Council archive · source document
SUPERDEDED NEGOTIATED - OPW25 0042 - Approved Plans (As Published) · OPW25/0042
Plans and drawings: the text below has words only, no drawings.
Very large file (36.5 MB): may take a few minutes to open.
Original PDF page 41, section 1. The text section number identifies this passage in the reader.
8.2 QUALITY MUSIC MODEL RESULTS
The results of the Quality MUSIC model are shown in Table 8.2 below.
Flow TSS TP TN Gross
ML/y Kg/y Kg/y Kg/y Pollutant
Kg/y
Source Load 19.32 1035 3.825 40.27 414.6
Residual Load 14.86 181.2 1.239 19.48 0
% Reduction 23.06 82.48 67.6 51.62 100
%Target Reduction - 85 60 45 90
Table 8.2 Treatment Train Effectiveness
Inspection of Table 8.2 shows that the target pollutant load reductions will be
achieved for the developed site.
9.0 SYSTEM MAINTENANCE
RIPs/RICs, bioretention basins and the rainwater harvesting tank will be
subject to routine inspection and maintenance by the hotel’s maintenance
team and such maintenance is critical to their ongoing function.
Failure to carry out such maintenance could result in system failures,
environmental harm and surcharge of infiltration pits and culverts.
A recommended maintenance schedule for elements of the water quality
treatment and train and infiltration devices appears at Appendix F.
__________________________________________________________________________
A6769/25/SWMP/Rev OpW(A) – Feb 2025
Page 18 of 9
SH/PL
Brah101 Pty Ltd t/as ALTA PROJECTS
Document Set ID: 23646596
Version: 1, Version Date: 21/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERDEDED NEGOTIATED - OPW25 0042 - Approved Plans (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 36.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.