Original PDF page 1, section 3. The text section number identifies this passage in the reader.
| | |
LE 0 OPERATION ARE TO BE RECTIFIED BY THE SHEET PILING CONTRACTOR.
0
1 MANUFACTURERS SPEC
| | |
2
| | | |
13
|
| |
| | |
D .8 · THE SHEET PILING CONTRACTOR IS TO ASSESS THE LIKELIHOOD OF VIBRATION
| |
PA 11
| |
5m
|
| | |
| |
| |
14 DAMAGE OR OTHER DEGRADATION OF ADJACENT STRUCTURES, SERVICES ETC DUE
| |
|
ExRL1
RL
5m
11
||
| |
8.0 | S|
| |
STABILISED
| | | | L TO SHEET PILING OPERATIONS. ANY SUCH DAMAGE INCURRED IS TO BE RECTIFIED
VE
||
ExRL1
|
| | |
7.2
EW16.4 5 LE 5
| |
AT THE SHEET PILING CONTRACTOR'S EXPENSE.
|
BATTER 11
|
5
15
|
D .0 NT
||
|
1 IN 4 MAX PA 11 · THE SHEET PILING CONTRACTOR'S ENGINEER WILL PREPARE AND CERTIFY WORK
| |
ME 10
| |
ExRL1
16 RL E PRIVATE OPEN SPACE 11
| |
AS METHOD STATEMENTS WHICH DETAIL SEQUENTIAL PROCESSES FOR:
17.0 7
| |
TEMPORARY FB
| |
CH EO
CONSERVATION - SHEET PILE INSTALLATION
|
160 10
| |
BATTER
| |
LIN PROTECTION WATERWAYS - EXCAVATION
12
| |
.00
|
1 in 2 MAX 9 - ANCHOR INSTALLATION, TENSIONING & GROUTING
| |
| |
ExRL1 16
| |
9
| | |
6.0
W
· ALL WORKS SHALL BE CARRIED OUT INACCORDANCE WITH THE WORK METHOD
LEGEND
| |
STATEMENT
|
| |
S
| | | | | | | | | | | | |
10 · SHEET PILES TO BE INSTALLED PLUMB & WITHIN 50mm OF DESIGN PLAN ALIGNMENT
| |
CH ExR 13
| |
169L15.0 PROPOSED EARTHWORKS FILL · VIBRATION MONITORING IN ACCORDANCE WITH AUSTRALIAN STANDARDS TO BE
ExRL1
| |
.23 4.25 CARRIED OUT DURING ALL SHEETPILING AND ANCHORING OPERATIONS.
.5
| |
14
6 EW13.3
15
11
EW13.8 · MAXIMUM VIBRATION LIMITS OF 5MM/SEC TO BE ACHIEVED FOR ADJACENT
>
| |
|
| | | | |
| | | |
9
''EMERALD'' BUILDING
| |
L
|
| | | | | 9 PROPOSED EARTHWORKS CUT
VE
W
4| |
>
ExRL1 | | 1|
|
| |
4.0 | | |
|
LE
| | · CONTRACTOR TO INDEMNIFY PRINCIPLE AGAINST ANY ACTIONS ARISING FROM
| |
|
|
ON
| |
D .80 STRUCTURAL OR COSMETIC DAMAGE TO ''EMERALD'' BUILDING DUE TO
| |
W |
TI F
| | |
15
|
| PA 11 | | 300 THK BUILDING PLATFORM HARDSTAND.
|
L A C O | | CONSTRUCTION OPERATIONS.
|
|
| R TYPE 2.5 CBR15. LIQUEFACTION COMPACTION.
2F m | | | |
5m
U1E IN 5
5
| | | |
|
|| |
REFER SITE PREPARATION NOTES.
14.
NOTE:
S
Q | | | |
LI ITH
NT
D ROCK GABION WALL. REFER
|
|||
| | | |
0
ME
NO W | | 150 THK BUILDING PLATFORM HARDSTAND.
| |
.5
|
| ||
DRAINAGE DRAWINGS FOR DETAILS ALL SERVICES TO BE LOCATED BY CONTRACTOR ON SITE PRIOR TO CONSTRUCTION. ANY
L13
| | | |
Y ON
SE
|
W
| ||
S
L | | | | TYPE 2.5 CBR15. LIQUEFACTION COMPACTION.
W
R
I
14
||
CT T DAMAGE TO EXISTING SERVICES TO BE RECTIFIED AT CONTRACTORS EXPENSE.
A
| |
|
Ex
|
| |
FB
RI AC E
|
| | | | REFER SITE PREPARATION NOTES.
| ||
10
| |
ST MP ON
| |
EO
|
|||
| |
13.5
D | |
PROPOSED TOP OF BATTER
CO C Z
| | | | | | | | | | | | | |
13 | |
S
150 THK TEMPORARY HARDSTAND.
|
| |
|||
LIN
|| | | | |
| |
RI
|
|
|| | | | | | | TYPE 2.5 CBR15.LIQUEFACTION COMPACTION PROPOSED TOE OF BATTER
EXTENT OF TEMPORARY || | |
| | | | 8
13
W
1 IN 2 BATTER BASE
OF
|| | |
|| | |
| |
| |
1|1 |
|
|
NOT REQUIRED. TAKE UP PRIOR TO SOFT
RL13.0 PMT
9 LANDSCAPING. TRESS TO BE RETAINED
S
|| | See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERDEDED NEGOTIATED - OPW25 0042 - Approved Plans (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 36.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.