Council archive · source document
SUPERDEDED NEGOTIATED - OPW25 0042 - Approved Plans (As Published) · OPW25/0042
Plans and drawings: the text below has words only, no drawings.
Very large file (36.5 MB): may take a few minutes to open.
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
S
LEGEND
APPROX. LOCATION OF EXISTING Ø150 PROPOSED EARTHWORKS FILL
S
SEWER MAIN. SEWER TO BE
ACCURATELY LOCATED VIA VACUUM
EXCAVATION & SURVEY PRIOR TO PROPOSED EARTHWORKS CUT
OUTSIDE OF BUILDING ENVELOPE (TYP)
BUILDING PLATFORM HARDSTAND
COMMENCMENT OF WORKS
300 THK BUILDING PLATFORM HARDSTAND.
W
TO EXTEND 1.0m (NOM)
TYPE 2.5 CBR15. LIQUEFACTION COMPACTION.
D
REFER SITE PREPARATION NOTES.
EW03
EW03
EW04
S
EW03
SERENIT
B
A
D
C
Y CLOSE 150 THK BUILDING PLATFORM HARDSTAND.
W TYPE 2.5 CBR15. LIQUEFACTION COMPACTION.
W
S
W REFER SITE PREPARATION NOTES.
D W
W 150 THK TEMPORARY HARDSTAND.
19.5
20.5
CH0.00 TYPE 2.5 CBR15.LIQUEFACTION COMPACTION
20
21
NOT REQUIRED. TAKE UP PRIOR TO SOFT
S
21.5
W
LANDSCAPING.
S
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
W
||
| | |
150 THK TEMPORARY HARDSTAND.
S
| | | | | || |
TYPE 2.5 CBR15.LIQUEFACTION COMPACTION
|
EW19.0
| | |
5 NOT REQUIRED. TAKE UP PRIOR TO SOFT
D
LANDSCAPING.
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | |
|
PAD LEVEL | | | | | |
| |
|
19 |
300 THK TEMPORARY HARDSTAND OVER
| | | S| | | | | | | | | | | | | | | S| | | | | | | | | | |
RL18.4
| |
S
| | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | SEWER/STW.
|
| | | | | | | | | | | | | | | | | | | | | |
| | | | | | |
| | | | | | | | | | | | | | | | | | | | |
W
|
|
| | TEMPORARY TYPE 2.5 CBR15. LIQUEFACTION COMPACTION
| | | | |
|
||
S
| |
|
| |
| | | | | BATTER NOT REQUIRED. TAKE UP PRIOR TO SOFT
| | | | | | | | |
|
CH20.00 |
1 in 2 MAX
| | | | | | | | | | | | LANDSCAPING.
|
D
| | | | | | | | | | | | | |
PAD LEVEL TEMPORARY
21
PAD LEVEL PAD LEVEL 8.90 PROPOSED EARTHWORKS LEVEL
RL17.55 BATTER RL21.30 RL21.55 21.5
S
20
1 in 2 MAX SHEET PILING TO MANUFACTURERS
TEMPORARY
19
JOINS TO EW01
TEMPORARY DESIGN & CERTIFICATION.
BAN RT
BATTER
S
COU
BATTER
1 in 2 MAX | | | | | | | | | | | | | |
PROPOSED TOP OF BATTER
1 in 2 MAX
CH
PROPOSED TOE OF BATTER
KSI
W
40 S
| LINE OF BASEMENT EXISTING SURFACE CONTOUR
.0
|
EW18.2
A
|
0 | |
E EXISTING ELECTRICAL RETICULATION
0
| |
| |
T SHEET PILING TO
D
| |
EN MANUFACTURERS SPEC
T EXISTING TELSTRA RETICULATION
EM
| |
S
AS
|
ExRL1 D EXISTING STORMWATER DRAINAGE
FB
W
8.30
EW17.0
E O SHEET PILING TO
0 W EXISTING WATER RETICULATION
LIN TEMPORARY
W
MANUFACTURERS SPEC PAD LEVEL PAD LEVEL
BATTER RL11.42 S EXISTING SEWER RETICULATION
LINE OF BASEMENT
S
1 in 2 MAX RL11.42 S
ALL BATTERS TO BE LINED WITH
19
21
18 | | | | | | | | | | | | | | | | | | | |
D
L
| | | | | | | | | | | | | | | | | | | | | |
BIDIM A14 GEOFABRIC. BATTER
| |
VE TRESS TO BE RETAINED
20
| |
LE 5 | |
SHEET PILING TO
D .5
| |
GRADIENTS TO BE CONFIRMED BY
PA 11 W
| |
MANUFACTURERS SPEC 21
RL GEOTECHNICAL ENGINEER'S ONSITE
|
|
| |
| | EXISTING SEWER TO BE
|
| |
TAKEN UP
ALL BATTER GRADIENTS
|
21 TO BE CONFIRMED BY
| |
W
| |
21
GEOTECHNICAL
| |
>
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERDEDED NEGOTIATED - OPW25 0042 - Approved Plans (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 36.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.