Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

AppendixB_CodeandOverlayAssessment · MCU16/0078

Attached to the e-mail MCU16/0078 - Development Application.

of 133

Text shows just the words. Original shows the document exactly as it was published.

Appendix B Code and Overlay Assessment
45 Elizabeth Street, Noosaville



 Water Sensitive Design Code (Division 20)
 Probable solution                                       Specific outcome                             Response                                                Complies
 on Map SBC—                                             the SEQ Regional Plan Implementation
                                                         Guideline No. 7 for Water Sensitive
     a) run-off treatment occurs within the site; and    Urban Design.
     b) drainage lines are only used for final
     polishing of run-off.



 Town water supply connections

 O8 Backflow devices or similar systems ensure           S8.1 A suitable backflow prevention          A detailed Stormwater Management Plan will be           YES
 water reuse facilities have no impact on the            device is installed to protect the potable   prepared and submitted for approval at Operational
 quality of the town mains water.                        water within the reticulated water           Works stage.
                                                         supply in accordance with AS/NZS
                                                         3500:2003 Plumbing and Drainage.

 Use of natural treatments and systems

 O9 Natural treatment strategies, including grass        S9.1 & S10.1 Development complies            The development will comply with the SEQ Regional
 swales and bio-retention systems, vegetated             with the water quality standards in          Plan Implementation Guideline No. 7 for Water
 filtration strips and gross pollutant traps, are used   Table 2 of the SEQ Regional Plan             Sensitive Urban Design as required. A detailed
 wherever practicable;                                   Implementation Guideline No. 7 for           Stormwater Management Plan will be prepared and
                                                         Water Sensitive Urban Design.                submitted for approval at Operational Works stage.




 O10 Within the Shire Business Centre, as shown          S9.1 & S10.1 Development complies            The site is not located in the Shire Business Centre.   N/A
 on Map SBC— where necessary, drainage lines are         with the water quality standards in
 ecologically enhanced to ensure that the water          Table 2 of the SEQ Regional Plan
                                                         Implementation Guideline No. 7 for


                                                                                                                                                                         119

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

AppendixB_CodeandOverlayAssessment.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.