Council archive · source document
Annual Report 2023-24
Very large file (13.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 92, section 1. The text section number identifies this passage in the reader.
Invitations to
Trunk Infrastructure
Governance and Disclosures
The following table outlines the trunk infrastructure that was funded through infrastructure charges for this
Change Tender
reporting period.
Description Network Locality Delivery Method Value ($’000)
For the period, there was one (1) reportable invitation made by Council to change tender for Tender CN00427 Garth Upgrade existing Transport (Pathways) Peregian Beach Developer 3.1
Prowd Bridge Upgrade, where scope was reduced prior to inviting for any program and/or cost impacts. trunk footpath along
frontage
Funding of load Transport, Public Parks, Various Council 1,089.7
Infrastructure
repayment costs Stormwater
associated with
loan funds raised
Charges
historically to
construct trunk
infrastructure in the
Noosa Shire
Upgrade to bus stop Transport (Bus Stop) Tewantin Council 32.0
Under Queensland infrastructure charges legislation, Council levies infrastructure charges on development approvals.
They can be collected in the form of monetary contributions, or in some instances in the form of physical trunk Upgrade to bus stop Transport (Bus Stop) Cooroy Council 22.4
infrastructure in lieu of paying the charge. The timing of money contributions received may differ from the timing of when
Upgrade to bus stop Transport (Bus Stop) Tewantin Council 62.1
the infrastructure is constructed, and any unspent funds are held by Council in reserve for that purpose in future years.
Upgrade to bus stop Transport (Bus Stop) Tewantin Council 53.2
182 Council’s planning scheme identifies the particular trunk infrastructure which can be funded through infrastructure 183
charges in its Local Government Infrastructure Plan (LGIP). The table below summarises the infrastructure charges Upgrade to bus stop Transport (Bus Stop) Tewantin Council 34.8
revenue and expenditure for the reporting period. In accordance with the Planning Regulation 2017, full details of
Rufous St Public Parks Peregian Beach Council 2.5
infrastructure charges are provided on Council’s website. Community Facility
Redevelopment
Noosa Leisure Centre Public Parks Noosaville Council 98.4
Infrastructure Charges Summary for the period 1 July 2023 to 30 June 2024
Upgrade (Masterplan)
Apex Park – Noosaville Public Parks Noosaville Council 8.0
Upgrade to facilities
Infrastructure charges revenue Infrastructure charges revenue expenditure
and fitness equipment
Tewantin Doonella Transport (Roads) Tewantin Council 94.0
Total amount of Total amount of Total amount of Total amount of Total amount Bridge
infrastructure infrastructure infrastructure infrastructure of unspent
Cooroy Hinterland Public Parks Cooroy Council 33.4
charges revenue charges that charges revenue charges that the infrastructure
Playground
collected (by way were offset (i.e., spent on the local government charges revenue
of infrastructure infrastructure supply of trunk refunded Cooroy Sports Public Parks Cooroy Council 8.2
Complex Upgrade –
Noosa Council Annual Report 23/24
charges levied) provided by a infrastructure
Planning and Design
developer in lieu of
paying the charge) Tewantin Noosa Public Parks Tewantin Council 467.8
District Sports
Complex – Building
$’000 $’000 $’000 $’000 $’000 Upgrade
Noosaville Foreshore Public Parks Noosaville Council 230.6
2,575.8 3.1 2,575.8 0.0 0.0
Land Use Master Plan
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.