                                             information certificate issued by the Council.
PO10                                                         AO10
  Development does not increase the severity of storm          Development does not involve any physical alteration        Development is rural residential development that has
  tide related impacts for off-site property for all storm     to the storm tide inundation area, including vegetation     aimed to not impact the existing drainage systems that
  tide events up to and including the DFE or DSTE,             clearing.                                                   influence the site. Non-worsening and no off-site
  based on:-                                                                                                               impacts have been achieved for the site.
  (a) current climate conditions; and                         OR
incorporating an appropriate allowance for the
predicted impacts of climate change at the end of the         Development avoids or, where avoidance is not
design life of the development.                               possible, minimises alterations to the site that would
                                                              result in:-
                                                              (a) acceleration or redirection of flows towards
                                                                    neighbouring infrastructure and development;
                                                              (b) increased local water levels; or
                                                              (c) increased breaking wave heights.
Log in to download the original file

21-0288-FS001-V2_GlenridgeDr_FS-reduced.pdf · 42.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.