Performance
Our Performance
Summary
Over the last year, we have been impacted by several In response to these factors, we have carefully
Status of Initiatives by Corporate Theme
factors in our operating environment which provide monitored project planning, reviewed the timelines
both opportunities and challenges. Despite this we of some initiatives and worked to develop our
Status Environment Liveability Prosperity Future Excellence Total
have continued to deliver quality services to the capabilities with a focus on our people, financial
community and successfully delivered or progressed sustainability, our business processes and systems,
Complete 20 18 10 6 10 64
a large number of initiatives. and our community.
These factors include: On Track 7 9 8 11 6 41
— The Local Government Elections conducted on 16 How are we tracking?
March 2024 and the deferment of some decisions Minor Disruptions 3 7 2 6 11 29
until the commencement of the new Council which Council’s Operational Plan 2023-24 contains 154 initi-
has affected the progress of some major initiatives. atives/projects aligned to the Themes of our Corpo- Major Disruptions 2 7 1 5 5 20
—A ‘hot’ construction sector with high growth (approx. rate Plan 2023-28. An initiative may relate to broader
9% in 2023) and characterized by labour shortages, Total 32 41 21 28 32 154
and long-term efforts aimed at achieving a specific
material supply constraints and high construction goal or vision (in this case the initiative may be staged
costs. greater than a year) or a specific project with defined
64 initiatives are Completed (42%) had dependencies that impacted progress,
—C ost increases across a range of infrastructure and objectives and deliverables.
resourcing constraints including vacancies
98 services as measured by the Council Cost Index 99
41 initiatives are On Track (27%) in key positions, the need for higher levels of
(CCI). In 2023-24 the CCI was 4.4% on top of a 6.9% Overall, most initiatives are either ‘complete’ at 42%
• Of the 41 initiatives On Track, 35 were not community consultation than was planned for
increase in the previous year. or ‘on track’ at 27% with 19% experiencing a ‘minor
completed, continue to progress, and were (e.g., the Noosa River Management Plan, Noosa
— Council’s success in securing substantial grant disruption’ and 13% a ‘major disruption’.
relisted in the new FY24/25 Operational Plan Planning Scheme amendments), competing
funding of $14.7M (Operating and Capital Grants) as
while six (6) were absorbed into ongoing priorities and changes in Council’s direction.
well as $127M (QRA Disaster Recovery from 2022
service delivery past 30 June 2024.
flood event) which expanded the capital program
• Reasons include - the scope of the initiative 20 initiatives have Major Disruptions (13%)
and increased pressure on project management
with delivery staged across more than one • Of the 20 initiatives experiencing a ‘major
services.
year, not planned to commence until later in disruption’, 11 have commenced and were
—C ommunity expectations with an increased focus on
the year or the timeline for the initiative was completed as planned, nine (9) were not
community consultation and engagement.
rescheduled/extended. commenced, 19 were relisted in the new
— Recruitment challenges with it taking longer to
FY24/25 Operational Plan, and one (1) is to be
recruit key positions.
29 initiatives have Minor Disruptions (19%) newly added to the FY24/25 Operational Plan
—H igh employee turnover and a competitive labour
• Of the 29 initiatives commenced, 24 for future reporting.
market.
experienced a ‘minor disruption’ and were not • Reasons include - the initiative was impacted by
Noosa Council Annual Report 23/24
—A n ambitious Corporate Plan in addition to the
completed as planned, 25 were relisted in the the scope of the initiative with delivery staged
implementation of various key strategies and plans.
new FY24/25 Operational Plan, two (2) were beyond one year, an unforeseen matter which
—O rganisational change with amendments to the
absorbed into ongoing service delivery past 30 seriously impacted the timeline, insufficient
organisational structure and transitional leadership
June 2024, and two (2) are to be added to the resources were available to progress the
arrangements.
FY24/25 Operational Plan for future reporting. initiative as planned, environmental factors,
—C ompeting priorities and resourcing constraints
• Reasons include - the initiative was impacted technical difficulties, dependencies that
which have impacted the delivery of some initiatives
by an unplanned event which affected the impacted progress, competing priorities and
and increased pressure on service areas.
timeline, was staged across more than one year, changes in Council’s direction.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.