Stormwater Management Report

of 45

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

CO NT E NT S


1             INTRODUCTION ..................................................................................................................... 1
2             SITE DESCRIPTION ............................................................................................................... 1

2.1           Location and Land Use ............................................................................................................ 1

2.2           Lawful Point of Discharge ........................................................................................................ 2

2.3           Upstream Drainage Connection .............................................................................................. 2

2.4           Flooding ................................................................................................................................... 2

3             STORMWATER QUANTITY MANAGEMENT ........................................................................ 2
4             WATER QUALITY MANAGEMENT ....................................................................................... 2

4.1           Operational Phase ................................................................................................................... 2

4.2           Construction Phase ................................................................................................................. 3

4.2.1         Design Objectives .................................................................................................................... 3
4.2.2         Erosion and Sediment Control ................................................................................................. 5
4.2.3         Maintenance and Monitoring Requirements ............................................................................ 6
5             CONCLUSION ......................................................................................................................... 7
6             APPENDICES ..................................................................................................................... A-1

Appendix A – Erosion Hazard Assessment ........................................................................................ A-1

Appendix B – Preliminary Engineering Plans ..................................................................................... B-1

Appendix C – Site Survey & Architectural Drawings .......................................................................... C-1


List of Tables

Table 1 – Pollutants Typically Generated During the Construction Phase ............................................. 3

Table 2 – SPP Appendix 2: Part 1 Construction Phase – Stormwater Management Design Objectives
          ................................................................................................................................................. 3

Table 3 – SPP Appendix 2: Part 2 Construction Phase – Stormwater Management Design Objectives
         for Temporary Drainage Works ............................................................................................... 4
Table 4 – SPP Appendix 2: Part 3 Construction Phase – Stormwater Management Design Objectives
         for Emergency Spillways on Temporary Sediment Basins ...................................................... 5

Table 5 - ESC maintenance requirements. ............................................................................................. 6

List of Figures

Figure 1 – Indicative site location (Nearmaps, 2022) ............................................................................. 1




                                                                                                                                                         iii
Log in to download the original file

Stormwater Management Report.pdf · 11.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.