Attachment 6b - Ecological Assessment Part 2 · MCU18/0015
Attached to the e-mail Response to Information Request (Ecological Assessment Part 2) MCU18/0015 & RAL18/0001.
Ecological Assessment – Attunga Heights
Performance outcomes Acceptable outcomes Response Comment
AO24.2 Clearing in essential habitat does not RE 12.2.5 is mapped as containing Essential
exceed the widths prescribed in table 16.3.1 of Habitat for the Glossy black cockatoo. The
this code. Regional Ecosystem Description Database notes
the structure of this RE as mid-dense. Therefore,
OR in accordance with table 16.3.1 of the code,
clearing of Essential Habitat (i.e. RE 12.2.5) is
limited to 10 m in width.
The width of RE 12.2.5 to be cleared exceeds 10
m in width.
AO24.3 Clearing in essential habitat does not In accordance with table 16.3.1 of the code,
exceed the areas prescribed in table 16.3.1 of clearing of Essential Habitat (i.e. RE 12.2.5) is
this code. limited to less than 0.5 ha (i.e. 0.39 ha in total).
OR
AO24.4 Where clearing cannot be reasonably Not applicable.
avoided, and clearing has been reasonably
minimised, an offset is provided for any
acceptable significant residual impact from n/a
clearing of essential habitat (a matter of state
environmental significance).
Acid sulfate soils (public safety and relevant infrastructure activities, coordinated project, extractive industry, high value agriculture clearing, irrigated high value
agriculture clearing, necessary environmental clearing, necessary to control non-native plants or declared pests, thinning, encroachment)
AO27.1 Clearing does not occur in land zone 1, Clearing will occur on land zone 2.
PO27 Clearing does not result in, or
land zone 2 or land zone 3.
accelerate, disturbance of acid sulfate soils
or changes to the hydrology of the location OR
that will result in either of the following:
AO27.2 Clearing in land zone 1, land zone 2 or Clearing will not occur below 5m AHD.
1. aeration of horizons containing iron land zone 3 in areas below the five metre
sulphides; or Australian Height Datum only occurs where:
2. mobilisation of acid or metals. 1. it does not involve mechanical clearing; and
Job No: Q12038/RW3 JWA Pty Ltd 92
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6b - Ecological Assessment Part 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.