Attachment 6b - Ecological Assessment Part 2 · MCU18/0015
Attached to the e-mail Response to Information Request (Ecological Assessment Part 2) MCU18/0015 & RAL18/0001.
Ecological Assessment – Attunga Heights
Specific Outcomes Probable Solutions Response
b) installing protective fencing around the
dripline of the vegetation and avoid filling
and excavation in these fenced areas; and
c) ensuring stock piling, storage and vehicle
parking occur outside the identified
vegetation areas;
AND
14.4 Low impact construction techniques are
used around vegetation to minimise interference
with the vegetation.
Filling and excavation
O15 Vegetation is not adversely impacted upon by No solution provided. A Stormwater Management Plan will be prepared
earthworks and changes to the hydrological in order to ensure that vegetation is not impacted
regime, including changes to ground water levels, by changes to hydrological regimes.
flooding levels, run-off and tidal hydraulics.
13.10 Vegetation management
Replanting and rehabilitation
O16 Development provides for ecologically S16.1 Landscaping and rehabilitation Rehabilitation works, including weed removal and
important areas to be restored and enhanced complements and supports ecologically important replanting of native species, will be undertaken
through the following measures— habitats by by— as part of the proposed development. A Site
a) siting landscaped areas to complement and a) utilising native plants of local origin; Rehabilitation Plan will be prepared for Council’s
enhance existing vegetation; b) utilising suitable plant species identified in approval prior to commencement of site works.
b) removal of all species likely to displace native PSP3 – Landscaping Plants and Guidelines; The Plan will require that plants used are of local
flora species or degrade fauna habitat; c) replicating adjacent remnant habitats, provenance and of species appropriate to local
c) replanting and rehabilitating16 degraded including understorey vegetation; habitat types.
habitat; and d) creating or enhancing linkages between
d) replacing any vegetation removed with suitable existing habitats; An appropriate number of replacement plantings
replacement vegetation of local origin. will be provided within the riparian corridor in
conjunction with weed control works.
Job No: Q12038/RW3 JWA Pty Ltd 103
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6b - Ecological Assessment Part 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.