NO LIQUEFACTION COMPACTION
WITHIN 5m OF RIP ZONE
BIORETENTION BASIN '1
'REFER WQ01 FOR DETAILS RIP ZONE
EMERGENCY PROPOSED DRAINAGE
TANK OVERFLOW LOW FLOWS (BELOW 3 PROPOSED RAPID
FFL 12.0 RL11.57 MONTH FLOWS) TO INFILTRATION CULVERT
OUTLET TO SURFACE
WEIR LEVEL IL11.41 LEVEL OF BIO BASIN 1.5m TOP OF WALL RL11.20
STANDING WATER LEVEL RL11.21 IL11.21
WEIR RL10.85 PROPOSED ROCK PRIVATE OPEN
RWHT RL10.75
GABION WALL SPACE
RAINWATER HARVESTING TANK BIO RL10.45 HEIGHT VARIES
LEVELS VARIES CONSERVATION
300m3 (MIN) CAPACITY TO RL8.5 TO 11.2 0m TO 2.70m PROTECTION
0.3m
1.2m
HYDRAULIC CONSULTANTS DETAILS BIO DRAINAGE RL 9.65 WATERWAYS
TANK BASE RL9.40 IL9.25 TOP ROCK RL9.25
BASE ROCK RL8.95
20m2 GEOFABRIC
LINED FOREBAY
PROPOSED DRAINAGE HIGH FLOW IMPERVIOUS MEMBRANCE TO
PIPE (ABOVE 3 MONTH AR1 FLOWS) INTERNAL FACES OF GABION WALLS
TO BE PIPED DIRECTLY TO RIP'S (TYP)
SECTION 1
SCALE 1:50 A1 D09
EMERGENCY OVERFLOW WEIR CALC (Q100)
1
ROOF TO RWHT/RIC CATCHMENT = (360) * (332mm/hr * 1.2) * 1.0 * 0.7532Ha = 0.834m3/s
-
APPROVED PLAN
OPW25/0042
NOOSA COUNCIL
23 SEP 2025
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL
A.B.N. 91 611 354 511 RAPID INFILTRATION CULVERT 'RIC' SECTION
FOR APPROVAL Date: AUG 2022 26 Memorial Avenue, Cotton Tree PROPOSED HOTEL
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at 3-7 SERENITY CLOSE, NOOSA HEADS DRAWING No:
A6769-24-D10 A 10 of
STEVEN HARRISON
Email: [email protected]
A 27/02/2025 ISSUE FOR APPROVAL PL S.H.
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for CALILE MALOUF INVESTMENTS
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE FILENAME : a6769-24-D10 RIC SECTION.dwg - DATE : 27/2/25 - 4:04pm - XREF's: H-Approved-SH; H-Checked-SH Council Ref:
Document Set ID: 23646597
Version: 1, Version Date: 21/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERDEDED NEGOTIATED - OPW25 0042 - Approved Plans (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 36.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.