Stormwater Management Report

of 45

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 5, section 1. The text section number identifies this passage in the reader.

2. 2       Law fu l P oint of D is ch ar ge

Roofwater runoff from the existing dwelling is assumed to discharge to discharge to ground level and
sheet flow off site towards the coastal bushland.
The proposed lawful point of discharge for the proposed development shall be a constructed infiltration
pit at the rear of the site. Stormwater runoff from the proposed development shall be collected on site
and directed to the pit via the construction of new on site drainage. Refer to Appendix B for further
information regarding the proposed stormwater works for the development.

2. 3       Ups tr e am D r ain ag e C onne ct ion

The development site does not have any upslope properties unable to gravity drain to a lawful point of
discharge.

2. 4       Flood ing

The proposed development site is not impacted by any NC flood mapping and is therefore considered
to be flood free.

3      STO R M WAT E R Q UA N TIT Y M AN AG E ME NT


A detailed stormwater quantity analysis of the existing and developed site conditions has not been
undertaken as the proposal is for a residential dwelling on an existing residential lot without substantial
change in site impervious fraction as a result of the development.

4      W AT ER Q U AL IT Y M A NAG E M EN T


4. 1       O pe r at io na l Ph a se

The development is not required to meet the Queensland Government’s State Planning Policy (July
2017) as the site does not exceed the 2,500m2 minimum site area. However stormwater quality
management must still be undertaken via the application of best management practices (BMPs) to
ensure no adverse impacts to the downstream environment.

Pollutants typically generated during the operational phase of the development include:

       •    Litter/gross pollutants;

       •    Sediment;

       •    Nutrients (N & P);

       •    Hydrocarbons (oils and grease); and

       •    Heavy metals.

Stormwater quality best management practices may be implemented for the development as follows:

       •    First flush diversion system for roof water diverting the roof water for irrigation purposes

       •    Rainwater storage tanks may be used to collect rainwater for landscape irrigation.

Best management practices have been deemed sufficient for the site area and land use. Refer to
Appendix B for the stormwater management drawing.




                                                                                                           2
Log in to download the original file

Stormwater Management Report.pdf · 11.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.