Attachment 3F1 - Digital Hub Landscape Concept Plan

Attached to the e-mail MCU16/0044 & REC16/0009 Development Application - Att 3F1 Email 3 of 4.

of 11

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                 WWW.CONLONGROUP.COM.AU
                                                 E [email protected]
                                                 P (07) 5309 6002




                                                 RUFOUS STREET MASTER PLAN
                                                 IT HUB & EXPANSION
                                                 PEREGIAN BEACH
                                                 QUEENSLAND

                                                 LANDSCAPE CONCEPT PACKAGE

                                                 ISSUE A

                                                 APRIL 2016




                                                 © COPYRIGHT
                                                 THIS PACKAGE IS COPYRIGHT AND THE PROPERTY OF

                                                 CONLON GROUP PTY. LTD. AND MUST NOT BE RETAINED, COPIED/

                                                 REPRODUCED OR USED WITHOUT WRITTEN AUTHORITY.



RUFOUS STREET MASTER PLAN - IT HUB & EXPANSION
                                                                                                      Page 1
Log in to download the original file

Attachment 3F1 - Digital Hub Landscape Concept Plan.pdf · 10.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 10 pages

Page 2

CONTENTS
1   The Site
         Context Plan                            3

2   The Project
         Design Intent - Vision                  4

3   Landscape Concept
         Landscape Concept - Site Plan           5
         Landscape Concept - Ground Floor Plan   6
         Landscape Concept - First Floor Plan    7

4   Materials
         Materials Palette                       8

5   Plants
          Suggested Plant Species                9




RUFOUS STREET MASTER PLAN - IT HUB & EXPANSION
                                                     Page 2

Page 3

                                                                                              KEY
                                                                                              1. Improved street frontage to David Low
                                                                                                  Way, integrated bus stop and pedestrian
                                                                                                  thoroughfare along and into site.
                                                                                              2. Pedestrian lane way.
                                                                                              3. Converted existing community house
                                1
                                                                                                  building for IT enterprise expansion.
                                                                                              4. Existing landscape surrounds to new IT
                                                                                                  Building.
                                                                                              5. New IT enterprise digital hub building.
                                                                                              6. Pocket square, cafe and public amenities.
                                         5                                                    7. Commercial and public parking.
                        3                                                                     8. Linear pedestrian park and view corridor.
                                                                                              9. Peregian green parklands and natural
                                                           7
                            2
                                             6                                                    amphitheatre.
                    4                                                                         10. Children interactive playscape.
                                                                                              11. Family exercise stations.
                                                                                              12. Turf break out event space.
                                                               8
                                         7
                                                                                              13. Contoured public native permaculture
                                                                                                  gardens and elevated look out.
                                                                        7                     14. Future new community house building
                                                                                                  with public terrace, pedestrianised green
                                                                                                  roof and under cover car parking -stage 2.
                                                                                              15. Public amenities building with green roof.
                                                                                              16. Rufous Street informal parking zone.
                                                     12

                                    13
                                                 9             10

                                                                                  14
                                                                   11

                                                      16




                                                                            15




                                                                                                                                    01
CONTEXT SITE PLAN


RUFOUS STREET MASTER PLAN - IT HUB & EXPANSION
                                                                                 1:400 @ A3
                                                                                                        Landscape Concept
                                                                                                                    ncePage
                                                                                                                        pt3

Page 4

   VISION
   The landscape palette is subtle and natural, the materials are local and hold a connection to the place. The gardens are influenced by the natural surroundings and is tied to the place through
   the vegetation the natural materials and the local wildlife it attracts.




RUFOUS STREET MASTER PLAN - IT HUB & EXPANSION                                                                                                                                                 02
                                                                                                                                                                                           Concept
                                                                                                                                                                                            oncept
                                                                                                                                                                                            once
                                                                                                                                                                                               ePage
                                                                                                                                                                                                 pt4

Page 5

                                                                                                                  KEY
                                                                                                                  1. Improved streetscape frontage to David
                                                                                                                      Low Way.
                                                                                                                  2. Landscaped site frontage integrating bus
                                                                         3                                            stop and pedestrian thoroughfare.
                                          1                                                                       3. Additional street trees to David Low Way.
                                                                                                                  4. Disability access and bike storage.
                                  2
                                              7                          7
                                                                                                                  5. Treed Pedestrian lane way.
                                                                                  16
                  9                                                                                               6. Converted existing community house
                          4           8
                                                                                       7                              building for IT enterprise expansion.
                                                                 8
                                                                                                                  7. Structured planting palette of native
                                                                                                                      plants to Peregian region.
                                                                                                             14
                                                                                                                  8. Planted trellis on building facade.
                                                                                                                  9. Existing landscape surrounds retained to
                              5                   10                                                                  new IT Building.
                                                                                                                  10. New IT enterprise digital hub building.
                      6
                                                                                                                  11. Pocket square, cafe and integrated public
                                                                                                        13            amenities.
                                                                             12
                                                                                                                  12. Commercial and public parking with
                                                            11                                                        permeable grasscrete parking bays and
                                                                                                                      native shade trees throughout.
            9                                                                                                     13. Linear pedestrian park and amenities.
                                                                                                                  14. Wide pedestrian avenue and View
                                  8                                                                                   corridor.
                                                                                                                  15. Pedestrian shared zone.
                                                                                                                  16. Entry signage.
                                                                     7       7
                                                                                                              7


                                                       12
                                                                                               15



                                                                                                                  12
                                                                                                                                   7




                                                                                                                        LOCATION MAP


                                                                                                                                                     03
SITE PLAN


RUFOUS STREET MASTER PLAN - IT HUB & EXPANSION
                                                                                           1:400 @ A3
                                                                                                                            Landscape Concept
                                                                                                                                       oncept
                                                                                                                                       once
                                                                                                                                          ePage
                                                                                                                                            pt5

Page 6

                                                                                                                                     7
                                                                                                                                              KEY
                                                                                                                                              1. Improved streetscape frontage to David
                                                                                                                                 1                Low Way.
                                                                                                                                              2. Landscaped site frontage using a
                                                                                       4                                                          selection of low growing native species.
                                                                                                                                              3. Bus stop and sandstone seating wall.
                                                                                                                                              4. Improved existing concrete footpath.
                             2               2                                              3                                                 5. Integrally coloured concrete pavement.
                                                                   14                                       2
                                                                                                                                              6. Building break out space with feature
                                                                                                                                                  tree surrounded by sandstone seating
                    6
                                             8                                                        14                                          walls.
                                                                                                                                          6   7. Additional street trees to David Low
                                                                                                                      15
                                                                                                                                                  Way turfed verge to shade pedestrian
                                                                             14
                                                 9
                                                                                            11
                                                                                                                                11                thoroughfare.
                                                                        16                                                                    8. Pedestrian entry paths and Disability
                                                                                                                                                  access ramp.
                                                                                                                                              9. Bike storage station.
                                                                   10                                                                         10. Treed Pedestrian lane way and low level
                                                                                                                                                  planting creating threshold to building
                                                                                                                                                  edges between building access points.
                                                                                                                17                            11. Pocket planter in pavement to house
                                                                                                                                                  trellis climbers.
                                        12                                                                                                    12. Converted existing community house
                                                                                                                                                  building for IT enterprise expansion.
                                                                                                                                              13. Pocket square, cafe and integrated public
                                                     10                                                                                           amenities.
                                                                                                                                              14. Integrated sandstone seating wall.
                                                                                                                                              15. Sandstone pavement surrounding
                                                                                                                 14                               building entry points and pocket square.
                                                                                                                                              16. Native gardens surrounding outdoor
                                                                                                                                                  spaces.
                                                                                                                                         15   17. New IT enterprise digital hub building.
                                                                                                                                              18. Commercial and public parking with
                                                          5                                       9
                                                                                                                                13                permeable grasscrete parking bays and
                                                                                                                                                  native shade trees throughout.
                                                                                                                                              19. Linear pedestrian park and amenities.
                                                                                                                                              20. Wide pedestrian avenue and View
                                                                                                                                                  corridor.
                                                                                  16                                                          21. Pedestrian shared zone.
                                                              10                                                                              22. Entry signage



                                                                                                           16




                                                                    5
                                                                                                                           18



                                                                                                                                                  LOCATION MAP


                                                                                                                                                                               03
GROUND FLOOR PLAN


RUFOUS STREET MASTER PLAN - IT HUB & EXPANSION
                                                                                           1:200 @ A3
                                                                                                                                                      Landscape Concept
                                                                                                                                                                 oncept
                                                                                                                                                                 once
                                                                                                                                                                    ePage
                                                                                                                                                                      pt6

Page 7

                                                    1                                                  KEY
                                                                                                       1. Improved streetscape frontage to David
                                    7                                                                      Low Way.
                                                                                                       2. Landscaped site frontage using a small
                                                                           2                               selection of low growing native species.
                                                4                                                      3. Bus stop and sandstone seating wall.
                                                                                                       4. Improved existing concrete footpath.
                                                        2                                              5. Integrally coloured concrete pavement.
                                            2
                                                                                                       6. Building break out space with feature
          5
                                                                                                           tree surrounded by sandstone seating
                               6                                                                           walls.
     14                                                                                                7. Additional street trees to David Low
                                                                 22
                                                                                                           Way turfed verge to shade pedestrian
          15                                                                                               thoroughfare.
     11
                               11
                                                                                                       8. Pedestrian entry paths and Disability
                                                                                                           access ramp.
                                                                                                       9. Bike storage station.
                                                                                             5
                                                                                                       10. Treed Pedestrian lane way and low level
                                            5
                                                                                                           planting creating threshold to building
                                                                                                           edges between building access points.
                                                                                                       11. Pocket planter in pavement to house
               17                                                                                          trellis climbers.
                                        9                                                              12. Converted existing community house
                                                                                                           building for IT enterprise expansion.
                                                                                                       13. Pocket square, cafe and integrated public
                                                                                                           amenities.
                                                                                                       14. Integrated sandstone seating wall.
                                                                                                       15. Sandstone pavement surrounding
                     14
                                                                               14                          building entry points and pocket square.
                                                                                     19                16. Native gardens surrounding outdoor
          15                                                                                               spaces.
                                                            18                                         17. New IT enterprise digital hub building.
                    13                                                                                 18. Commercial and public parking with
                                                                                                           permeable grasscrete parking bays and
                                                                                                           native shade trees throughout.
                                                                                                       19. Linear pedestrian park and amenities.
                                                                                     14                20. Wide pedestrian avenue and View
16                                                                                                         corridor.
                                                                                                       21. Pedestrian shared zone.
                                                                                20
                                                                                                       22. Entry signage



                          14
     16




                                                                      21

                                                                                                           LOCATION MAP


                                                                                                                                        03
GROUND FLOOR PLAN


RUFOUS STREET MASTER PLAN - IT HUB & EXPANSION
                                                                                          1:200 @ A3
                                                                                                               Landscape Concept
                                                                                                                          oncept
                                                                                                                          once
                                                                                                                             ePage
                                                                                                                               pt7

Page 8

                                                              KEY
                                     5                        1. Improved streetscape frontage to David
                                                                  Low Way.
                                                              2. Landscaped site frontage using a small
     18                   15
                                                                  selection of low growing native species.
                                                              3. Bus stop and sandstone seating wall.
                                                              4. Improved existing concrete footpath.
                                                              5. Integrally coloured concrete pavement.
                                    15
                                                              6. Building break out space with feature
                                                                  tree surrounded by sandstone seating
                               19                                 walls.
                                                              7. Additional street trees to David Low
                                                                  Way turfed verge to shade pedestrian
                                                                  thoroughfare.
                                                              8. Pedestrian entry paths and Disability
                                                                  access ramp.
                         20
                                                              9. Bike storage station.
                                                              10. Treed Pedestrian lane way and low level
                                                                  planting creating threshold to building
                                                                  edges between building access points.
                                                              11. Pocket planter in pavement to house
                                                                  trellis climbers.
                                                              12. Converted existing community house
                                                                  building for IT enterprise expansion.
                                                              13. Pocket square, cafe and integrated public
                                                                  amenities.
                    21                                        14. Integrated sandstone seating wall.
                                                              15. Sandstone pavement surrounding
                                                                  building entry points and pocket square.
                                                              16. Gardens within pocket square planted
                                                                  with natives and fringed by sandstone
                                                                  seating walls.
                                                              17. New IT enterprise digital hub building.
                                                              18. Commercial and public parking with
                                                                  permeable grasscrete parking bays and
                                                                  native shade trees throughout.
                                                              19. Linear pedestrian park and amenities.
                                                              20. Wide pedestrian avenue and View
                                                                  corridor.
                                                              21. Pedestrian shared zone.
                                                              22. Entry signage




                                                                  LOCATION MAP


                                                                                               03
GROUND FLOOR PLAN


RUFOUS STREET MASTER PLAN - IT HUB & EXPANSION
                                                 1:200 @ A3
                                                                      Landscape Concept
                                                                                 oncept
                                                                                 once
                                                                                    ePage
                                                                                      pt8

Page 9

                                                                                  KEY
                                                                         1        1. Native street tree canopies.
                   1                                                              2. Native climber planted below in
                                                                                      gardens and attached to building
                                                                                      trellis facade.
                                                                                  3. Native carpark tree canopies.
                                                                                  4. Converted existing community
                                                                                      house building for IT enterprise
                                                                                      expansion.
                                                                                  5. Pocket square, cafe and integrated
                                            2                                         public amenities.
                                                                     2
                                                                                  6. Integrated sandstone seating wall.
                                                                                  7. Sandstone pavement surrounding
                                                                                      building entry points and pocket
                                                                                      square.
                                                                                  8. New IT enterprise digital hub
                                                                                      building.
                                                                                  9. Commercial and public parking with
                                                 8                                    permeable grasscrete parking bays
              11                                                                      and native shade trees throughout.
                                                                                  10. Tree canopy to linear pedestrian
                                   12
                                                                                      park.
                       4                                                          11. Green roof to new IT enterprise
                                                                             10       digital hub building.
                                                                                  12. Tree canopy to lane way.
                                                                                  13. Gravel roof top to cafe structure.
                                                         5




                                                                13           3



                                        2



                                                     3




                                                                                  LOCATION MAP


                                                                                                             03
FIRST FLOOR PLAN


RUFOUS STREET MASTER PLAN - IT HUB & EXPANSION
                                                             1:200 @ A3
                                                                                     Landscape Concept
                                                                                                oncept
                                                                                                once
                                                                                                   ePage
                                                                                                     pt9

Page 10

RUFOUS STREET MASTER PLAN - IT HUB & EXPANSION                eri04
                                                 Landscape Materials
                                                              eriPage
                                                                  als10
                                                                  als


[OCR of page images]
 

 

RUFOUS STR

 

 

 

 

ER PLAN - IT HU

 

B &

 

EXPANSION

CONLON
GROUP

 

 

 

Landscape Materials

Page 10

Page 11

                       1                         2                    3         4                       5                         6                     7




                       8                         9                   10         11                     12                         13                    14




                       15                        16                  17         18                     19                         20                    21




                      22                         23                  24         25                     26                         27                    28
               TREES                                                                 FERNS
               1.    Pandanus Tectorious              Screw Pine                     14.   Asplenium bulbiferum                  Hen and Chicken Fern
               2.    Tristaniopsis                    Laurina Luscious               15.   Blechnum cartilagineum                Gristle Fern
               3.    Cupaniopsis anacardioides        Tuckeroo                       16.   Asplenium australasicum               Bird Nest Fern
               4.    Agathus robusta                  Queensland Kauri Pine          GROUNDCOVERS
               4     Elaecarpus eumundi               Eumundi Quondong               17.   Isolepis nodosa                       Knobby Matt Rush
               5.    Xanthorea johnsonii              Grass Tree                     18.   Dianella caerulea                     Blue Flax Lilly
               7.    Cyathea cooperii                 Tree Fern                      19.   Adjuga australis                      Austral Bugle
               PALMS                                                                 20.   Grevillea cultivar ‘Bronze Rambler’   Bronze Rambler
               8.    Licuala ramsayi                  Australian Fan Palm            21.   Carpobrotus glaucescens               Pig Face
               9.    Licuala elegans                  Elegant Round Leaf Palm        22.   Scaevola albida                       White-Fan Flower
               SHRUBS                                                                23.   Banksia oblongifolia                  Dwarf Banksia
               10.   Banksia robur                    Swamp Banksia                  24.   Lomandra confertafolia                Dwarf Mattrush
               11.   Lepidozamia hopei                Hope’s Lepidozamia             25.   Casurina glauca                       Cousin it
               12.   Austromyrtus dulcis              Midgen Berry                   CLIMBERS
               13.   Baeckea Frutescens               Weeping Baeckea                26.   Pandorea pandorana                    Wonga Wonga Vine
                                                                                     27.   Hibbertia scandens                    Twining Guinea


RUFOUS STREET MASTER PLAN - IT HUB & EXPANSION
                                                                                     28.   Hardenbergia violacea                 False Sarsaparilla
                                                                                                                                                             05
                                                                                                                                        Suggested Speciess List
                                                                                                                                                           LPage 11

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.