Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2016-11-14 General Committee Meeting Notes

of 30

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


         General Committee
              Meeting


             Monday, 14 November 2016

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Jess Glasgow, Ingrid Jackson,
             Joe Jurisevic, Frank Pardon, Brian Stockwell, Tony Wellington



   “Engagement with our community to protect and enhance our lifestyle”
Log in to download the original file

2016-11-14 General Committee Meeting Notes(PDF, 6MB).pdf · 5.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 29 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                                              14 NOVEMBER 2016


TABLE OF CONTENTS

ITEM                                                                                        PAGE


ATTENDANCE & APOLOGIES                                                                           -

PRESENTATIONS                                                                                    -

ITEMS REFERRED FROM PLANNING & ENVIRONMENT COMMITTEE                                             -

ITEMS REFERRED FROM SERVICES & ORGANISATION COMMITTEE                                           2
1      COUNCIL POLICY - TRANSPORT STRATEGY
       (Refer Services & Organisation Committee Agenda, 8 November 2016, Item 8, Page 46)
       Reason for referral – Cr Stockwell requests that consideration be given to including
       motor scooters in the Policy as a lower emissions, congestion reducing form of
       transport.

REPORTS DIRECT TO GENERAL COMMITTEE                                                              3

2      2015/16 BUDGET WRAP UP                                                                    3

3      FINANCIAL PERFORMANCE REPORT OCTOBER 2016                                                 9

4      SEPTEMBER QUARTER BUDGET REVIEW (BR2)                                                   15

CLOSED SESSION                                                                             -




                                                                                      Page 2 of 30

Section 3

GENERAL COMMITTEE MEETING AGENDA                                                    14 NOVEMBER 2016


REPORTS DIRECT TO GENERAL COMMITTEE


2                       2015/16 BUDGET WRAP UP
OCUMENT INFORM AT ION




Author                          Director Corporate Services, Michael Shave
                                Corporate Services Department

Index                           ECM/ ECM / Subject / 22.09 – Monthly Financial Performance Report

Attachments                     Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Director Corporate Services to the General Committee
Meeting dated 14 November 2016 providing a summary of Council’s 2015/16 budget
performance.


REPORT
As part of standard monthly financial performance reporting against budget, a report was
provided to the General Committee on 18 July 2016 outlining Council’s interim financial
performance for the full 2015/16 year against budget. Now that the financial statements and
annual report has been completed it is timely that Council is provided with a final summary of
overall performance against budget. A budget wrap up report is considered necessary given that
the detail in the financial statements is different to that reported in the budget reports and
includes adjustments that make it difficult to assess Council’s overall performance against
budget.

Overall Operating Performance

Operating financial performance relates to the business as usual services provided by Council to
the community and excludes the capital program. From a financial sustainability perspective an
operating surplus reflects the fact that services are being appropriately funded and sufficient cash
is being collected to reflect infrastructure consumption (and as such is allowing for ongoing asset
renewal via the capital program).

The table below outlines Council’s operating performance against budget once all year end
adjustments were processed.

         Operating Summary to 30 June 2016
                                        Budget              Actual   Variance $m    Variance
                                             $m                $m                          %
         Recurrent Revenue                $88.2              $90.2           $2.0       2.3%
         Recurrent Expense                $87.2              $83.9           $3.3       3.8%
         Operating Surplus                  $1.0              $6.3           $5.3
         Operating Surplus Ratio           1.1%              7.0%




                                                                                               Page 3 of 30

Section 4

GENERAL COMMITTEE MEETING AGENDA                                              14 NOVEMBER 2016


A breakdown of revenue and expense performance against budget will be provided further in this
report. Council has achieved another solid financial result for the year which reflects responsible
budget management by Council managers and staff on behalf of our community (which is
appreciated).

Council has met the requirements of its financial sustainability policy with respect to the operating
surplus ratio, with the ratio of 7% comfortably within the 0-10% target range set by the state
government.

Operating Revenue

Council achieved $90.2 million of operating revenue against budgeted revenue of $88.2 million
for the full year, reflecting the prudent budgeting approach adopted to manage any downside
revenue risk. A breakdown on each of Council’s revenue streams is contained in the following
table:

Table 1: Operating Revenue Performance by Type

    Revenue Type          Budget         Actual     Variance
                             $m             $m            $m
    Rates                  $60.5          $60.7          $0.2
    Fees                    $5.1           $5.7          $0.6
    Dividend                $1.9           $1.9          $0.1
    Tax                     $1.1           $1.1          $0.1
    Interest                $4.6           $4.9          $0.3
    Other                   $9.4          $10.7          $1.2
    Grants                  $5.7           $5.2        ($0.5)
    Total                  $88.2          $90.2          $2.0
Note: Some rounding


•     Rates and Levies – $60.7m of actual revenue was received against the annual budget of
      $60.5m. The majority of the additional revenue collected related to waste collection charges
      on additional properties.
•     Fees and Charges – Actual fees and charges collected of $5.7m exceeded budget by
      $600k. Planning related fees ($300k), parking fees ($115k), registration fees ($87k) and
      search fees ($96k) are some of the fee types that exceeded budget forecasts.
•     Interest Received – Interest earned of $4.9m exceeded budget by $340k. Interest revenue
      sources include Unitywater loans ($2.6m), interest on cash ($1.8m) and interest on overdue
      rates ($483k). Higher end of year cash balances as well as additional interest on overdue
      rates reflected the positive position against budget.
•     Dividend and Tax – Actual Dividend and tax payments from Unitywater of $3m met budget.
•     Other Revenue – $10.7m of actual other revenue was achieved against the annual budget of
      $9.4m. Other income streams that exceeded budget included waste disposal fees ($437k),
      ringtail quarry sales ($325k), holiday park fees ($183k), and other various community facility
      revenues (i.e. the J and Aquatic Centre).
•     Grants, Subsidies and Contributions – Operational grants of $5.2m were below the annual
      budget of $5.7m. The Translink contribution towards the deferred electric bus trial ($480k)
      was not received which reflected the variance.




                                                                                       Page 4 of 30

Section 5

GENERAL COMMITTEE MEETING AGENDA                                                                      14 NOVEMBER 2016


Figure 1: Operating Revenue Position by Type (Excluding Rates)
    Grants
    Other




                                                                     YTD Actual ($m)
    Tax




                                                                     YTD Budget ($m)
    Fees Dividend Interest




                 $0.0               $2.0        $4.0       $6.0        $8.0        $10.0    $12.0


Operating Expenditure
Council spent $83.9 million on its operating expenditure compared to the budget of $87.2 million
for the full year. A breakdown on each of Council’s expenditure sources is outlined below:

Table 2: Operating Expenditure Performance by Type

    Revenue Type                                Budget            Actual      Variance
                                                   $m                $m             $m
    Employees                                    $27.6             $27.8           $0.2
    Materials                                    $40.2             $35.7         ($4.5)
    Finance Costs                                 $2.7              $3.3           $0.6
    Depreciation                                 $16.6             $17.0           $0.3
    Total                                        $87.2             $83.8         ($3.4)
Note: Some rounding


•                            Employee Costs – Costs of $27.8m exceeded the $27.6m annual budget by $200k. Whilst
                             overall employee cost management was achieved at an operational level, movements in
                             provisions for annual and long service level provisions resulted in the budget being
                             exceeded (whilst having a negligible impact on current cash flows).
•                            Materials and Services – Actual costs of $35.7m for materials and services were incurred
                             compared to the budget of $40.2m. Of the $4.5m variance approximately $3m related to
                             levy expenditure which is restricted for future use (in particular public transport,
                             environment, heritage, main beach and Hastings St). The remaining positive variances
                             primarily relate to under-expenditure against contract services, in particular savings against
                             ICT costs ($138k); savings against fleet operations associated with lower fuel prices, lease
                             and insurance costs ($500k); waste management landfill and strategy costs ($1.1m).
                             Council did incur over expenditure in some areas in particular arborist services (due to
                             significant numbers of requests), street lighting, ringtail quarry cost of sales (offset by
                             revenue) and Respite Centre contract services.
•                            Finance Costs – Actual finance costs of $3.3m exceeded budget by $600k due to a year
                             end adjustment in the calculation to value Council’s future landfill rehabilitation provision (a
                             non-cash adjustment with the provision fund to be gradually cash backed over the life of
                             the landfill).

                                                                                                               Page 5 of 30

Section 6

GENERAL COMMITTEE MEETING AGENDA                                                                14 NOVEMBER 2016


•                     Depreciation – Actual depreciation expense exceeded budget by $300k reflecting the
                      outcomes of asset componentisation for roads and buildings, in addition to the bring
                      forward of the commissioning of cell 2.2 for use at the landfill (which was not anticipated for
                      2015/16).


Figure 2: Operating Expenditure Position by Type
       Depreciation




                                                        YTD Actual ($m)
    Finance
     Costs




                                                        YTD Budget ($m)
       Materials
       Employees




                      $0          $10          $20          $30           $40         $50


Capital Revenue

Recorded capital revenue for Council for 2015/16 totalled $8m against a budget of $7.3m. A
breakdown of capital revenue items appears in the table below:

Table 3: Capital Revenue Performance by Type

Revenue Type                                                Budget        Actual    Variance
                                                               $m            $m           $m
Developer Contributions                                       $2.6          $2.5       ($0.1)
Grants                                                        $4.8          $5.2         $0.4
Investment Property Revaluation                                 $-          $0.3         $0.3
Total                                                         $7.3          $8.0         $0.7
Note: Some rounding


The investment property valuation increase relates to the annual valuation required for the
Sunrise Shops which is based on a cash flow valuation methodology to comply with accounting
standards. As this is a non-cash movement it is not budgeted nor anticipated each year.

Capital Expenditure

Actual capital expenditure of $29m achieved 88% of the total budget of $33m (budget excludes
funds transferred to reserve for future use). $4m of works in progress were carried over to the
current 2016/17 budget.

Council’s actual asset sustainability ratio for the 2015/16 year was 88.36%, slightly below the
state government benchmark of 90% albeit higher than the 2014/15 ratio of 65.1%.


                                                                                                       Page 6 of 30

Section 7

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                                                                                                                                                                                                                                                                                                                14 NOVEMBER 2016


A breakdown of spend and also completion % per capital program is outlined in the graphs
below:

Figure 3: Capital Expenditure per Program ($’000)

 $14,000

 $12,000

 $10,000

  $8,000

  $6,000

  $4,000

  $2,000

     $0
                                                                              Commercial Land &…
                                              Coastal Canals and…




                                                                                                                                                                                                                                          ICT
                                                                                                                                    Corporate Buildings




                                                                                                                                                                                                                                                  Parks & Playgrounds


                                                                                                                                                                                                                                                                                                         Planning Scheme


                                                                                                                                                                                                                                                                                                                                                         Sealed Roads
                                                                                                          Community Facilities
                     Bridges




                                                                                                                                                                                                                 Holiday Parks




                                                                                                                                                                                                                                                                                                                                                                                         Stormwater Drainage
                                                                                                                                                                          Fleet & Plant
                                                                                                                                                                                             Gravel Roads
                                                                                                                                                          Environmental




                                                                                                                                                                                                                                                                                         Pathways




                                                                                                                                                                                                                                                                                                                                                                        Sports Grounds


                                                                                                                                                                                                                                                                                                                                                                                                               Streetscapes
                                                                                                                                                                                                                                                                                                                                                                                                                                         Transport
                                                                                                                                                                                                                                                                                                                                                                                                                                                             Waste
                                                                                                                                                                                                                                                                                                                                  Public Transport




Figure 4: Capital Expenditure Completion Rate per Program

 120%

 100%

  80%

  60%

  40%

  20%

   0%
                                                                    Commercial Land &…
                               Coastal Canals and…




                                                                                                                                                                                                                                            ICT
                                                                                                                                 Corporate Buildings




                                                                                                                                                                                                                                                                        Parks & Playgrounds



                                                                                                                                                                                                                                                                                                                           Planning Scheme



                                                                                                                                                                                                                                                                                                                                                                        Sealed Roads
                                                                                                   Community Facilities
           Bridges




                                                                                                                                                                                                                          Holiday Parks




                                                                                                                                                                                                                                                                                                                                                                                                                   Stormwater Drainage
                                                                                                                                                                             Fleet & Plant

                                                                                                                                                                                                  Gravel Roads
                                                                                                                                                          Environmental




                                                                                                                                                                                                                                                                                                    Pathways




                                                                                                                                                                                                                                                                                                                                                                                           Sports Grounds



                                                                                                                                                                                                                                                                                                                                                                                                                                              Streetscapes

                                                                                                                                                                                                                                                                                                                                                                                                                                                                Transport

                                                                                                                                                                                                                                                                                                                                                                                                                                                                            Waste
                                                                                                                                                                                                                                                                                                                                                     Public Transport




Cash and Debt

The graph below shows Council’s cash and debt holdings as at 30 June 2016 compared to the
2014/15 year. Cash levels have increased despite delivery of the large capital works program
undertaken during 2015/16. Debt levels have decreased as Council continues to minimise its
debt position. Council’s net financial liabilities ratio of -1.5% improved from the previous year
1.2% and remains well within the state government benchmark of not greater than 60%.



                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Page 7 of 30

Section 8

GENERAL COMMITTEE MEETING AGENDA                                                      14 NOVEMBER 2016


Figure 5: Cash and Debt Comparison ($’000)




Previous Council Consideration

Nil

Finance & Risk

Council’s financial sustainability risks are managed through appropriate financial modelling,
annual budgeting, budget management and via regular reporting of performance to identify any
areas of concern.

Consultation

External Consultation - Community & Stakeholder
Nil

Internal Consultation
Nil

Departments/Sections Consulted:

      Chief Executive Officer                Community Services                 x   Corporate Services
      Executive Officer to the Mayor & CEO   Community Facilities                   Financial Services
      Executive Support                      Community Development                  ICT
                                             Libraries & Galleries                  Procurement & Fleet
                                             Local Laws                             Property & Facilities
                                             Waste & Environmental Health           Revenue Services

      Executive Office                       Planning & Infrastructure
      Community Engagement                   Building & Plumbing Services
      Customer Service                       Civil Operations
      Economic Development                   Disaster Management
      Governance                             Infrastructure Planning & Design
      Human Resources                        Planning & Environment
      Sustainability                         Strategic Land Use Planning




                                                                                                 Page 8 of 30

Section 9

GENERAL COMMITTEE MEETING AGENDA                                                                14 NOVEMBER 2016


3                             FINANCIAL PERFORMANCE REPORT OCTOBER 2016
DOCUMENT INFORM AT ION




Author                                Manager Financial Services, Wayne Jensen
                                      Corporate Services Department

Index                                 ECM / Subject / 22.09 – Monthly Financial Performance Report

Attachments                           1.   Statement of Comprehensive Income
                                      2.   Statement of Financial Position


EXECUTIVE SUMMARY
Overall year to date financial performance against budget shows a positive operating variance of
$1.6m against YTD budget, with revenue and expenditure slightly above and below budget
respectively. A review of all operating and capital budgets was undertaken to determine any
required adjustments (subject to a separate report to Council at this meeting).

         Financial Performance Summary to 31 October 2016
                                    Current YTD Actual                      Variance    Variance       Status
                                        YTD           $m                         $m          YTD
                                     Budget                                                    %
                                         $m
         Recurrent Revenue             $39.8        $40.8                        $0.9          2.3%   On track
         Recurrent Expense             $28.8        $28.1                        $0.7          2.4%   On track

         Net Capital Revenue                          $1.9        $2.5           $0.8      42.1%      On track
         Capital Expenditure                          $3.8        $3.7           $0.1       2.6%      On track

Financial statements including Statement of Comprehensive Income (profit & loss) and
Statement of Financial Position (balance sheet) are included as attachments for information of
Council.

Figure 1: Actual Performance Compared to YTD Budget
               $45
               $40
               $35
               $30
               $25
               $20
               $15
               $10
                         $5
                         $-
                                       YTD Budget ($m)                       YTD Actual ($m)

                                            Operating Revenue   Operating Expenditure




                                                                                                      Page 9 of 30

Section 10

GENERAL COMMITTEE MEETING AGENDA                                                14 NOVEMBER 2016


RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee
Meeting dated 14 November 2016 providing the October YTD monthly financial performance
report for the 2016/17 financial year.


REPORT
Recurrent Revenue (YTD Benchmark 33%)
Council has recognised 46% ($40.8 million) of its recurrent revenue budget of $89 million as at
the end of October 2016. Commentary on each recurrent revenue category is provided below:

•          Rates and Levies – $31.1m (50%) of the annual budget of $62.3m has been earned.
           General rates are at forecast levels and waste collection charges are $24k below YTD
           budget.
•          Fees and Charges – Fees and charges earned ($2.3m) totals 52% of the full year
           forecast. Development related material change of use fees ($129k), lot reconfiguration
           ($54k), and operational works ($53k) exceed YTD budget, with plumbing inspection fees
           ($17k), change of ownership fees and property search fees ($40k) all also exceeding YTD
           budget.
•          Interest Received – Interest on invested funds is currently $159k ahead of YTD forecast
           levels due to a higher opening actual cash balance than originally estimated in addition to
           interest on outstanding rates ($22k above YTD budget).
•          Dividend and Tax – Dividends and tax payments from Unitywater are in line with YTD
           budget.
•          Other Revenue – Other revenue earned ($3.6m) totals 38% of the full year forecast. Sale
           of recyclables ($96k ahead), Ringtail quarry auction proceeds ($47k), lease revenue
           ($25k), holiday parks ($59k) and Noosa aquatic centre fees ($39k) are all above YTD
           budget.
•          Grants and Subsidies – Receipts for operational grants $52k ahead of YTD budget,
           related to the Stronger Communities Grant received towards renovation of the Tait Duke
           Cottage ($20k), in addition to $32k from RADF.

Figure 2: Recurrent Revenue Position by Type (Excluding Rates)

    $4.0
                                      YTD Budget ($m)
    $3.5
                                      YTD Actual ($m)
    $3.0

    $2.5

    $2.0

    $1.5

    $1.0

    $0.5

    $0.0
                                                           Other




                                                                      Grants
                 Fees




                           Dividend




                                                   Tax
                                        Interest




                                                                                       Page 10 of 30

Section 11

GENERAL COMMITTEE MEETING AGENDA                                                            14 NOVEMBER 2016


Recurrent Expenditure (YTD Benchmark 33%)

Operating expenditure is currently 32% of the full year budget forecast. Detailed commentary for
each expenditure category appears below:

•         Employee Costs – Actuals of $8.6m against the YTD budget of $8.8m and equates to
          30% of the full year budget. This is represented by an under expenditure YTD of training
          budgets ($85k), a rebate for Work Cover premiums ($37k), and recovery from labour
          allocations to capital projects exceeding budget by $109k.
•         Materials and Services – $12.9m (32% of the full year budget) has been expended
          compared to the YTD budget of $13.4m. Year to date variances relate to contract services
          budgets, specifically under expenditure in insurance costs ($22k); waste management
          ($53k); library services ($20k); and property & facilities ($154k). Civil works is below budget
          ($89k); with planning costs currently ahead of budget by $89k due primarily to legal
          expenses associated with the Noosa Civic appeal.
•         Finance Costs – bank merchant fees ($2k) and interest on loans ($17k) are currently
          below the YTD budget.
•         Depreciation expense - in accordance with YTD budget.
•         Other Expenses – in accordance with YTD budget.

Figure 3: Recurrent Expenditure Position by Type
    $16
    $14
                                                           YTD Budget ($m)
    $12
                                                           YTD Actual ($m)
    $10
    $8
    $6
    $4
    $2
    $0
                                           Finance Costs
                              Materials




                                                                     Depreciation
                Employees




                                                                                    Other




Capital Revenue
YTD capital revenue of $2.5m received includes $1.8m of cash contributions from developers,
together with $750k received as grant funding towards capital projects. Note that the timing of the
receipt of developer contributions is unpredictable, with 103% of the full-year budget already
received. Adjustments will be made as part of the December quarter budget review when trends
will be more apparent.

Capital Expenditure
Actual capital expenditure (excluding commitments) is $3.7 million against the revised full-year
budget of $27 million. Committed expenditure totals a further $6.4 million bringing the total of
actual and committed funds to $10.1 million (37% of the total program). Following a
comprehensive review of all capital projects, a number of changes to the program have been
proposed, which are outlined in a separate report to Council.

                                                                                                 Page 11 of 30

Section 12

GENERAL COMMITTEE MEETING AGENDA                                                                14 NOVEMBER 2016


Cash Management and Investment Performance
Council funds are invested in accordance with the adopted Investment Policy. Total cash on
hand at the end of October was $69.1 million.
Council’s investment portfolio is balanced across a number of agencies, as shown in the graph
on the left. The graph on the right shows the current risk profile using industry credit ratings.
                          Bendigo                                                    A1
                            6%                                                       0%
                                                                                          A2
                                                                                          6%
    Westpac
     26%
                                                                                                         A1+
                                              QTC                                                       (QTC)
                                              49%                             A1+                        49%
                                                                             (Other)
                                                                              45%

                               CBA
             NAB               8%
             11%


Actual interest revenue for September was $146,224 with a weighted average yield of 2.44%
against the industry benchmark (Bloomberg AusBond Bank Bill Index) of 1.75%.

Previous Council Consideration
Nil.

Finance & Risk
Monthly financial performance is monitored across all operational areas to ensure Council’s
forecast operating result is achieved and that financial sustainability ratios are met. Ongoing
budget adjustments will be undertaken as required with a primary consideration being
maintenance of the operating surplus.

Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.
Departments/Sections Consulted:

x      Chief Executive Officer                x   Community Services                      x   Corporate Services
       Executive Officer to the Mayor & CEO       Community Facilities                        Financial Services
       Executive Support                          Community Development                       ICT
                                                  Libraries & Galleries                       Procurement & Fleet
                                                  Local Laws                                  Property & Facilities
                                                  Waste & Environmental Health                Revenue Services

x      Executive Office                       x   Planning & Infrastructure
       Community Engagement                       Building & Plumbing Services
       Customer Service                           Civil Operations
       Economic Development                       Infrastructure Planning & Design
       Governance                                 Planning & Environment
       Human Resources                            Strategic Land Use Planning
       Sustainability



                                                                                                          Page 12 of 30

Section 13

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2016


                                         Attachment 1




                                        Page 13 of 30

GENERAL COMMITTEE MEETING AGENDA                                                                       14 NOVEMBER 2016

                                                                                                                    Attachment 1

   Revenue
         Recurrent Revenue
         Rates, levies and charges                           62,319,194          31,159,597          31,126,654               50%
         Fees and charges                                     4,358,451           1,942,015           2,279,067               52%
         Dividend income                                      1,651,805             60,889              60,889                 4%
         Interest received                                    4,155,093           1,179,191           1,389,908               33%
         Tax equivalents                                      1,489,834             300,433            300,433                20%
         Sale of Goods and Major Services                     7,612,893           2,486,246           2,748,062               36%
         Sale of Contract & Recoverable Works                    15,970               5,323               553                   3%
         Rental & Lease Income                                1,237,656            453,083             477,692                39%
         Other income                                           625,369             295,808            384,702                62%
         Grants, subsidies, contributions and donations       5,540,978           1,955,604           2,006,006               36%
                                                             89,007,242          39,838,189          40,773,966               46%
   Expenses
         Recurrent Expenses
         Employee benefits                                   28,522,968           8,760,152           8,570,122               30%
         Materials and services                              40,501,688          13,391,411          12,931,580               32%
         Finance costs                                        2,583,584             861,195            841,478                 33%
         Depreciation and amortisation                       17,122,216           5,707,405           5,707,405               33%
         Other expenses                                          85,863             32,999              34,858                41%
                                                             88,816,319          28,753,162          28,085,443               32%

  OperatingResult =                                            490,928         14,085,027          12,688,523
   Capital Revenue
         Capital contributions and donations                  1,733,634           1,076,442           1,782,087              103%
         Grants, subsidies, contributions and donations       5,179,000             785,000            750,000                 14%
         Other capital revenue                                        -                   -                   -
 Total CapitalRevenue                                         6,912,634          1861442             2.592,087

                                                                                                                 Page 13 of 30

Section 14

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2016

                                        Attachment 2




                                        Page 14 of 30

GENERAL COMMITTEE MEETING AGENDA                                                                   14 NOVEMBER 2016

                                                                                                             Attachment 2
   Noosa Council
   Statement of Financial Position
   For the Year Ended 30 June 2017
   As at 08-Nov-2016
                                                                                        Consolidated
                                                                2017 Year End
                                                                  Forecast                2017 YTD                   2016
                                                     Note            $                        $                       $
   Current Assets
         Cash and cash equivalents                                    50,163,274               66,416,048              52,586,475
         Trade and other receivables                                   8,315,517                6,676,548               5,946,062
         Inventories                                                     104,025                  163,309                 156,056
         Other current assets                                            668,000                  744,487               2,628,892
                                                                      59,250,816               74,000,392              61,317,486
         Non Current Assets held for sale                                       -                       -                        -
   Total Current Assets                                               59,250,816               74,000,392              61,317,486

   Non Current Assets
         Trade and other receivables                                  49,217,517               49,217,517              49,217,517
         Other non current Assets                                               -                       -                        -
         Investments                                                  60,978,225               60,978,225              60,978,225
         Investment property                                           3,831,234                4,150,000               4,150,000
         Property, plant and equipment                               940,511,084             904,636,520              906,665,451
         Intangible assets                                             3,502,623                2,650,435               2,613,761
   Total Non Current Assets                                        1,058,040,682            1,021,632,698           1,023,624,954
   Total Assets                                                    1,117,291,498            1,095,633,089           1,084,942,440

   Current Liabilities
         Trade and other payables                                      4,460,191                6,720,844               7,887,760
         Borrowings                                                    3,079,477                3,438,029               2,932,289
         Provisions                                                    5,090,852                2,607,240               4,328,513
        Other                                                            390,000                  624,377                 537,888
   Total Current Liabilities                                          13,020,520               13,390,490              15,686,451
   Non Current Liabilities
         Trade and other payables                                               -                       -                        -
         Borrowings                                                   34,362,811               32,952,158              35,186,158
        Provisions                                                     8,410,678                9,082,779               9,082,779
   Total Non Current Liabilities                                      42,773,489               42,034,938              44,268,938
   Total Liabilities                                                  55,794,009               55,425,427              59,955,389

   Net Community Assets                                            1,061,497,489            1,040,207,662           1,024,987,051

   Community Equity
         Asset Revaluation Surplus                                    47,237,401               24,518,021              24,518,021
         Retained Surplus / (Defeciency)                                        -                       -                        -
         Shire Capital                                             1,014,260,088            1,000,469,031             987,372,510
         Current Year Net Earnings                                              -              15,220,610              13,096,521
   Total Community Equity                                          1,061,497,489            1,040,207,662           1,024,987,051

                                                                                                             Page 14 of 30

Section 15

GENERAL COMMITTEE MEETING AGENDA                                                               14 NOVEMBER 2016


4                         SEPTEMBER QUARTER BUDGET REVIEW (BR2)
OCUMENT INFORM AT ION




Author                               Manager Financial Services, Wayne Jensen
                                     Corporate Services Department

Index                                ECM/ Subject/ 7.13: 2016 - 2017 Budget

Attachments                          1.    Proposed Budget Adjustments – Operating
                                     2.    Proposed Budget Adjustments – Capital
                                     3.    Revised Budget Financial Statements


EXECUTIVE SUMMARY
The Local Government Act 2009 and Local Government Regulation 2012 require Council to
undertake regular reviews of the adopted budget to ensure it remains reflective of planned
activities to be funded through the budget period. Consequently, a full review of all operational
and capital activities has been undertaken using income and expenditure figures as at the end of
September 2016.

RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee
Meeting dated 14 November 2016 and approve the requested changes to the budget for the
2016/17 financial year, as outlined in the attached Budget Financial Statements.


REPORT
Section 170(3) of the Local Government Regulation 2012 allows Council, by resolution, to amend
the budget at any time before the end of the financial year. As such, formal reviews have been
scheduled to be undertaken following the close of each quarter (July to September; October to
December; January to March), using year-to-date figures as the basis for any revised forecasts.

This review provides an opportunity to take account of any additional information that has come
to light since the last review and to ensure the most accurate figures are included in the year-end
forecast. The September quarter review establishes a revised 30 June 2017 forecast position,
which then forms the basis for the ensuing 10-year financial plan.

The Revised Budget Financial Statements clearly identify statement line items that have been
affected by the proposed adjustments. It is noted that the Budget Financial Statements have
been amended to reflect the actual closing position as at 30 June 2016, and therefore the
Statement of Financial Position, Statement of Cash Flows, and Statement of Changes in Equity
all show variations from the original forecast position from the original budget.

Key requirements for budget reviews include:
•                       All increases in operating expenditure should be funded. If variances cannot be funded at the
                        branch or departmental level, then operational savings, determined after collaboration with
                        other departments, should be identified to ensure no degradation in the overall operating
                        position for Council.
•                       Proposed reallocation of savings or additional revenue will be confirmed by the leadership
                        team based on business risk assessment.
•                       The capacity to deliver capital projects has been considered as part of the evaluation
                        process.


                                                                                                      Page 15 of 30

Section 16

GENERAL COMMITTEE MEETING AGENDA                                            14 NOVEMBER 2016


1.   Operating Budget Adjustments

There have been a number of adjustments to the operating budget proposed, as outlined in
Attachment 1, with an overall improvement in the operating position of $189k. Requests for
additional expenditure have been fully funded with savings or additional revenue. New initiatives
or significant funding requests have been reviewed by the Leadership Team prior to inclusion in
the budget review.

Key items include:
•    Fees & charges revenue – recognition of additional revenue from development
     applications received.
•    Interest revenue – recognition of higher than anticipated revenue received to date.
•    Sales revenue – accounting for revenue received from Library author events not originally
     budgeted.
•    Other recurrent income – account for insurance settlement from fleet asset.
•    Operating grants and subsidies – recognition of additional grant revenue received (offset
     by expenditure) for traineeships undertaken, and from additional State Library grant
     revenue received.
•    Employee Costs – minor adjustments to recognise the reallocation of budgets from
     contract services for facility maintenance; wages attributable to the new trainee positions;
     backfill of a position in planning administration to prepare for new Planning legislation; and
     the employment of a Flying Fox management officer.
•    Materials and services – provision of materials for Community Bushland Care program;
     the engagement of a consultant to undertake a review of Noosa Community Support
     operations; provision for increased contract tree management services due to increases in
     customer requests; adjustments to holding tank charges to be managed through waste;
     expenditure of additional grants received; and savings in insurance costs and Council of
     Mayors membership.

2.   Capital Works Program Adjustments

There have been a number of adjustments to the capital works program to reflect emergent
works undertaken and variations across different programs. Details for changes to each program
are outlined in Attachment 2. The total program has decreased by $1,571,265 with a focus on
the ability to deliver the current program.

Previous Council Consideration

The budget was amended in August 2016 to account for the carryover of projects from 2015/16
into the current year.

Finance & Risk

There has been an increase to the operating result following the budget review, and overall
Council is forecasting a surplus of $384k.

Changes to the capital program include a marginal reduction in renewal works of $137k, and a
reduction in expansion and upgrade projects of $1,423k. Capital program changes do not impact
the operating position, though the forecast cash position is marginally improved.

All financial sustainability ratios remain within (or exceed) target ranges, as outlined in the
attached Budget Financial Statements.

                                                                                    Page 16 of 30

Section 17

GENERAL COMMITTEE MEETING AGENDA                                                          14 NOVEMBER 2016


Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

All areas of Council are consulted through the budget review process and the submissions
received from Managers are reviewed by the Leadership Team in consultation with the Mayor
prior to presentation to Council.

Departments/Sections Consulted:

x     Chief Executive Officer                x   Community Services                 x   Corporate Services
      Executive Officer to the Mayor & CEO       Community Facilities                   Financial Services
      Executive Support                          Community Development                  ICT
                                                 Libraries & Galleries                  Procurement & Fleet
                                                 Local Laws                             Property & Facilities
                                                 Waste & Environmental Health           Revenue Services

x     Executive Office                       x   Planning & Infrastructure
      Community Engagement                       Building & Plumbing Services
      Customer Service                           Civil Operations
      Economic Development                       Infrastructure Planning & Design
      Governance                                 Planning & Environment
      Human Resources                            Strategic Land Use Planning
      Sustainability




                                                                                                    Page 17 of 30

Section 18

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2016


                                                        Attachment 1




                                        Page 18 of 30

Budget Review 2 - September Quarter Review 2016/17                                                                                                                                                                                     Attachm ent 1
 Summary   of Submissions Received                                                                        $    108,622.26  $    755,665.03 -$     188,662.71 -S     80,040.45
   (eal)       Department            Team                    Cost Centre / Project Description           2016/17 Current   2016/17 Actuals  Proposed          2016/17          PIC             Cert   eed
                                                                                                         Budget                             Adjustment        Proposed         oT)
                                                                                                                                                              ta dete =1 ess, 8
A002            Community Services   Waste Management        Waste Holding Tanks                                    $0.00         $7,750.03       $50,927.00        $50,927.00 Expense         Budget transfer of Boreen Point holding tank charges and
                                                                                                                                                                                               recoveries to Waste Management
 A002           Corporate Services   Caravan Parks           Boreen Point                                      $48,927.00            $0.00      ~($48,927.00)            $0.00 Expense         Budget transfer of Boreen Point holding tank charges and
                                                                                                                                                                                               recoveries to Waste Management
A002            Planning and         Building Facilities     Public Amenities                                    $3,500.00           $0.00       ~($2,000.00)        $1,500.00 Expense         Budget transfer of Boreen Point holding tank charges and
                Infrastructure                                                                                                                                                                 recoveries to Waste Management
 A002           Community Services   Waste Management        Waste Holding Tanks                              -($13,969.00)          $0.00      -($48,849.26)     ~($62,818.26) Revenue        Budget transfer of Boreen Point holding tank charges and
                                                                                                                                                                                               recoveries to Waste Management
A002            Corporate Services   Caravan Parks           Boreen Point                                           $0.00            $0.00        $29,309.56        $29,309.56 Expense         Budget transfer of Boreen Point holding tank charges and
                                                                                                                                                                                               recoveries to Waste Management
 A002           Planning and         Building Facilities     Public Amenities                                       $0.00            $0.00        $19,539.70        $19,539.70 Expense         Budget transfer of Boreen Point holding tank charges and
                Infrastructure                                                                                                                                                                 recoveries to Waste Management
A003            Executive Office     Workplace Health and    Workplace Health and Safety                            $0.00        $2,742.44        $10,879.72        $10,879.72 Expense         Adjustment of internal fleet charges
                                     Safet,
 A003           Planning and        Plumbing                 Plumbing Services                                 $56,494.00        $13,284.21         $1,167.95       $57,661.95 Expense         Adjustment of internal fleet charges
                Infrastructure
A003            Planning and         Community Resilience    State Emergency Services                         $115,398.00        $33,518.37       $11,653.00       $127,051.00 Expense         Adjustment of internal fleet charges
                Infrastructure       and Disaster
                                     Management
 A003           Community Services   Environmental Health    Public Health                                      $22,159.00        $8,327.76       $10,879.73        $33,038.73 Expense         Adjustment of internal fleet charges
A003            Community Services   Environmental Health    Environmental Health Coordination                      $0.00         $2,741.75       $10,878.81        $10,878.81 Expense         Adjustment of internal fleet charges
 A003           Planning and         Work Operations        Bridges                                                  $0.00         $456.27          $1,809.86        $1,809.86 Expense         Adjustment of internal fleet charges
                Infrastructure
A003            Planning and         Work Operations         Ringtail Quarry                                        $0.00          $513.58          $2,039.39        $2,039.39 Expense         Adjustment of internal fleet charges
                Infrastructure
 A003           Planning and         Transport and Traffic   Transport and Traffic Operation                         $0.00        $2,595.17       $10,294.91        $10,294.91 Expense         Adjustment of internal fleet charges
                Infrastructure       Planning
A003            Planning and         Parks and Landscape     Parks and Gardens                                $356,795.00       $88,736 67          $7,572.49      $364,367.49 Expense         Adjustment of internal fleet charges
                Infrastructure
 A003           Community Services   Cemetries               Cooroy Cemetery                                         $0.00          $120.93          $289.09           $289.09 Expense         Adjustment of internal fleet charges
A003            Planning and         Natural Areas           Bushland Reserves                                  $70,158.00       $24,002.11       $17,248.31        $87,406.31 Expense         Adjustment of internal fleet charges
                Infrastructure
A003            Community Services   Libraries               Mobile Library                                   $118,854.00        $31,806.09         $7,332.10      $126,186.10 Expense         Adjustment of internal fleet charges
 jane           Planning and         Work Operations         Works Operations                                 $143,444.73       $319,450.75      $143,443.31       $286,888.04 Expense         Adjustment of internal fleet charges
                Infrastructure
 A003           Corporate Services  Fleet                    Fleet Plant and Workshop Operations           ~-($2,295,081.00)  ~($628,775.79)   -($235,488.67)  ~($2,530,569.67) Revenue        Adjustment of internal fleet charges
A003            Corporate Services   Procurement and         Fleet Plant and Workshop Operations                    $0.00      ($29,045.45)     -($29,045.45)     -($29,045.45) Revenue        Insurance settlement received for damaged utility
                                     Contracts
A003            Corporate Services   Procurement and         Fleet Plant and Workshop Operations                $12,500.00       $23,636.36       $23,636.36        $36,136.36 Expense         Insurance payment for damaged untility
                                     Contracts
 CEOO001        Chief Executive Office Chief Executive Office Chief Executive Office                          $147,342.00       $110,762.73     ~($36,579.27       $110,762.73 Expense         Council of Mayors membership budget not required
 cso0o1         Community Services —_ Library Services       Library Collections                            -($219,051.00)           $0.00      -($13,648,.00)   -($232,699.00) Revenue        Increase in the public library collections grant from the state
                                                                                                                                                                                               government
 Cso02          Community Services _ Library Services        Library Collections                                 $8,750.00       $21,854.00       $13,648.00        $22,398.00 Expense         Increase in the public library collections grant from the state
                                                                                                                                                                                               government
 cso03          Community Services   Library Services        Library Programs and Services                           $0.00    ~($10,053.00)       ~($9,950.00)     -($9,950.00) Revenue        Revenue received as ticket fees for two high-profile author events -
                                                                                                                                                                                               expended to pay for catering.
 cso04          Community Services   Library Services        Library Programs and Services                       $1,225.00       $6,670.00          $9,540.00       $10,765.00 Expense         Revenue received as ticket fees for two high-profile author events -
                                                                                                                                                                                               expended to pay for catering.
 cso0s          Community Services   Noosa Community         Respite Centre                                   $374,147.00       $101,874.02     ($29,831.05)       $344,315.95 Expense         Reduction in contract services required to offset increased
                                     Support                                                                                                                                                   employee benefits costs.
 CS007          Community Services   Noosa Community         Home Assist Secure                                $84,230.00        $23,215 83      ~($2,628.10)       $81,601.90 Expense         Reduction in contract services required to offset increased
                                     Support                                                                                                                                                   employee benefits costs.

                                                                                                                                         Page 18 of 30

Section 19

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2016




                                        Page 19 of 30

GENERAL COMMITTEE MEETING AGENDA                                                                                                     14 NOVEMBER 2016

    Budget Review 2 - September Quarter Review 2016/17
    Summary   of Submissions Received                                                                        $    108,622.26  $    755,665.03 -S     188,662.71 -S      80,040.45
   Reference      Pre ee                oT)                     Cost Centre / Project Description           2016/17 Current   2016/17 Actuals  Proposed         rib are           cele            ered
                                                                                                            Budget                             erg               Proposed         Py
                                                                                                                                                                   ari uem alco" a8
    csoo0g         Community Services   The J                   The J                                             $90,654.00         $8,222.73       -($5,000.00)      $85,654.00 Expense         Reallocation of funds from contract services (B&F maintenance) to
                                                                                                                                                                                                  employee job costing expense to recognise the use of Council staff
                                                                                                                                                                                                  to undertake maintenance works.
    CS010          Community Services   TheJ                    The J                                                   $0.00      $62,273.17          $5,000.00        $5,000.00 Expense         Reallocation of funds from contract services (B&F maintenance) to
                                                                                                                                                                                                  employee job costing expense to recognise the use of Council staff
                                                                                                                                                                                                  to undertake maintenance works.
    csot1          Community Services   The J                   Bicentennial Community Centre                      $25,600.00            $0.00       ~($1,500.00)      $24,100.00 Expense         Reallocation of funds from contract services (B&F maintenance) to
                                                                                                                                                                                                  employee job costing expense to recognise the use of Council staff
                                                                                                                                                                                                  to undertake maintenance works.
   cso12           Community Services   The J                   Bicentennial Community Centre                      $10,800.00        $2,135.07         $1,500.00       $12,300.00 Expense         Reallocation of funds from contract services (B&F maintenance) to
                                                                                                                                                                                                  employee job costing expense to recognise the use of Council staff
                                                                                                                                                                                                  to undertake maintenance works.
    CS013          Community Services   Noosa Aquatic Centre    Noosa Aquatic Centre                              $45,823.00        $18,048.45       -($3,500.00)      $42,323.00 Expense         Reallocation of funds from contract services (B&F maintenance) to
                                                                                                                                                                                                  employee job costing expense to recognise the use of Council staff
                                                                                                                                                                                                  to undertake maintenance works.
    cso14          Community Services   Noosa Aquatic Centre    Noosa Aquatic Centre                                    $0.00      $180,723.06         $3,500.00        $3,500.00 Expense         Reallocation of funds from contract services (B&F maintenance) to
                                                                                                                                                                                                  employee job costing expense to recognise the use of Council staff
                                                                                                                                                                                                  to undertake maintenance works.
    cso15          Community Services   Noosa Leisure Centre    Noosa Leisure Centre                              $42,697.00        $17,130.59       ~($3,500,00)      $39,197.00 Expense         Reallocation of funds from contract services (B&F maintenance) to
                                                                                                                                                                                                  employee job costing expense to recognise the use of Council staff
                                                                                                                                                                                                  to undertake maintenance works.
    CS016          Community Services   Noosa Leisure Centre    Noosa Leisure Centre                               $10,000.00      $84,205.78          $3,500.00       $13,500.00 Expense         Reallocation of funds from contract services (B&F maintenance) to
                                                                                                                                                                                                  employee job costing expense to recognise the use of Council staff
                                                                                                                                                                                                  to undertake maintenance works.
    CS017          Community Services   Noosa Community         Noosa Community Support Projects                        $0.00            $0.00        $20,000.00       $20,000.00 Expense         Consultant review of how upcoming funding changes may affect
                                        Support                                                                                                                                                   NCS operations - funded from NCS reserve
   Ex001           Executive Office     Corporate Planning      Corporate Planning and Reporting                   $11,400.00            $0.00      -($11,400.00)           $0.00 Expense         Budget for Corporate Strategy Retreat for New Council no longer
                                                                                                                                                                                                   equired
    Ex002          Executive Office     Corporate Planning      Corporate Planning and Reporting                    $1,600.00            $0.00       ~($1,600.00)           $0.00 Expense         Budget for Corporate Strategy Retreat for New Council no longer
                                                                                                                                                                                                   equired
   Ex003           Executive Office     Risk Managementand _ Risk Management and Insurance                       $415,400.49       $382,805.29     -($32,595.20)      $382,805.29 Expense         Savings in insurance premiums
                                        Insurance
    Ex004          Corporate Services   ICT                     ICT Applications                                        $0.00            $0.00      -($12,500.00)    -($12,500.00) Revenue        New Trainee for 2017

   Ex004           Corporate Services   ICT                     ICT Applications                                        $0.00            $0.00        $10,767.00       $10,767.00 Expense         New Trainee for 2017
   Ex004           Community Services   Library Services        Noosaville Libra                                        $0.00            $0.00       $12,500.00)      ($12,500.00) Revenue        New Trainee for 2017
   Ex004           Community Services   Library Services        Noosaville Library                                      $0.00            $0.00        $10,767.00       $10,767.00 Expense         New Trainee for 2017
   Ex004           Planning and         Parks and Landscape     Parks and Gardens                                       $0.00            $0.00      -($12,500.00)    -($12,500.00) Revenue        New Trainee for 2017
                   Infrastructure
   Ex004           Planning and         Parks and Landscape     Parks and Gardens                                       $0.00            $0.00         $7,873.00        $7,873.00 Expense         New Trainee for 2017
                   Infrastructure
    PIOO1          Planning and         Parks and Landscape     Arborist Services                                $481,526.88       $221,991.65       $85,000.00       $566,526.88 Expense         Additional funding required to address increasing number of
                   Infrastructure                                                                                                                                                                 customer requests for contract tree services
    PI002          Planning and         Parks and Landscape     Bushland Reserves                                   $6,680.04        $3,312.09        $12,700.00       $19,380.04 Expense         Supply of materials and equipment for Community Bushland Care
                   Infrastructure                                                                                                                                                                 Program
   PI003           Planning and         Environmental Services  Environmental Services                           $184,686.12       $63,319.63        $47,600.00       $232,286.12 Expense         Employment of a Flying Fox Management Officer to provide a point
                   Infrastructure       and Protection                                                                                                                                            of liaison with the community
    Pl004          Planning and         Environmental Services  Environmental Services                                  $0.00            $0.00        $10,000.00       $10,000.00 Expense         Flying Fox subsidy program for assistance to affected residents
                  Infrastructure        and Protection
    PI00S          Planning and         Works Operations        Pathways                                           $51,430.00        $6,175.00         $7,183.00       $58,613.00 Expense         Main Beach boardwalk repairs to increase due to deferral of
                   Infrastructure                                                                                                                                                                 upgrade works
    PIO06          Planning and         Buildings and Facilities | Noosaville Depot                                $15,000.00        $1,428.53         $5,940.00       $20,940.00 Expense         Purchase of 4 flammable liquid cabinets for depot
                   Infrastructure
                                                                                                                                                 Page 19 of 30

Section 20

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2016




                                        Page 20 of 30

GENERAL COMMITTEE MEETING AGENDA                                                                                                14 NOVEMBER 2016

    Budget Review 2 - September Quarter Review 2016/17
    Summary  of Submissions Received                                                                     $     108,622.26 $    755,665.03 -$    188,662.71 -$     80,040.45
        Lela      Department            ET)                   Cost Centre / Project Description          2016/17 Current  2016/17 Actuals  Proposed         PATE             el)            TT)
                                                                                                        beef                               Dra              Proposed        PSF TE}
                                                                                                                                                            Revised Budget
    P1007         Planning and         Environmental and      Environmental Levy                                    $0.00           $0.00        $17,570.00       $17,570.00 Expense        Council contribution towards the Oyster Reef Project
                  Infrastructure       Biosphere Reserve
    P1008         Planning and        Development             Planning Administration and Compliance          $284,502.00      $97,666.83       $22,890.00       $307,392.00 Expense        Backfill offline planning administration officer while incumbant is
                  Infrastructure      Assessment                                                                                                                                            engaged in the implementation of planning systems and process
                                                                                                                                                                                            changes to comply with new planning legislation in July 2017
   PI009          Planning and        Development             Development Assessment                        -($150,000.00)   -($279,344.80) — -($129,000.00)   ($279,000.00) Revenue        Recognition of additional fee revenue
                  Infrastructure       Assessment
   0S001            orporate Services _ Financial Services   Treas:                                          ‘$455,000.00     3270,612.87      $160,000.00) _ -($615,000.00) Revenue         Recognition of additional interest revenue

                                                                                                                                            Page 20 of 30

Section 21

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2016


                                                        Attachment 2




                                        Page 21 of 30

GENERAL COMMITTEE MEETING AGENDA                                                                                      14 NOVEMBER 2016

    Budget Review 2 - September Quarter Review 2016/17                                                                                                                                                            Attachm ent 2
    Summary  of Submissions Received                           $   9,336,947.09  $    470,315.70 -$   1,571,265.23  $  7,765,681.86
   Reference      Cost Centre / Project Description           2016/17 Current   2016/17 Actuals  Proposed          2016/17           CAPEX PROGRAM                  Comments
                                                              a 1TTe [elt a                      Pears             Proposed
                                                                                                                   Revised Budget
   CAPO002        Munna Point Bridge Road Deck Joint                         $0 $             -        $37,000.00         $37,000.00 Bridges                        Replacement of Munna Point Bridge road deck joints to reduce noise
                 Replacement                                                                                                                                        - to be completed in conjunction with footpath resurfacing.

   CAP003         Munna Point Bridge Footpath and Deck Joint                 $0 $             -         $77,000.00        $77,000.00 Bridges                        Resurfacing of Munna Point Bridge footpath to prevent moisture
                  Replacement                                                                                                                                      affecting the structure of the bridge headstocks, to be undertaken in
                                                                                                                                                                   conjunction with deck joint replacement.

   CAP004         Wahpunga Road Bridge Renewal Kin Kin                  $47,600 $             :         $10,000.00        $57,600.00 Bridges                        Replace pier headstocks and reinforce piles to increase the load limit
                                                                                                                                                                   to 25 tonnes.
   CAPO0S5        Noosaville - Gympie Tce / Williams St                 $11,070 $         8,780         $15,000.00        $26,070.00 Coastal Canals and Waterways  These funds are required to complete the on-street lighting
                                                                                                                                                                    requirements as a result of the shared pedestrian zone.
   CAPO06         Munna Pnt Foreshore Rehab Stg 2 Design                 $5,574 $          4,099         $9,700.00        $15,274.00 Coastal Canals and Waterways   Extra expense due to the re-design and costs in preparing
                  Drawings and Approval                                                                                                                            documentation for approvals.
   CAPO07         Whole of Shire, Dune Fencing Rehabilitation           $20,000 $          4,956        $15,000.00        $35,000.00 Coastal Canals and Waterways   Extra materials were purchased for future works
   CAPO008        Noosaville, Noosa River Timber Retaining Wall,        $50,000 $        27,764        -$12,000.00        $38,000.00 Coastal Canals and Waterways   Project complete under budget
                  Steps and Landing
   CAPO09         Noosa Main Beach Tower Roof Replacement                    $0 $         15,658        $15,658.00        $15,658.00 Coastal Canals and Waterways   Emergent works request to ensure the tower remained operationally
                                                                                                                                                                   safe.
   CAP010         Peregian Beach, Rufous St Civil Works                      $0 $             -        $955,000.00       $955,000.00 Commerical Land & Property     Separate Rufous Street project into civil works and building
                                                                                                                                                                   components.
   CAPO11         Peregian Beach, 5 Rufous St Redevelopment          $2,900,000 $          9,168     -$1,900,000.00    $1,000,000.00 Commerical Land & Property     Budget reduced due to deivery timneframe (works cannot
                 Construction                                                                                                                                      commence until the temporary carpark is constructed)
   CAP012         Peregian Surf Club Public Amenities - Planning        $25,000 $             -        -$25,000.00             $0.00 Community Facilities           Project will be scoped for the 2017/18 capital program
                  & Design
   CAP013         Noosa Heads Surf Club Public Amentities                    $0 $        105,555       $105,555.00       $105,555.00 Community Facilities           Project was completed but 2015/16 carryover funds were overlooked
                  Refurbishment
   CAP014         Noosa Heads Demolition of Lifeguard Service/          $21,000 $             -        -$21,000.00             $0.00 Community Facilities           Project to be deferred and will be aligned to when the SLSQ make a
                  SLSQ Operations                                                                                                                                  decision on a way forward.
   CAPO15         Noosa Regional Art Gallery Sound System                    $0 $         9,091         $12,600.00        $12,600.00 Community Facilities           Emergent request to improve gallery sound system to cater for
                                                                                                                                                                   ongoing gallery events
   CAP016         Sunshine Beach NAC Overflow Carpark                        $0 $             -         $29,000.00        $29,000.00 Community Facilities           Re-use of asphalt material to seal the overflow carpark at the NAC
                  Drainage and Landscaping

   CAP017         Noosa Museum Roof Replacement                              $0 $             -         $20,000.00        $20,000.00 Community Facilities           Replacement of the Pomona Museum roof required due to poor
                                                                                                                                                                   condition (funded from Heritage Levy).
   CAP018         Noosa Depot Workshop Electrical Replacement                $0 $          5,719        $6,847.00          $6,847.00 Corporate Buildings            Replacement of electrical components at the Noosa Depot
                                                                                                                                                                   Workshop to meet safety regulations
   CAPO021        Black Mountain Repeater Replacement                        $0 $         6,923         $6,923.00          $6,923.00 Information Technology         Repeater replacement required due to lightening strikes. Repeater
                                                                                                                                                                   critical for two way communication to maintain service delivery and
                                                                                                                                                                   for disaster management purposes
   CAP022         Tewantin Spray Park Shade Sail                        $37,264 $        38,305          $1,041.00        $38,305.00 Parks & Playgrounds           Adjustment required as project completed 2.8% above budget
   CAP023         Tewantin RSL Park Shade Structure Renewal             $48,093 $         23,581       -$23,312.00        $24,781.00 Parks & Playgrounds            Project complete under budget
   CAP024         Whole of Shire BBQ Renewals                                $0 $             -        $98,000.00         $98,000.00 Parks & Playgrounds            Identified need for the replacement of public barbecues

                                                                                                                                 Page 21 of 30

Section 22

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2016




                                        Page 22 of 30

GENERAL COMMITTEE MEETING AGENDA                                                                                       14 NOVEMBER 2016

    Budget Review 2 - September Quarter Review 2016/17
    Summary  of Submissions Received                           $   9,336,947.09  $    470,315.70 -$   1,571,265.23  $  7,765,681.86
     (eile)        Cost Centre / Project Description          2016/17 Current   2016/17 Actuals   Proposed        Pl                 oF Oe ei 7)                    Comments
                                                               = ITT [eld                        Adjustment        Proposed
                                                                                                                   Revised Budget
    CAP025        Botanic Gardens, Shade Stucture Renewal                    $o $             -         $28,000.00        $28,000.00 Parks & Playgrounds            Design phase for Botanical Gardens Shade House replacement.
                  Project
    CAP026        Noosa Heads Park Road, Boardwalk Design               $30,000 $         31,729       $60,000.00         $90,000.00 Pathways & Enabling Facilities | This project is being consolidated with previous year project
                  and Consultation                                                                                                                                  numbers for the same project.
    CAP027        Noosaville Eenie Creek Road Off-Ramp to              $123,043 $           543       -$122,500.00          $543.09 Pathways & Enabling Facilities  This project was reviewed and was deferred given other capital
                  Underpass Design                                                                                                                                  renewal priorities
   CAP028         Noosa Heads, Park Road Boardwalk                   $1,500,000 $             -       -$473,000.00     $1,027,000.00 Pathways & Enabling Facilities | This project is being consolidated with previous year project
   |              Construction                                                                                                                                      numbers for the same project.
    CAP029        Munna Crescent Boardwalk Renewal                           $0 $         32,591        $33,389.00        $33,389.00 Pathways & Enabling Facilities Emergent works request to rectify a damaged retaining wall and
                                                                                                                                                                    boardwalk at Munna Park.
    CAP030        Tewantin Cranks Park Pathway Renewals                      so $             -         $13,200.00        $13,200.00 Pathways & Enabling Facilities | 66m of concrete pathway renewal to remove trip hazards and ensure
                                                                                                                                                                    public safety.
    CAP031        Noosa Heads Pinaroo Park Pathway Renewals                  $o $             -         $16,700.00        $16,700.00 Pathways & Enabling Facilities 76m of concrete pathway renewal to remove trip hazards and ensure
                                                                                                                                                                    public safety.
   CAP032         Noosaville Wallace Park Pathway Renewals                   $0 $             -         $17,500.00        $17,500.00 Pathways & Enabling Facilities | 78m of concrete pathway renewal to remove trip hazards and ensure
                                                                                                                                                                    public safety.
   ‘CAP033        Peregian Beach David Low Way Raised                        $0 $             -        $80,000.00         $80,000.00 Pathways & Enabling Facilities | To upgrade pedestrian crossing facilities on David Low Way, north of
                  Pedestrian Crossing                                                                                                                               Herron Street, to facilitate pedestrian movements between the
                                                                                                                                                                    shopping centre and Rufous Street, Rufous Lane and the proposed
                                                                                                                                                                    Digital Hub Building
    CAP034        Botanic Gardens Pathway Replacement                        $o $             -        $129,075.00       $129,075.00 Pathways & Enabling Facilities | This project is to remove or replace the worst (highest risk) pathways
                                                                                                                                                                    at the Botanical Gardens with asphalt. This includes total pathway
                                                                                                                                                                    lengths of 1,020 metres and a width of 2.5 or 3 metres depending on
                                                                                                                                                                    location.
    CAP035        Noosaville, Lake Weyba Drive Bus Turnaround          $200,000 $             -       -$200,000.00             $0.00 Public Transport Infrastructure Little feedback has been received from Translink in progressing this
                                                                                                                                                                    project - to be reconsidered in the 2017/18 capital program
    CAP038        Cooroy-Belli Ck Road Slip Repair                           $o $          1,301         $1,301.00         $1,301.00 Sealed Roads Network           External project manager required to complete grant acquittal in
                                                                                                                                                                    2016/17 financial year.
    CAP039        Cootharaba - Dr Pages Road & Kinmond Creek                 $o $         71,609        $91,608.77        $91,608.77 Sealed Roads Network           Completion of culvert stabiliser and replacement. Purchase of land.
                  Rd - Construction
    CAP040        Noosaville - Mary Street footpath, roadworks &             $0 $             :         $74,400.00        $74,400.00 Sealed Roads Network           Renewal of footpath, minor road works and drainage improvements
                  drainage improvements                                                                                                                             as a result of replacing to a modern day equivalent.
    CAP041        Girraween Sportsground Water Bore & Storage           $25,000 $        38,222         $55,000.00        $80,000.00 Sports Ground and Facilities   Installation of bore and above ground water tanks to adrdess water
                                                                                                                                                                    consumption challenges
    CAP041        Girraween Sportsground Water Bore & Storage                so $             -        -$11,000.00      -($11,000.00) Sports Ground and Facilities  Noosa Lions Football club commitment to fund irrigation components
                                                                                                                                                                    of bore water project
    CAP042        Whole of Shire - stormwater structures               $250,000 $             -       -$180,000.00        $70,000.00 Stormwater Drainage            Budget transfer to Noosaville, Thomas Street & Gympie Terrace
   |                                                                                                                                                                Culvert project
   CAP043         Noosaville, Thomas Street & Gympie Terrace           $350,000 $          8,793       $180,000.00       $530,000.00 Stormwater Drainage            Replacement of a section of stormwater drain from Thomas Street to
                  Culverts                                                                                                                                         the Noosa River comprised of 1500m x 600mm box culverts which
                                                                                                                                                                    are starting to fail due to saltwater corrosion.
    CAP044        Tewantin Poinciana Ave Kerb & Channel                      so $             -         $52,000.00        $52,000.00 Stormwater Drainage            Renewal of 130m kerb and channel to ensure the new road surface
                 Renewal                                                                                                                                            is able to settle without disturbance from future kerb and channel
                                                                                                                                                                    maintenance works.
    CAP045        Cootharaba, Kinmond Creek Road Sandy Creek           $750,000 $            84       $300,000.00      $1,050,000.00 Stormwater Drainage            To reconstruct the old deteriorating helcoil culverts with new
                  Culvert                                                                                                                                           concrete box culverts to achieve the current standard (1 in 5
   |                                                                                                                                                                flooding) - the existing road will need to be reconstructed.
    CAPO046       Cootharaba, Kinmond Creek Road Eastern               $500,000 $           343        $550,000.00     $1,050,000.00 Stormwater Drainage            To reconstruct the old deteriorating helcoil culverts with new
                  Branch Culvert                                                                                                                                    concrete box culverts to achieve the current standard (1 in 5
                                                                                                                                                                    flooding) - the existing road will need to be reconstructed.

                                                                                                                                  Page 22 of 30

Section 23

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2016




                                        Page 23 of 30

GENERAL COMMITTEE MEETING AGENDA                                                                                      14 NOVEMBER 2016

    Budget Review 2 - September Quarter Review 2016/17
    Summary   of Submissions Received                           $  9,336,947.09  $     470,315.70 -$   1,571,265.23  $   7,765,681.86
    Pee)           Cost Centre / Project Description           2016/17 Current   2016/17 Actuals   Proposed         rl EWA            CAPEX PROGRAM                   re
                                                               Budget                              PE               Proposed
                                                                                                                    Revised Budget
   CAP047          Noosaville Eenie Ck & Reef Street roundabout               $0 $             -         $15,500.00        $15,500.00 Stormwater Drainage            The drainage outlet arrangement at Reef Street/Eenie Road
                   drainage improvements                                                                                                                             roundabout is inadequate to drain stormwater effectively from the
                                                                                                                                                                     road surface to the centre of the roundabout.
    CAP048         Noosa Heads Noosa Junction - Timber Assets                 $0 $             -         $90,000.00        $90,000.00 Streetscapes and Road Corridors Urgent maintenance and replacement timber is required to
                  Renewal                                                                                                                                            rehabilitate these assets to an acceptable standard to be undertaken
                                                                                                                                                                     in collaboration with Noosa Junction Traders Association.

   CAP049          Pomona Master Plan                                    $20,000 $             -         -$20,000.00            $0.00 Streetscapes and Road Corridors Deferral of the project till more resources are available - to be
                                                                                                                                                                     reconsidered for the 2017/18 capital programme.
    CAP050         Tewantin Cooroy Noosa Rd Traffic Management                $0 $          1,794         $1,794.00         $1,794.00 Transport and Infrastructure   Works complete last financial year. Late invoice paid in August 2016.
                   Construction - A                                                                                                   Management
   CAP051          Sunrise Beach Ben Lexcen Drive School                 $23,303 $             -         -$23,303.00            $0.00 Transport and Infrastructure   Project completed
                   Crossing Improvement-c                                                                                             Management
    CAP052         Noosa Transport Strategy                                   $0 $         23,708        $29,708.00        $29,708.00 Transport and Infrastructure   Works complete last financial year. Timing of additional invoice
                                                                                                                                      Management                     received
   CAP053          Castaways Beach, David Low Way Safety and            $475,000 $             :       -$425,000.00        $50,000.00 Transport and Infrastructure   Planning & design works only . Construction phase to be considered
                   Corridor Improvements                                                                                              Management                     for the 2017/18 capital program
    CAP054         Tewantin, Hilton Terrace & Emest Street            $1,425,000 $             -      -$1,000,000.00      $425,000.00 Transport and Infrastructure   Planning & design works only . Construction phase to be considered
                   Intersection                                                                                                       Management                     for the 2017/18 capital program
   CAP055          Tewantin, Poinciana Avenue & Moorindil Street        $300,000 $             -       -$250,000.00        $50,000.00 Transport and Infrastructure   Planning & design works only . Construction phase to be considered
                   Intersection                                                                                                       Management                     for the 2017/18 capital program
    CAP056        Whole of Shire, Significant Local Roads               $200,000 $             -       -$150,000.00        $50,000.00 Transport and Infrastructure   Works deferred to the 2017/18 capital program
                   Directional Signage,                                                                                               Management
   CAP057          Tewantin, Sports Complex Stage 1 Carpark                   $0 $             -         $21,350.00        $21,350.00 Sports Ground and Facilities   Following consultation with the sporting groups, car parking
                                                                                                                                                                     improvements to complement the overall master plan of the facility.
    CAP058         Tewantin, Tewantin Admin Building Level 1                  $0 $             -         $10,000.00        $10,000.00 Corporate Buildings            Emergent works request due to the failure of the AC unit that
                  Aircon                                                                                                                                             supports the level one admin building.

                                                                                                                                 Page 23 of 30

Section 24

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2016


                                                        Attachment 3




                                        Page 24 of 30

GENERAL COMMITTEE MEETING AGENDA          14 NOVEMBER 2016

                                                                         Attachment 3

                                                                           ay

        i ee ee ie                                 See? Desai
              ¥ NOOSA COUNCIL                   aN
            al                                Sa

                            FINANCIAL STATEMENTS
                                    2016/2017
                                BUDGET REVIEW 2

                                              Page 24 of 30

Section 25

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2016




                                        Page 25 of 30

GENERAL COMMITTEE MEETING AGENDA                                                                                                               14 NOVEMBER 2016

                                                    Noosa Shire Council
                                                    2016/17 Budget Statements
                                                    For the period ending 30 June
                                                    Annual Result - Total Council                  original |    BR1 | Bre precast
                                                                                                     Pan          nd       Pad         PT        POET        Puy       PLP        Puy)       PLP)       Puy         Py         Pd
                                                                                                     $,000       tn        $,000       A           Au        A)         ti         Au         oT        PAu         x          eK
                                                    Statement of Comprehensive Income
                                                    Income
                                                    Revenue
                                                      Recurrent revenue
                                                      Net rates, levies and charges                    62,319]    62,319                63,942     65936      67649      69753      71,707     74084      76,155     78,916     81,282
                                                      Fees and charges                                  4,358]     4,358                 4600       4.715      4832       4953        5087      5,224       5365      5521       5,681
                                                      Rental income                                     1,238]      1,238] 1,238]         1,269      «1,300     1,333,366 =           140014351471                     1,508     1,546)
                                                      Interest received                                 4,153]     4,153                 4509       4753       4956       5,069       5335      5,460       5576      5,686      5,769
                                                      Sales revenue                                     7,623]     7,623                 7823       8018       8218       8424       8634       8849       9070       9,296      9528
                                                      Other income                                      3,773]     3,773                 3897       3995       4094       4197       4302       4409       4520       4633       4,748
                                                      Grants, subsidies, contributions and donations   5,541      5,541                  5605       5618       5,631     5,645        5659      5,674       5689      5,704      5,720
                                                      Total recurrent revenue                          89,005]    89,005                91,644     94,334 = 96,716 §=— 99.407      102,125    105,136    107,846 = 111,264     114,274
                                                      conn                                                               _
                                                      Grants, subsidies, contributions and donations   6,567       6,799                 5,440      4,338      6,500      6,500      6,500      6,500      6,500      6,500      6,500
                                                                                                                         ee
                                                      Total revenue                                    95,571]    95,804                96,759     96,334    102863     105,542    108,244    111,242    113,939    117,342    120,337
                                                      Capital income
                                                      Total capital income                                  -          -                     -          -          -          -          -          -          -          -          -
                                                    Total income                                       95,571]    95,804                96,759     98,334    102863     105542     108,244    111,242    113939     117,342    120,337
                                                   Expenses                                                                    |
                                                      Recurrent expenses                                                ;
                                                      Employee benefits                                28,474]    28,523                29,451     30,320     31,189 +   «©32,198 «= 33,237 Ss «34,308 )«=— 35,289   «36,424 «= 37,593
                                                      Materials and services                           40,415]    40,499                41,590     42630      43696      44788      45998      47,240     48515      49,922     51,370
                                                      Finance costs                                     2,583]     2583}      2583]      2495       2314       2,114       1,892      1,660      1,413      1,153      872         593
                                                      Depreciation and amortisation                    17,122     17,122     17,122     17,681     18,002     18,210     18,757      19,456   20,020      20,404     21,038   = 21,812
                                                      Other expenses                                      86:         86        86:        88          30         92         95         97        100        102        105        107
                                                      Total recurrent expenses                         88,680]    88,812                91,382     93438      95,388     97,821    100,545    103,181    105,794    108584     111,576
                                                      Capital expenses
                                                      Total capital expenses                             200        200                    205        210        215       221        226         232        237       243         250)
                                                      Total expenses                                                                    91,604     93,665     95,621     «98.060   100,789    103.432    106,051    108,648    111,846
                                                                                                                                 ee
                                                    Net result                                                     6792)      6978}      5480       5007       7595       7847       7836       8204       8295       8917       8928
                                                    Operating result
                                                                                                                         PY
                                                    Recurrent revenue                                  89,005]    89,005                91,644     94,334     «96,716 =  99.407    102,125    105,136    107,846 «= 111,264    114,274
                                                    Recurrent expenses                                 88,680]    88,812                91,382     93,438     95,388     97,821 ~—- 100,545   103,181    105,794 += 108,584    111,576
                                                    Operating result                             |       325]      42                     262         896 = 1,327         1,585       1,580     1,954 =    2,052      2,680      2,698

                                                                                                                                                             Page 25 of 30

Section 26

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2016




                                        Page 26 of 30

GENERAL COMMITTEE MEETING AGENDA                                                                                                      14 NOVEMBER 2016

                                     Noosa Shire Council
                                     2016/17 Budget Statements
                                     For the period ending 30 June
                                     Annual Result                                | original | BRE | BRE                                                                    recast
                                                                                        NTE        PTT         2017         PT          rT          PP.         FLIP        PlIV4        PIPE}      PLY           Py.         FLIP.)
                                     See aa Ene Mech (n                               ST           ti          A           A            eA          a)          SA           ti          et          SK          St)          AT)
                                     Assets
                                       Current assets
                                       Cash and cash equivalents                        36,053]      50,163]     ~—«47,836) += 47,050    «44.852  «Ss «45,077     «44,886 =   45,130       45,253      44.727      43,518 + =  42,892
                                       Trade and other receivables                      8,316        8,316       8,328       8,531        8,776       8,966       9,248       9,491         9,780      10,010      10,371       10,662
                                       Inventories                                         104!         104         156         156         156          156         156         156          156         156         156         156
                                       Other current assets                               668         668          468          479         490         501         513         525         537          549         561          573
                                       Total current assets                             45,140]      59,251      56,789]     56,217       54274       54699       54803       55,301       55,727      55,442      54606        54,2863
                                       Non-current assets
                                      Investments                                      114,027]     114,027}    122,509)    «122,509 +=  122,509 += 122,509 += 122,509       »««122,509 += 122,509 +  122,509 +   +©122,509 += 122,509
                                       Property, plant & equipment                     943,468]     940,511]    936,187]    963,362     991,899    1,021,005    1,050,413   1,080,188   1,110,716   1,142,411    1,175,487   1,208,411
                                       Other non-current assets                         3,278        3,503       3,846       3,742         3,187      2,620       2,688       2,325         1,982       1,592       1,379        1,192
                                       Total non-current assets                       1,060,773            } 1,062,542     1,089,613   1,117,595   1,146,134    1,175,610   1,205,022   1,235,207   1,266,512    1,299,374   1,332,111
                                       Total assets                               | 4,105,914]    1,117,291] 1,119,330]    1,145,830   1,171,869   1,200,833    1,230,414   1,260,323   1,290,934   1,321,954    1,353,981   1,386,394

                                       Current liabilities
                                       Trade and other payables                          4,451       4,460       4,468       4,582        4,700       4,808       4,949       5,089        5,232       5,360       5,534         5,698
                                      Borrowings                                        3,079        3,079       3,040       3,241        3,439       3,658       3,887       4,130        4,387       4,664       4,928          503
                                      Provisions                                        5,091        5,091       4,394       4,482        4,594       4,709       4,826       4,947         5,071      5,198       5,327         5,461
                                       Other current liabilities                           390        390          548          558        568          578          588         599         610         621          633         645
                                       Total current liabilities                         13,012      13,021      12,450      12,863       13,301      13,753      14,251       14,765      15,300      15,843      16,422       12,306
                                       Non-current liabilities
                                      Borrowings                                        34,363]      34,363] «=  35,005]     32,104       «28,665 =   s(25,007   21,120       16,990       12,603      7,939       3,014         2,508
                                      Provisions                                          8,411      8.411       9,305       9,534         9,772      10,015      10,264       10,519      10,781      11,049      11,324       11,806
                                       Total non-current liabilities                    42,773          | 44.310            41,638      38,437       35,022      31,384      27,509       23,384       18,988      14,335       14,114
                                       Total liabilities                               55,785                               54,501        51,737     48,774      45,635       42,274     38,684       34,830      30,757        26,420
                                                                                   Ed
                                     Net community assets                             4,050,128]  1,061,497] 1,062,570]    1,091,328   1,120,132   1,152,059    1,184,779   1,218,049   1,252,250   1,287,123    1,323,224   1,369,974

                                       Asset revaluation surplus                        47,397|      47,237]     «46,962     70,240      94,036      118,369     143,243»    168,677 = 194,674        221,252     248,436      =—«276,258
                                       Retained surplus                               1,002,731]  1,014,260]  1,015,609]   1,021,088   1,026,095   1,033,690    1,041,537   1,049,372   1,057,576   1,065,871    1,074,788   1,083,716
                                       Total community equity                         1,050,128]  1,061,497]  1,062,570]   1,091,328   1,120,132   1,152,059    1,184,779   1,218,049   1,252,250   1,287,123    1,323,224   1,359,974
                                                                                                                                                   Page 26 of 30

Section 27

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2016




                                        Page 27 of 30

GENERAL COMMITTEE MEETING AGENDA                                                                                                14 NOVEMBER 2016

                                     Noosa Shire Council
                                     2016/17 Budget Statements
                                     For the period ending 30 June
                                     Annual Result                                [Original | BRI | BRE}                                                            recast
                                                                                        yu        2017        rv        PAU)        2019       2020      PAI         2022       2023       2024       2025       2026
                                     Statement of Cash Flows                            AUTH      SAU        ex)        EAU)        SAU        AAU)       SAU)       SAU        SAU        Ext)       SAU        EAU
                                     Cash flows from operating activities
                                        Receipts from customers                          74,742]    74,742)    74,901)    76843      79,122     81,224     83582      85937      88637      91149      94183      97,030
                                        Payments to suppliers and employees            (69,235)}  (69,358)}  (73,017)}  (71,289)    (73,170)  (75,114)    (77,180)   (79,431)   (81,739)   (84,010)   (86,504) + (89,131)
                                        Dividend received                                 3,142      3,142      3,142      3,220      3,301      3,383      3,468      3,554      3,643     3,734      3,828       3,923
                                        Interest received                                 4153       4,153      4,315      4,509      4.753      4,956     5,069      5,335      5,460      5,576      5,686       5,769
                                        Rental income                                     1,235      1,235     1,235       1,266     1,298      1,330      1,363       1,397      1,432     1,469       1,505      1,543
                                        Non-capital grants and contributions             5,530       5,530     5,580       5,604     5,617      5,632      5,643      5,658      5,673      5,689       5,702      5,719
                                        Borrowing costs                                 (2,176)} — (2,176)} = (2,213)} = (2,128)     (1,950)    (1,752)    (1,533)    (1,304)    (1,061)     (804)       (527)      (235)
                                       Other cash flows from operating activities          (11)       (11)       (11)       (11)       (11)       (11)        (12)       (12)       (12)       (12)       (12)       (12)
                                        Net cash inflow from operating activities        17,379}    17,256} += 13,932]    18,013»    18.959     19.648 =   20,399)    21,135 = 22,034 = 22,791 + = 23,859 =       24.606
                                     Cash flows from investing activities
                                        Payments for property, plant and equipment     (21,356)}  (24,937)|  (23,884)}  (21,175)    (22,264) + (22,495)   (22,791)   (23,166) + (23,941)   (25,141)   (26,566) + (26,466)
                                        Payments for intangible assets                  (1,231)} — (4,538))   (1,545)      (374)          :          -      (650)      (350)      (350)      (300)       (350)      (350)
                                        Proceeds from sale of property, plant and equipm      :          -          .          :          :          -          -          -          -          -          :          -
                                        Grants, subsidies, contributions and donations    6,567      6,799      6,810      5,440      4.338      6,500      6,500      6,500      6,500      6,500      6,500      6,500
                                       Other cash flows from investing activities            10         10         10         10         10         10         10         1
5	1	1	1	23	15	2411	1541	22	24	77	11
5	1	1	1	23	16	2543	1541	22	24	58	11
5	1	1	1	23	17	2676	1540	26	25	96	12
5	1	1	1	23	18	2809	1540	24	25	96	12
4	1	1	1	24	0	713	1610	2120	33	-1	
5	1	1	1	24	1	713	1610	37	25	96	Net
5	1	1	1	24	2	757	1610	54	25	95	cash
5	1	1	1	24	3	820	1610	69	25	96	inflow
5	1	1	1	24	4	896	1610	54	25	96	from
5	1	1	1	24	5	958	1610	105	33	95	investing
5	1	1	1	24	6	1071	1610	103	25	89	activities
5	1	1	1	24	7	1418	1610	90	32	59	(19,665)}
5	1	1	1	24	8	1551	1610	89	32	23	(18,609)]
5	1	1	1	24	9	1683	1610	90	32	93	(16,099)
5	1	1	1	24	10	1816	1610	90	32	86	(17,916)
5	1	1	1	24	11	1948	1610	90	32	87	(15,985)
5	1	1	1	24	12	2081	1610	89	32	85	(16,931)
5	1	1	1	24	13	2214	1610	89	32	75	(17,005)
5	1	1	1	24	14	2346	1610	90	32	78	(17,780)
5	1	1	1	24	15	2479	1610	89	32	66	(18,930)
5	1	1	1	24	16	2611	1610	90	32	66	(20,404)
5	1	1	1	24	17	2744	1610	89	32	28	(20,304)
4	1	1	1	25	0	684	1700	414	33	-1	
5	1	1	1	25	1	684	1700	57	25	96	Cash
5	1	1	1	25	2	749	1700	63	25	96	flows
5	1	1	1	25	3	817	1700	55	25	96	from
5	1	1	1	25	4	878	1700	109	33	96	financing
5	1	1	1	25	5	995	1700	103	25	96	activities
4	1	1	1	26	0	713	1766	2114	41	-1	
5	1	1	1	26	1	713	1770	101	25	96	Proceeds
5	1	1	1	26	2	821	1770	47	25	94	from
5	1	1	1	26	3	877	1770	117	33	95	borrowings
5	1	1	1	26	4	1315	1770	58	28	89	2,697
5	1	1	1	26	5	1447	1770	58	29	92	2,697
5	1	1	1	26	6	1580	1770	58	30	91	2,697
5	1	1	1	26	7	1725	1766	47	41	96	340
5	1	1	1	26	8	1891	1784	7	5	48	:
5	1	1	1	26	9	2024	1784	7	5	78	-
5	1	1	1	26	10	2156	1784	7	5	63	-
5	1	1	1	26	11	2289	1784	7	5	78	-
5	1	1	1	26	12	2422	1784	7	5	56	-
5	1	1	1	26	13	2554	1784	7	5	41	:
5	1	1	1	26	14	2687	1784	7	5	50	:
5	1	1	1	26	15	2820	1784	7	5	69	-
4	1	1	1	27	0	713	1820	2120	33	-1	
5	1	1	1	27	1	713	1820	122	33	96	Repayment
5	1	1	1	27	2	842	1820	21	25	93	of
5	1	1	1	27	3	870	1820	117	33	94	borrowings
5	1	1	1	27	4	1299	1820	76	32	42	(2,807)}
5	1	1	1	27	5	1432	1820	76	32	25	 (2,807)}
5	1	1	1	27	6	1564	1820	76	32	41	(2,770)}
5	1	1	1	27	7	1669	1815	11	42	36	+=
5	1	1	1	27	8	1697	1820	76	32	51	(3,040)
5	1	1	1	27	9	1788	1815	29	42	49	=
5	1	1	1	27	10	1829	1820	77	32	35	(3,241)
5	1	1	1	27	11	1962	1820	76	32	53	(3,439)
5	1	1	1	27	12	2051	1815	21	42	29	=
5	1	1	1	27	13	2095	1820	75	32	54	(3,658)
5	1	1	1	27	14	2180	1815	43	42	16	=
5	1	1	1	27	15	2227	1820	76	32	63	(3,887)
5	1	1	1	27	16	2320	1815	36	42	16	=
5	1	1	1	27	17	2360	1820	76	32	70	(4,130)
5	1	1	1	27	18	2492	1820	76	32	45	(4,387)
5	1	1	1	27	19	2625	1820	76	32	40	(4,664)
5	1	1	1	27	20	2716	1815	39	42	27	~—-
5	1	1	1	27	21	2757	1820	76	32	27	(4,928)
4	1	1	1	28	0	713	1890	2120	33	-1	
5	1	1	1	28	1	713	1890	37	27	95	Net
5	1	1	1	28	2	757	1890	54	27	95	cash
5	1	1	1	28	3	820	1890	69	27	95	inflow
5	1	1	1	28	4	896	1890	54	27	95	from
5	1	1	1	28	5	957	1890	107	33	96	financing
5	1	1	1	28	6	1073	1890	103	27	94	activities
5	1	1	1	28	7	1598	1890	42	32	84	(73)}
5	1	1	1	28	8	1697	1890	76	32	73	(2,700)
5	1	1	1	28	9	1829	1890	77	32	73	(3,241)
5	1	1	1	28	10	1924	1886	34	40	54	=
5	1	1	1	28	11	1962	1890	76	32	64	(3,439)
5	1	1	1	28	12	2057	1886	31	40	26	~—s-
5	1	1	1	28	13	2095	1890	75	32	39	(3,658)
5	1	1	1	28	14	2187	1886	34	40	0	~—s
5	1	1	1	28	15	2227	1890	76	32	53	(3,887)
5	1	1	1	28	16	2324	1886	11	40	38	+=
5	1	1	1	28	17	2360	1890	76	32	77	(4,130)
5	1	1	1	28	18	2492	1890	76	32	52	(4,387)
5	1	1	1	28	19	2587	1886	34	40	30	=
5	1	1	1	28	20	2625	1890	76	32	69	(4,664)
5	1	1	1	28	21	2714	1886	40	40	16	~—-
5	1	1	1	28	22	2757	1890	76	32	76	(4,928)
4	1	1	1	29	0	684	1980	188	25	-1	
5	1	1	1	29	1	684	1980	56	25	96	Total
5	1	1	1	29	2	748	1980	54	25	96	cash
5	1	1	1	29	3	809	1980	63	25	96	flows
4	1	1	1	30	0	1250	2021	1587	15	-1	
5	1	1	1	30	1	1236	2017	36	28	8	Ln
5	1	1	1	30	2	2830	2021	7	15	53	|
4	1	1	1	31	0	685	2037	2148	50	-1	
5	1	1	1	31	1	685	2050	37	25	96	Net
5	1	1	1	31	2	730	2050	97	25	96	increase
5	1	1	1	31	3	835	2050	19	25	96	in
5	1	1	1	31	4	863	2050	54	25	96	cash
5	1	1	1	31	5	925	2050	43	25	96	and
5	1	1	1	31	6	976	2050	54	25	94	cash
5	1	1	1	31	7	1038	2050	120	33	94	equivalent
5	1	1	1	31	8	1165	2050	49	25	96	held
5	1	1	1	31	9	1432	2050	76	32	31	(2,520))
5	1	1	1	31	10	1564	2050	76	32	0	(4,750)
5	1	1	1	31	11	1717	2050	56	32	62	(786)
5	1	1	1	31	12	1829	2050	77	32	5	~—(2,198)
5	1	1	1	31	13	1998	2050	40	25	71	225
5	1	1	1	31	14	2115	2050	55	32	16	~—(190)
5	1	1	1	31	15	2250	2037	51	50	96	243
5	1	1	1	31	16	2397	2050	39	25	84	124
5	1	1	1	31	17	2512	2050	56	32	56	(526)
5	1	1	1	31	18	2625	2050	76	32	48	(14,209)
5	1	1	1	31	19	2777	2050	56	32	7	~—=—«(627/
4	1	1	1	32	0	684	2120	2149	33	-1	
5	1	1	1	32	1	684	2120	97	33	96	Opening
5	1	1	1	32	2	789	2120	54	27	96	cash
5	1	1	1	32	3	851	2120	43	27	96	and
5	1	1	1	32	4	902	2120	54	27	96	cash
5	1	1	1	32	5	964	2120	133	33	96	equivalents
5	1	1	1	32	6	1301	2120	74	28	65	34.793]
5	1	1	1	32	7	1435	2120	73	29	74	52,683)
5	1	1	1	32	8	1567	2120	73	28	81	52,586]
5	1	1	1	32	9	1699	2120	74	28	50	47,836
5	1	1	1	32	10	1831	2120	75	28	80	47,050
5	1	1	1	32	11	1963	2120	75	28	62	44852
5	1	1	1	32	12	2096	2120	74	28	62	45.077
5	1	1	1	32	13	2229	2120	74	28	84	44886
5	1	1	1	32	14	2361	2120	75	28	85	45130
5	1	1	1	32	15	2494	2120	74	28	78	45253
5	1	1	1	32	16	2627	2120	74	28	78	44727
5	1	1	1	32	17	2759	2120	74	28	82	43.518
4	1	1	1	33	0	684	2190	2149	33	-1	
5	1	1	1	33	1	684	2190	88	33	97	Closing
5	1	1	1	33	2	779	2190	54	25	96	cash
5	1	1	1	33	3	842	2190	42	25	96	and
5	1	1	1	33	4	892	2190	54	25	96	cash
5	1	1	1	33	5	955	2190	132	33	96	equivalents
5	1	1	1	33	6	1301	2190	74	28	77	36,053)
5	1	1	1	33	7	1435	2190	73	29	72	50,163)
5	1	1	1	33	8	1566	2190	74	30	74	47,836)
5	1	1	1	33	9	1699	2190	73	28	78	47,050
5	1	1	1	33	10	1831	2190	74	29	80	44852
5	1	1	1	33	11	1963	2190	75	29	90	45077
5	1	1	1	33	12	2096	2190	74	30	79	44886
5	1	1	1	33	13	2229	2190	74	28	70	45130
5	1	1	1	33	14	2361	2190	75	29	69	45.253
5	1	1	1	33	15	2494	2190	74	30	85	44727
5	1	1	1	33	16	2627	2190	74	30	85	43518
5	1	1	1	33	17	2759	2190	74	28	78	42,892
4	1	1	1	34	0	1918	2288	289	44	-1	
5	1	1	1	34	1	1918	2290	105	42	96	Page
5	1	1	1	34	2	2039	2290	48	32	96	27
5	1	1	1	34	3	2103	2288	42	35	95	of
5	1	1	1	34	4	2158	2290	49	33	95	30

Section 28

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2016




                                        Page 28 of 30

GENERAL COMMITTEE MEETING AGENDA                                                                                                  14 NOVEMBER 2016

                                       Noosa Shire Council
                                      2016/17 Budget Statements
                                      For the period ending 30 June
                                     Annual Result                                   } Orginal | BRI] BRA |                                                        orecast
                                                                                        2017       2017       A          ANT)      2019       2020       PAV         Aye)       2023      Phy        2025       rAVYAs
                                      Statement of Changes in Equity                    AS                               AAA                                        A
                                      Asset revaluation reserve
                                         Opening balance                                 24,496)    24,496] = 24.547)     46,962     70.240»    94.036)»  118,369    143,243»   168.677 = 194.674 = 221,252     248,436
                                         Increase in asset revaluation surplus           22.901)    22,744]    22.445) = 23.278 »=— 23.797 =    24.332)    24.874 ~=— 25.434. =  25.997 = 26.578 §=—s 27,184 =   27,822
                                         Closing balance                                 47,397)    47,237)    46,962}    70.240 = 94.036»     118,369    143,243    168,677 = 194,674    221,252    248,436    276,258
                                     Retained surplus
                                         Opening balance                                996,040} 1,007,468) 1,008,631} 1,015,609  1,021,088  1,026,095  1,033690   1,041,537  1,049.372  1,057,576  1,065,871  1,074,788
                                        Net result                                       6,691       6,792}     6,978)     5480       5007       759        7847       7,836      8204       829       8917       8928
                                         Closing balance                               1,002,734] 1,014,260) 1,015,609} 1,021,088 1,026,095  1,033,690  1,041,537  1,049.372  1,057,576  1,065,871  1,074,788  1,083,716
                                      Total
                                         Opening balance                               1,020,536} 1,031,965) 1,033,148} 1,062,570 1,091,328  1,120,132  1,152,059  1,184,779  1,218,049  1,252,250  1,287,123  1,323,224
                                        Net result                                       6,691       6792}      6978)      5480       5007       759        7847       7,836      8204       829       8917       8928
                                         Increase in asset revaluation surplus           22,901)    22,744] = 22.445)  = 23,278 §=— 23.797 = 24,332)       24.874 «=  25,434     25,997 ~=— 26.578 =  27,184 =   27,822
                                         Closing balance                               1,050,128} 1,061,497) 1,062,570} 1,091,328 1,120,132  1,152,059  1,184,779  1,218,049  1,252,250  1,287,123  1,323,224  1,389,974

                                                                                                                                              Page 28 of 30

Section 29

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2016




                                        Page 29 of 30

GENERAL COMMITTEE MEETING AGENDA                                                                                      14 NOVEMBER 2016

                                   Noosa Shire Council
                                  2016/17 Budget Statements
                                  For the period ending 30 June
                               | indicator                 | Target | Original | BRI |            BR2_                                                  Forecast
                                                                              rad         ru                    2018        2019       2020      PAYA        2022      PAR}        2024       PAs)        2026
                                  Operating Surplus Ratio         0-10%        0.4%       0.2%       0.4%       0.2%       0.8%        1.3%       1.5%       1.4%       1.8%       2.0%       2.4%        2.2%
                                  Net Financial Liabilities Ratio  <60%       12.0%      -3.9%       0.0%       5.5%       6.0%       9.2%      -12.0%     -15.3%     -18.6%     -21.2%      -23.3%     -26.1%
                                  Asset Sustainability Ratio       >90%       95.7%]    111.0%}    110.1%      98.6%      97.8%      97.9%       96.6%      95.9%      97.1%     100.1%     103.9%     100.0%

                                  Operating Surplus Ratio
                                  Measures the extent to which revenues raised cover operational expenses
                                  only or are available for capital funding purposes or other purposes.
                                  Calculation: Net operating result divided by total operating revenue, expressed as a % (excluding capital revenue or expenses).
                                  Target: between 0% and 10%

                                  Net Financial Liabilities Ratio
                                  Measures the extent to which the net financial liabilities of Council can
                                  be repaid from operating revenues.
                                  Calculation: (total liabilities less current assets) divided by
                                  total operating revenue, expressed as a %.
                                  Target: not greater than 60%.

                                  Asset Sustainability Ratio
                                  This ratio reflects the extent to which the infrastructure assets managed by Council
                                  are being replaced as they reach the end of their useful lives.
                                  Calculation: capital expenditure on the replacement of infrastructure assets
                                  (renewals) divided by depreciation expense, expressed as a %.
                                  Target: greater than 90%.

                                                                                                                                 Page 29 of 30

Section 30

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2016




                                        Page 30 of 30

GENERAL COMMITTEE MEETING AGENDA                                                             14 NOVEMBER 2016

                                            Noosa Shire Council
                                            2016/17 Budget Statements
                                            For the period ending 30 June                               | Original | BR1 | BR2 |
                                                                                                           rl A           rs        rls
                                            OFT ic MN Cece lel                                              PAY          SAUL       SA
                                            Asset Management                                                    765       765
                                           Bridges                                                              100       380
                                            Cemeteries                                                           18        18 |      18]
                                            Coastal, Canals and Waterways                                      400        417
                                            Commercial Land & Property                                        2,900     2,991
                                            Community Facilities                                                662       717
                                            Corporate buildings                                                 150       209
                                            Environmental Assets, bushland tracks & Trails                      -          33        33
                                            Fleet & Plant Replacement                                         1,765     2,154      2,154
                                            Gravel Road Network                                                410        410       410
                                            Holiday Parks                                                       888       924       924
                                            Information Technology                                              384       438
                                            Parks & Playgrounds                                                 685       825
                                            Pathways & Enabling Facilities                                    1,810     2,484
                                            Planning Scheme                                                     847|    1,100
                                            Public Transport Infrastructure                                   1,200     1,200
                                            Sealed Road Network                                               4,000     5,061
                                            Sports Grounds & Facilities                                         -          50
                                            Stormwater Drainage                                               2,085     2,312
                                            Streetscapes and Road Corridor                                      50         79
                                            Transport and Infrastructure Management                           3,485     3,806
                                            Waste Management                                                   498        618 |    618 |
                                            Total Capital works Program                                | 23,401]       26,993 po

                                                                                                      Page 30 of 30

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.