Council archive · source document
Decision Letter - Change to an Existing Approval [As Published] · 132005.2124.02
2005/2124
Land Development
Car Parking
9. Carparking shall be provided within the site generally as shown on drawing number 0219.04
dated Jan 2006 by Kidd & Co, except as modified herein.
10. The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
for user class 2 with allowance for vehicles to enter and leave the site in a forward gear and
with a minimum head clearance (headroom) at any point of 2.2m.
11. All carparking shall be kept, maintained and line-marked in a condition fit for use.
12. All staff carpark spaces shall be clearly defined by line marking each space with the words
“Staff Parking Only” and by sign posting each space with a similar wording.
Sewer Mains
13. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
14. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
Earthworks
15. Earthworks required on site shall be carried out in accordance with Council’s Planning
Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or the blockage of, or interference with, any natural
watercourses.
16. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences and/or buildings and/or structures and/or lands that border the development site.
Fences that are affected shall be replaced prior to the Building Certifier issuing the Certificate
of Classification. In this regard any fences to be replaced shall be clearly shown on the plans
submitted for Operational Works approval.
Site Stability
17. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification, determine the risk of erosion due to major storm events
including wave action and establish whether any measures are required to protect the stability
of the existing and proposed buildings, adjoining buildings and/or structures and/or lands, and
make recommendations on the type of foundation system(s) best suited for the proposed
development. The recommendations of this report shall be incorporated into the design and
construction of the proposed development.
18. A Geotechnical Engineer or similar qualified expert shall supervise the demolition of those
parts of the existing building and the excavation and construction of the proposed
development to ensure that the works are carried out in accordance with the
recommendations of the abovementioned report in order to protect the stability of adjoining
buildings and/or structures and/or lands.
General
19. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
20. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
Page 3 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 137 KB (small file)
- File type
No other editions are linked here.