                                                                                                                                                                                                                                                  Our Performance
      Capital Works Projects                                                                                                 Disaster Recovery Works Projects
                                                                                                                   Project                                                                                                              Project
      Project Name                 Brief description
                                                                                                                   budget    Project Name               Brief description                                                               budget
                                                                                                                                                                                                                                        (REPA)
      NDSC Stage 1 McKinnon        The Noosa District Sports Complex received an upgrade including four            $1.95m
      Drive Community Sports       change rooms, a kitchen, six unisex toilets, storage space, first aid and                 Kin Kin, Upper Pinbarren   This road sustained damage at three locations in the 2022 major storm event.    $1.4m
      Complex                      umpire rooms, large multi-purpose area and pickleball courts. These                       Creek Rd waterway          This reconstruction project replaced the old culverts and road surface at two
                                   facilities will support several sports clubs currently based at the complex               crossing remediation       sites on this road.
                                   including Tewantin Noosa Cricket Club, Noosa District Netball Association,
                                   and Noosa Beach Classic Car Club, with the opportunity to welcome new                     Noosa Heads, Weyba         This site sustained damage in the 2022 major storm event. This road             $0.5m
                                   sports such as pickleball to the site.                                                    Esplanade landslip         reconstruction project used bored piles and blocks to create a stable
                                                                                                                             remediation                embankment allowing the road surface to be repaired.

                                                                                                                             Pomona, Bakers Rd          This site sustained damage in the 2022 major storm event. This road             $0.4m
                                                                                                                             landslip remediation       reconstruction project saw the upslope embankment through excavation
                                                                                                                                                        and rock placement. Additional drainage was included.


      Disaster Recovery Works Projects                                                                                       Ridgewood, Old             This site sustained damage in the 2022 major storm event. This road             $1.0m
                                                                                                                             Ceylon Road landslip       reconstruction project used bored piles and concrete wall to create a stable
                                                                                                                   Project   remediation                embankment allowing for additional drainage to be constructed and the
      Project Name                 Brief description                                                               budget                               road surface to be repaired.
                                                                                                                   (REPA)
                                                                                                                             Happy Jack Creek Road,     This site sustained damage in the 2022 major storm event. This road             $1.4m
      Black Mountain, Black        Three small landslips resulted from the 2022 major storm event at various       $1.6m     Ridgewood landslip         sustained damage at three locations in the 2022 major storm event. This
      Mountain Rd landslip         locations on this road. They were stabilised by excavating benches, repairing             remediation                road reconstruction project had excavated slopes and block retaining wall
      remediation                  drains, adding rock. The road surface was then repaired.                                                             constructed along with drainage structures to create a stable embankment
                                                                                                                                                        allowing the road surface to be repaired.
132                                Note: this is not the large landslide. Works are still in progress.                                                                                                                                            133


      Black Mountain, Cooroy       This road sustained damage at three locations in the 2022 major storm           $3.6m
      Belli Creek Rd landslip      event. This road reconstruction project used bored piles and soil anchors to
      remediation                  stabilise the area. The road surface was rebuilt, and guardrail added.

      Cooran, Shreibers Road       These roads sustained damage at 4 locations in the 2022 major storm event.      $2.7m
      and Coles Creek Road         The reconstruction replaced the old culverts and pipes and repaired road
      waterway crossing            surface.
      remediation

      Cooroy, Cooroy Belli         This road sustained damage at three locations in the 2022 major storm event.    $2.0m
      Creek Rd landslip            This road reconstruction project used bored piles and blocks to create a
      remediation                  stable embankment allowing the road surface to be repaired.

      Cootharaba,                  This road sustained damage at three locations in the 2022 major storm           $3.3m
      Cootharaba Road              event. This road reconstruction project used bored piles and soil anchors to
      landslide remediation        stabilise the area. The road surface was repaired.




                                                                                                                                                                                                                                                  Noosa Council Annual Report 23/24
      Cootharaba, Simpsons         This road sustained damage at three locations in the 2022 major storm event.    $0.9m
      Road landslide               This road reconstruction project used bored piles to stabilise the slope. The
      remediation                  road surface was repaired.

      Kin Kin, Gully Gully Road,   This road sustained damage at three locations in the 2022 major storm event.    $1.3m
      waterway crossing            This reconstruction project replaced the old culverts or pipes and road
      remediation                  surface at three sites on this road.
Log in to download the original file

Annual Report 2023-24(PDF, 13MB).pdf · 13.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.