Original source · versioned page text
Attachment 3F1 - Digital Hub Landscape Concept Plan
Attached to the e-mail MCU16/0044 & REC16/0009 Development Application - Att 3F1 Email 3 of 4.
The original of this document is very large (10.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn 7
KEY
1. Improved streetscape frontage to David
1 Low Way.
2. Landscaped site frontage using a
4 selection of low growing native species.
3. Bus stop and sandstone seating wall.
4. Improved existing concrete footpath.
2 2 3 5. Integrally coloured concrete pavement.
14 2
6. Building break out space with feature
tree surrounded by sandstone seating
6
8 14 walls.
6 7. Additional street trees to David Low
15
Way turfed verge to shade pedestrian
14
9
11
11 thoroughfare.
16 8. Pedestrian entry paths and Disability
access ramp.
9. Bike storage station.
10 10. Treed Pedestrian lane way and low level
planting creating threshold to building
edges between building access points.
17 11. Pocket planter in pavement to house
trellis climbers.
12 12. Converted existing community house
building for IT enterprise expansion.
13. Pocket square, cafe and integrated public
10 amenities.
14. Integrated sandstone seating wall.
15. Sandstone pavement surrounding
14 building entry points and pocket square.
16. Native gardens surrounding outdoor
spaces.
15 17. New IT enterprise digital hub building.
18. Commercial and public parking with
5 9
13 permeable grasscrete parking bays and
native shade trees throughout.
19. Linear pedestrian park and amenities.
20. Wide pedestrian avenue and View
corridor.
16 21. Pedestrian shared zone.
10 22. Entry signage
16
5
18
LOCATION MAP
03
GROUND FLOOR PLAN
RUFOUS STREET MASTER PLAN - IT HUB & EXPANSION
1:200 @ A3
Landscape Concept
oncept
once
ePage
pt6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.