Original source · versioned page text
Stormwater Management Report
The original of this document is very large (11.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 10, section 1. The text section number identifies this passage in the reader.
5 CO N CLU S IO N
This SWMP outlines how stormwater runoff from the site will be managed in order to not adversely
impact the receiving environment.
The proposed lawful point of discharge for the development shall be a stormwater infiltration pit at the
rear of the property. Stormwater detention is not considered to be required as the proposal is for a
residential dwelling on an existing lot. Stormwater runoff from the development site will need to be
collected on site and directed to the infiltration pit at the build phase to ensure no adverse impacts to
neighbouring properties as a result of the development.
The development site is considered to be flood free.
Stormwater treatment should be managed through the implementation of best management practices
on site. Based on the scale of the proposed development, and typical pollutants produced, these
measures are considered adequate.
By implementing the proposed stormwater management system, and providing adequate maintenance,
the downstream environment and neighbouring properties will not experience any adverse deterioration
of water quality as a result of the proposed development.
7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.